Loading...
HomeMy WebLinkAboutCorrespondences Joe Schultz From: Stephen Cast <wsud.sc @verizon.net> Sent: Friday, June 08, 2012 1:41 PM To: Joe Schultz Subject: Re: Meadowcreek - Phase 4B Joe Schultz, Wellborn Special Utility District has inspected and approved the water lines in phase 4B of Meadowcreek development. Stephen Cast General Manager Wellborn SUD Original Message From: Schultz To: Stephen Cast Sent: Wednesday, June 06, 2012 10:33 AM Subject: Meadowcreek - Phase 4B Stephen, The contractor is complete with the construction of this phase. Attached are the hydrant flow test report and the water sample test reports. Please let us know if Wellborn SUD will accept the waterlines in this phase of the development. Thanks Joe Joe Schultz, P.E. Schultz Engineering, LLC 2730 Longmire, Suite A College Station, TX 77845 Office 979.764.3900 1 SCHULTZ ENGINEERING, LLC FIRM #4538 WATER SYSTEM FIRE HYDRANT FLOW TEST REPORT Date: 6/6/2012 Water System Owner: Wellborn SUD Development Project: Meadowcreek Subdivision - Phase 4B Flow Test Location: Nozzle size (in.): 2 1/2" Discharge Coeff: (c) = 0.90 Pitot Reading (psi): 54 Flowrate Formula: Q= 29.84cd 1230 c = discharge coeff. Flowrate (gpm): d = orifice size (in) P = pitot pressure (psi) Pressure Gauge Location: Static Pressure (psi): 62 Residual Pressure (psi): 51 Computed Discharge at 20 psi Residual Pressure: QR = 2190 gpm 0 54 0.54 Discharge Formula: QR = QF X (h ' /hf ) Note: The flow test and report were prepared in accordance with NFPA 291. Report Prepared by: , (E f % °.. °•n °° k ? tk Joseph P. Schultz 1 JOSEPH P Others Present: Clenden Adams O� fry } � a• Britt Curless ' k�' Meadow Creek Sewer Co. P.O. Box 279 New Waverly, TX 77358 June 26, 2012 Alan Gibbs, P.E. : City Engineer City of College Station 1101 Texas Avenue College Station, TX 77840 Re: Meadow Creek Subdivision — Phase 4B Dear Mr. Gibbs: The sanitary sewer system for the above referenced Subdivision have been approved and accepted. Please let me know if you need any additional information. Very truly yours, Meadow Creek Sewer Co. cS rb: Y1/1g: 1 144,f51n • c,"!;, 7k4 •t F.. iC BRAZOS COUNTY ROAD AND BRIDGE DEPARTMENT R. Alan Munger, P.E., County Engineer Duane Peters, County Judge Lloyd Wassermann, Commissioner Precinct I Kenny Mallard, Commissioner Precinct 3 Sammy Catalena, Commissioner Precinct 2 Irma Cauley, Commissioner Precinct 4 June 20, 2012 Schultz Engineering LLC 2730 Longmire Drive, Suite A College Station, Texas 77845 Re: Final Plat of Meadowcreek Subdivision Phase 4B 7.540 Acres, Samuel Davidson League, A -13 College Station ETJ, Brazos County, Texas Dear Sir: On Tuesday, June 19, 2012, the Brazos County Commissioners' Court approved the referenced plat as submitted. If further information is required please contact us at (979)822 -2127. Best regards, „ ,.../4 „ IA R. Alan Munger, P.E. County Engineer Meadowcreek Ph 4B -final plat cc: Office File(s) 2617 Highway 21 West Bryan, Texas 77803 Office (979)822 -2127 / Fax (979)775 -0453 Schultz Engineering, LLC Office: 979.764.3900 Fax: 979.764.3910 June 19, 2012 Jason Schubert, AICP Principal Planner City of College Station 1101 Texas Avenue College Station, TX 77840 Re: Meadow Creek Subdivision — Phase 4B Dear Mr. Schubert: The Brazos County Commissioners Court has approved the Final Plat for the above referenced subdivision. Attached is the mylar original final plat, a CD with the digital file of the plat, the original tax certificate, a copy of an email stating Wellborn SUD has accepted the water lines and a hydrant flow test report. Please let me know if you need any additional information. If you have any questions, please do not hesitate to call. Very truly yours, Schultz Engineering, LLC. I0 Joe `t hultz, P.E. Civi r ngineer P.O. Box 11995 • College Station, Texas 77842 schultzengineeringllc.com