HomeMy WebLinkAbout98-1877 (2) ~--- — 111 lir ' I_--11,—wr—
�
� _� ���� .
~ ���� ' �
�� -�~
- .,
»
| `
� - _ ~ -
CITY OF COLLEGE STATION ~
1101 TEXAS AVENUES.
COLLEGE STATION, TX 77840
TEMPORARY&CONDITIONAL
CERTIFICATE OF OCCUPANCY
OWNER'S NAME: THE HAMM CORPORATION
ADDRESS: UNIVERSITY DRIVE EAST, 1300 BLDG B PERMIT #:9801877
PROJECT: TOWNE PLACE SUITES BY MARRIOTT
LOT:1 BLOCK:1 SUBDIVISION:WHEELER S.D.
I HAVE EXAMINED THE OFFICIAL ZONING MAP OF THE CITY OF COLLEGE STATION
AND DO HEREBY CERTIFY THAT THE ABOVE DESCRIBED LAND MAY BE OCCUPIED IN
ACCORDANCE WITH THE REGULATIONS FOR ZONING DISTRICT _ C~Q AS PER
ORDINANCE NO. 1638 SUBJECT TO THE FOLLOWING VARIANCE ~~
S , XCE_ PTIONS OR
/ SPEr 1 AL PEOU I R EMEN AS FOLLOWS
.142__La.)1K- ,
DATE ' ' (ZONING OFrICIAL)NatalWIWiz, Dev Coordinator
I HEREBY CERTIFY THAT THIS BUILDING HAS BEEN INSPECTED AND THAT IT
^
CAN BE USED AS GROUP P1 - RESIDENTIAL, GROUP P1 - OCCUPANCY .^ *
CLASSIFICATION AS DEFINED BY THE STANDARD BUILDING CoDE SUBJECT TO
THE FOLLOWING SPECIFIC REQUIREMENTS:
'
/ ' _ —la - ��u� - � �- '' .4f. 1 Z i - (4_,-
DATE fBUILDING OFFIC JAL ) Lance Sinms, 8ui ldYngOeFfYc|a) '
. �
. .
i
� `
' ~
■
° ,`
^ ^
' . |^ .�
..
PAGE 1 OF 2 |
______ _ , ^~___ _______________________ ___ ____________ |
1 •
MARRIOTT TOWNE PLACE SUITES
Temporary & Conditional Certificate of Occupancy
1300 University Drive East Henry Ferguson, Local Superintendent
Buildings A & B Hale -Mills Construction, Inc.
Case #98 -404 Page 2 of 2
Temporary & Conditional C.O. Conditions
The following is a list of items that must be completed on or before Thursday, July 15, 1999:
Provide as -built construction plans for the off -site sanitary sewer line to be reviewed
and approved by staff.
Provide as -built construction plans for the water line changes that were made on site
during construction to be reviewed and approved by staff.
Grass must be established in the off -site areas that were disturbed during
construction. (This includes the northwest, northeast and southwest corners of the
University Drive and Lincoln Avenue intersection.)
Locate the valves that were covered during the landscaping of the site.
L
1
/Or'
Natalie ' ui Developmen Crrdinator Lance Simms, Building Officia
� P g
June 30, 1999 9 June 30, 1999