HomeMy WebLinkAboutCorrespondences Joe Schultz
From: Stephen Cast <wsud.sc @verizon.net>
Sent: Friday, June 08, 2012 1:41 PM
To: Joe Schultz
Subject: Re: Meadowcreek - Phase 4B
Joe Schultz,
Wellborn Special Utility District has inspected and approved the water lines in phase 4B of Meadowcreek development.
Stephen Cast
General Manager
Wellborn SUD
Original Message
From: Schultz
To: Stephen Cast
Sent: Wednesday, June 06, 2012 10:33 AM
Subject: Meadowcreek - Phase 4B
Stephen,
The contractor is complete with the construction of this phase. Attached are the hydrant flow test report and the
water sample test reports.
Please let us know if Wellborn SUD will accept the waterlines in this phase of the development.
Thanks
Joe
Joe Schultz, P.E.
Schultz Engineering, LLC
2730 Longmire, Suite A
College Station, TX 77845
Office 979.764.3900
1
SCHULTZ ENGINEERING, LLC
FIRM #4538
WATER SYSTEM FIRE HYDRANT FLOW TEST REPORT
Date: 6/6/2012
Water System Owner: Wellborn SUD
Development Project: Meadowcreek Subdivision - Phase 4B
Flow Test Location:
Nozzle size (in.): 2 1/2" Discharge Coeff: (c) = 0.90
Pitot Reading (psi): 54 Flowrate Formula: Q= 29.84cd
1230 c = discharge coeff.
Flowrate (gpm): d = orifice size (in)
P = pitot pressure (psi)
Pressure Gauge Location:
Static Pressure (psi): 62
Residual Pressure (psi): 51
Computed Discharge at 20 psi Residual Pressure: QR = 2190 gpm
0 54 0.54
Discharge Formula: QR = QF X (h ' /hf )
Note: The flow test and report were prepared in accordance with NFPA 291.
Report Prepared by: , (E f %
°.. °•n °° k ?
tk
Joseph P. Schultz 1
JOSEPH P
Others Present: Clenden Adams
O� fry } � a•
Britt Curless ' k�'
Meadow Creek Sewer Co.
P.O. Box 279
New Waverly, TX 77358
June 26, 2012
Alan Gibbs, P.E. :
City Engineer
City of College Station
1101 Texas Avenue
College Station, TX 77840
Re: Meadow Creek Subdivision — Phase 4B
Dear Mr. Gibbs:
The sanitary sewer system for the above referenced Subdivision have been approved and accepted.
Please let me know if you need any additional information.
Very truly yours,
Meadow Creek Sewer Co.
cS rb: Y1/1g: 1 144,f51n
•
c,"!;,
7k4 •t
F..
iC
BRAZOS COUNTY
ROAD AND BRIDGE DEPARTMENT
R. Alan Munger, P.E., County Engineer
Duane Peters, County Judge
Lloyd Wassermann, Commissioner Precinct I Kenny Mallard, Commissioner Precinct 3
Sammy Catalena, Commissioner Precinct 2 Irma Cauley, Commissioner Precinct 4
June 20, 2012
Schultz Engineering LLC
2730 Longmire Drive, Suite A
College Station, Texas 77845
Re: Final Plat of Meadowcreek Subdivision Phase 4B
7.540 Acres, Samuel Davidson League, A -13
College Station ETJ, Brazos County, Texas
Dear Sir:
On Tuesday, June 19, 2012, the Brazos County Commissioners' Court approved the referenced
plat as submitted.
If further information is required please contact us at (979)822 -2127.
Best regards,
„ ,.../4 „ IA
R. Alan Munger, P.E.
County Engineer
Meadowcreek Ph 4B -final plat
cc: Office File(s)
2617 Highway 21 West Bryan, Texas 77803 Office (979)822 -2127 / Fax (979)775 -0453
Schultz Engineering, LLC
Office: 979.764.3900
Fax: 979.764.3910
June 19, 2012
Jason Schubert, AICP
Principal Planner
City of College Station
1101 Texas Avenue
College Station, TX 77840
Re: Meadow Creek Subdivision — Phase 4B
Dear Mr. Schubert:
The Brazos County Commissioners Court has approved the Final Plat for the above referenced
subdivision. Attached is the mylar original final plat, a CD with the digital file of the plat, the
original tax certificate, a copy of an email stating Wellborn SUD has accepted the water lines and a
hydrant flow test report.
Please let me know if you need any additional information.
If you have any questions, please do not hesitate to call.
Very truly yours,
Schultz Engineering, LLC.
I0
Joe `t hultz, P.E.
Civi r ngineer
P.O. Box 11995 • College Station, Texas 77842
schultzengineeringllc.com