HomeMy WebLinkAboutApplication FOR OFFICE USE ONLY
CASE N O.:
DATE SUBMITTED: ' £
TIME: y r w "
CITY OF COLLEGE STATION SITE PLAN APPLICATION STAFF: ,i,'
Home of Texas Ad�M Ur�ive�srty` � g " �
GENERAL
MINIMUM SUBMITTAL REQUIREMENTS:
$932 Site Plan Application Fee.
$350 Non - Residential Architectural Standards Building Review Application Fee (if applicable).
VI $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is
0 1c/0 of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is
due prior to the issuance of any plans or development permit).
/ /Application completed in full. This application form provided by the City of College Station must be used
" and may not be adjusted or altered.
Fourteen (14) folded copies of site plan.
❑ One (1) folded copy of the landscape plan.
One (1) copy of the following for Non - Residential Architectural Standards building review or Northgate
Building Review (if applicable).
Building elevations to scale for all buildings
A list of building materials for all facade and screening.
❑ Color samples for all buildings or list colors to be used from the approved color palette.
❑ Electronic copy of Site Plan e- mailed to csuelectdesign @cstx.gov.
Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
❑ Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
❑ Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the
proposed request (if applicable).
❑ The attached Site Plan Non - Residential Architectural Standards Building Review and Northgate Building
Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not
check off. 24°`
Date of Optional Preapplication or Stormwater Management Conference
NAME OF PROJECT u& ✓I O e 0 , r
ADDRESS / 351 Rtiooist gea-Emly r 0 oug < r
LEGAL DESCRIPTION (Lot, Block, Subdivision) Lor "` HA 45
APPLICANT /PROJECT MANAGER'S INFORMATION (Primary contact for the project):
Name u rtl E -mail 5 c d tit- 641 eArel
Street Address f
City fic 0 57 State Zip Code 770 70
Phone Number ic.° 3 70 "° Fax Number f - f
PROPERTY OWNER'S INFORMATION:
Name . . E -mail 7 e. V Sri, r' ° e
Street Address 1 357 het. u
Cit 640 44. e smr4 .. State ,,' Zip Code
Phone Number 977 - - Fax Number - j
1/11 Page 1 of 11
ARCHITECT OR ENGINEER'S INFORMATION: 4r7-4/: _ P✓ ��
Name Pi "H/ 6 'a5.- AA./ Co)( 4AZCH C;er5 E -mail kCmxrr' Ccf. CG
Street Address 33 / M�k vaR7 ` sre e; SuVi .25o
City Hoc)'" State h)(.4 Zip Code 77 e ?7
Phone Number 7 q 7 ' 0 7 / Fax Number 7/ 3 - 7(17- 7 'D
OTHER CONTACTS (Please specify type of contact):
Name E -mail
Street Address
City State Zip Code
Phone Number Fax Number
Current zoning C 2.
Present use of property C4ie ri e41,6 'Sg+i/o %® v -v4E A/err 4A-/a
Proposed use of property 4 7oAi,rL
Number of parking spaces required 4:ycrs-r> . .7cie rNumber of parking spaces proposed liCl.Ji t6 eE45eVe
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? r Yes kNo
This information is necessary to help staff identify the appropriate standards to review the application and will be used to
help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made,
vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law.
Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the
application be reviewed under previous ordinance as applicable?
r Yes
IX No
If yes, provide information regarding the first approved application and any related subsequent applications (provide
additional sheets if necessary):
Project Name:
City Project Number (in known):
Date / Timeframe when submitted:
1/11 Page 2 of 11
MULTI- FAMILY RESIDENTIAL PARKLAND DEDICATION
(Fees due prior to the issuance of a Building Permit)
Total Acreage # of Multi - Family Dwelling Units
Floodplain Acreage X $1646 = $
Housing Units
# of acres in floodplain
# of 1 Bedroom Units
# of acres in detention
# of 2 Bedroom Units
# of acres in greenways
# of 3 Bedroom Units
Date dedication approved by Parks &
# of 4 Bedroom Units Recreation Advisory Board
COMMERCIAL
FOR 2 BEDROOM UNITS ONLY
Total Acreage
# Bedrooms = 132 sq. ft.
Building Square Feet
# Bedrooms < 132 sq. ft.
Floodplain Acreage
* Projects that were vested prior to January 1, 2008, per Chapter 245 of the Texas Local Government
Code may be assessed a different amount. Please contact city staff for additional information.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true
and correct.
._ 06. IS',
Signature and ti le Date
C
1/11 Page 3 of 11
(
(
' ^ ' - — ~ ^— - —� �� '` — l
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Qm/nmr•CertNicaWmn:
• t No wor ef any kind may tar1 until a permit issued.•
2, The perrnil rray be revoked if any faise stafenenls are made here,n
3, |Y revoked, all work must cease until permit is re-issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued,
S. The pennit wifl expire if no sinifican1 work is progressing within 24 rnonlhs af issuance.
8 Other stale, and Owner � local, ' requirements,
compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP.
7. If required, Elevation Certificates will be provided with elevations certified during construction (fonns at stab pre
pour) and post construction,
8, Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance,
9, 11, stormwater mitigation is required. incluthng deteniron ponds proposed as pari of this proJecl, it shall be
designed constructed |n|heconstmo\kmmoquenceoY�h�pn�ed.
�
, 10, lnao�em�whhCh��r Code m���O� � in�n�oythe City of �� shall taken
�to insure that all debris from construction, erosion, and sedimentation shall not bwdeposited in city streets, er
existing drainage facilities, All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project, AM of the applicable codes and ordinances of Ihe
City of Goflege Station shaft apply.
11, The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. Alt devetopment ha boen desgned in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
12. Release oN plans ho _ UR84 � w' eew (name n, firm) is authorized for bidding purposes
only. 1 understand thal final approval and release el pians arid devatopment for cons1rucion is contingent on
contractor signature Permit
'
13, I, THE OVVNER,AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURAJE.
`~
Property Ow (m) Date
(,
Engineer Certification:
1, The project has been designed to ensure that stormwater mitigation including detention ponds, proposed as part
of the project will be constructed first in the construction sequence,
2 I will obtain or can show compliance with all necessary Local, State and Federal Permits prior ."=m.=°°^.".
including NOI and SVVPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may
require a sedimentation basin,
3 �e�������om��in�����n��p�������w��
' currant requirernents 01 the City 01 College Station, Texas Crty Code, Chnpter 13 and associated BCS Unified
Design Guide)ines. Alt developmant has been deslgned In accardance with alt appflcable codes arid ordinances
of the CIty af Collego Station and State and Federal Regulahons
4, | THE ENGINEER, AGREE TO AND CERTIFY THAT ALL GT4TExxENTG HEREIN, AND \w/gTACHK0ENT3
'{)FtTH�D�VEL�PkDENTPER�|TAPPL|C�TKJ�.A�E'TOTHE�ESTOFK
FOR
ACCURATE.
Engineer Dote
ppo*
1/11
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification: .
•
1. No work of.any kind may start until a permit is issued.
2. The permit may be revoked if any false statements are made herein. •
3. If revoked, all work must cease until permit is re- issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOl and SWPPP.
7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post construction.
8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
.compliance.
9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply.
11. The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations,
12. Release of plans to URB4A- e'r +Si rer. crbe Xtx . (name or firm) is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE.
Property Owner(s) Date
Engineer Certification:
•
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence,
2. I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may
require a sedimentation basin.
3. The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations.
4. 1, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS
.FOR THE D VELo PMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
AC�l1
kksky
Engineer Date
1/11 Page 4 of 11