CITY OF COLLEGE STATION
FINAL PLAT
for
Dove Crossing Phase 6
10- 00500146
SCALE: 30 lots on 14.58 acres
LOCATION: South of the intersection of Graham Road and Alexandria
Avenue
ZONING: R -1 Single - Family
APPLICANT: Ed Froehling, property owner
PROJECT MANAGER: Matthew Hilgemeier, Staff Planner
mhilgemeier @cstx.gov
RECOMMENDATION: Approval
Planning & Zoning Commission Page 1 of 4
September 2, 2010
• 0
�Q � p� Q pQ" 1 °Ay
"' �Q < + O . �J� ) � J
�i � O� ..e0 , LT_ d
d pi � Sb ° ti ,...1 O O <�b y Q3'
Qi ��ti �p �b 1'I'b 2 0 •
O
d }
p � } � �� 0� Q � OJ O d 7 � O'� 5� � Od' 1 � �� 4,, ,,, ..
o `- s ' - I , ' ''4' °S
.' Q ,. ,e- Z 0d, ,s02 S fO 0 60
b 9 .(
�O2 S G J')' tii
d' ? 5 '' ' 0 6 0 . 04 4 ( 4 o , p o 0 1
ta
l' Q U
P " " 0 'P -- ' ∎, ' . 2 ys � -k � � ry z.. f ° fi b ,s "/1 / 1 p� °
--76,. �O ��`yb > �d?y 0
O
6:: tie � ? Q CO
._ . O bZ' ' e .C° _
\,,i, " )�
cep,. q ..%''
G�
,r, •-, : 11 ,.. - -,, , ,,,,
O)
i
'-', c ? - 5- .40. „„ ilf „._,
` - ,a, ?d, �� 9. b S O
r ) p) O�� `r ? , Oyp b d � TM t U
r b�S d ., ,, -if >
GA P dr \ O O Q -b- , `�� ,vs ,
PP !O O fit` \20 Sao
q'?"" . d , 1, Q q - ' �d
1 Oi � W
p l f es. � t .:i to ��� 5
2 b , .. O
J Q0,., b ape �SG �� d `�� �_� y, ��OOd Z d e � ° o 5
$
O d„ did W
O Fy
rj m" u s, O4, SO '✓". i, `a 7y O � O
�• S 3 ' =� > W
d Q o�� �2 P? d'p ,r ,�. t'
4• 9 ,(6,,,„, O \ (< ry� R
P O o
Planning & Zoning Commission Page 2 of 4
September 2, 2010
DEVELOPMENT HISTORY
Annexation: 1993
Zoning: A -O Agricultural Open to R -1 Single- Family (2004)
Preliminary Plat: This subdivision was originally preliminary platted in 2004
and a revised preliminary plat adjusting phase lines was
approved in 2005. At the July 1, 2010 Planning and Zoning
Commission regular meeting, a new preliminary plat was
required and approved because the previous preliminary
plat had expired due to inactivity of the project.
Site Development: This portion of the Dove Crossing subdivision is vacant.
Phases 1A, 1B, 1C, 2, 3, 4, and 8 have been filed for
record and are largely built out. Phase s1A and 1B were
approved in 2005. Phases 1C and 2 were approved in
2006. Phases 3 and 4 were approved in 2007, and Phase
8 was approved in 2008.
COMMENTS
Parkland Dedication: Parkland dedication fees have been assessed in lieu of
land for 30 Tots at $556.00 per lot for a total of $16,680.00.
The applicant made full payment at the time of application
for this final plat.
Greenways: A multi -use path, as identified in the Bicycle, Pedestrian,
and Greenways Master Plan follows Lick Creek within the
approximate five -acre area being dedicated to the City as
greenway. The multi -use path has been funded as part of
the 2008 Bond Election and is anticipated to be designed
and constructed by the City in the coming years. Bike
lanes as identified in the Bicycle, Pedestrian, and
Greenways Master Plan will be striped and signed by the
City along Alexandria Avenue and Eagle Avenue as
funding become available.
Pedestrian Connectivity: Six -foot sidewalks will be provided along Alexandria
Avenue and Eagle Avenue. A four -foot sidewalk will be
provided along Dove Run Trail, Dove Chase Lane, and
Neelley Lane.
Bicycle Connectivity: Bike lanes, as identified in the Bicycle, Pedestrian, and
Greenways Master Plan, will be striped and signed by the
City along Alexandria Avenue as funding becomes
available.
Impact Fees: N/A
REVIEW CRITERIA
Planning & Zoning Commission Page 3 of 4
September 2, 2010
•
Compliance with Subdivision Regulations: This final plat complies with the City of
College Station Subdivision Regulations as set forth in the City of College Station Unified
Development Ordinance and with the approved preliminary plat.
STAFF RECOMMENDATIONS
Staff recommends approval of this final plat.