HomeMy WebLinkAbout96-2919 11P1 111111111111 : 1
> IN, 41/ .-
CITY OF COLLEGE STATION
1101 TE:AAS AVENUE '3. •
778
COLLEGE STATION, TY •
C
CERT IvicAle Y
OWNER'S NAME: C
COMANC9E CONTRACTORS, IN.
ADDRESS: S.9. 6 EAST, 1001 PERM
IT 0:9602919
. PROJECT: DOUGLASS NISSAN
LO T: O
I BUOCK:1 SUBDIVISION:GREENSWORUD PHASE II
I HAVE S)(AMINED T9E OFFICIAL TONING MAP OF 19E CITY OF COLLEGE STATI..
AND DO 9ERE17.3\1 CERTIr( T9AT T9E. ABOVE DESCRIBED LAND MAY BE OCCUPIED
ACCORDANCE WIT9 T9E. REGULATIONS FOR ZONING DISTRICT _ AS PE:
ORDINANCE NO. 163S SUBJECT OWS
TO T9C FOLLOWING VARIANCES, EY,CF;TINS or
SPECIAL. REQUIREMENTS AS FOLL: _________------ _ ____
- , .--,-,---/-. -raj'
_-_,-------------
- DAiil 4(70N:tG OFJCI(._)
I 9EREBY CERTIFY TOAT TOIS BUILDING 9AS VEEN INSP
-C-
-__,____________ECTED AND T9AT
CAN BE USED AS GROUP 8 - BUSINESS GROUP ___
, . OCCUPANC-NI
'CLASSIFICATION AS DEFINED BY N9E STANDARD BUILDING CODE SUBJECT 'W
T9E FOLLOWING SPECIFIC REQUIREMENTS: _____ _
_"2_/ -91
. . ("- 41--------'/-
DATE.:. • ' (BUILDIW FFICIA-)
• ,
1 111
CITY OF COLLEGE STATION
11 TEXAS AVENUE S.
COLLEGE STATION, TX 77840
T E M P O R A R Y
C E. F' T 7: F" :r C. A T F:_ (::i I CI ► : C HP fi N C; Y
OWNER' S NAME: COMANC:HE CONTRACTORS, INC:.
ADDRESS: S.H. 6 EAST, 1001. PERMIT #:960291.9
PROJECT: DOUGLASS NISSAN
L...OT : 1 BL._OC:K: 1. SL.JBD I V I S I ON : GREENSWORLD PHASE T T
: C HAVE EXAMINED THE: OFFICIAL ZONING MAP OF THE CITY OF COLLEGE STATION
AND DO HEREBY CERTIFY THAT THE ABOVE DESCRIBED LAND MAX BE OCCUPIED I N
ACCORDANCE W I TI•I THE REGULATIONS FOR ZONING D I S T R I C T _G '' ..__ AS PER OPD I NANCE: NO. 163E1 SUJB,Jf. C T TO THE FOLLOWING VARIANCES, E: xis EPT I ONE.? OR
SPEC: I AL... REC::►U I RF`MENT'S AS FOLLOWS:
/ / ci
DATE I JONINIJ OFF tC:IAL.7
7. HEREBY CE:F ='T I FY THAT T H I S BUILDING HA::; BEEN I NSF'E ►:':TED AND THAT T T
CAN BE USED AS ►3F'OUP B BUSINESS , GROLJF' B OCCUPANCY
C L A S S I F I C A T I O N AS DEFINED BY THE STANDARD BUDDING CODE SUBJECT TO
rHE FOLLOWING S P E C I F I C REQU I DEMENT y : . _Comp- Lute_ eq.ulpment_- re4•eeetton €-ram• -Bryan
DATE (BUILDING. O F F I C I A L )
Conditions: (1)Irrigation needs to be installed within 4 months.
(2)Landscaping must be completed within 4 months.
(3)Ramps on both front corners must be completed with parking finished in areas adjacent to
ramps. (4)Islands on front of building must either be landscaped or paved with decorative
pavers. No parking is allowed in these islands. (5)Any disturbed dire either on this
property, adjacent property or right-of -way must be seeded or sodded. (6)Drainage structure
must be completed and approved by May 16, 19970)The pipe fence must be painted a
bronze color by May 16, 1997.(8)The entrance drive from the frontage road must have
curbing installed on both sides according to the approved permit issued by both
TxDOT and the City of College Station. This work must all be completed by
May 16, 1997 with exception of the landscaping which must be completed within
4 months from the date of this Certificate of Occupancy.
#17:E. 1..A5T rq, euVA .61 MOT 3 DEF►►v t ort -1 c(
Fire Marshall Requirements: (1) Alarm system has not been tested for compliance with NFPA 72.
(2) Fuel tank has not been installed or approved. (3) Fire lanes need to be completed.
(3) Missing three fire extinguishers. (4) Curbing for used oil impoundment not complete.