Loading...
HomeMy WebLinkAboutStaff CommentsSTAFF REVIEW COMMENTS NO.2 Project: EDELWEISS GARTENS PH 6-11 (PP) - 04-00500120 ENGINEERING 1. Plat needs to show street connection to State Highway 40 paved roadway. Reviewed by: Spencer Thompson Date: June 8, 2004 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM May 21, 2004 TO: Edelweisse Gartens Venture, Via fax 846.0652 FROM: Jennifer Reeves, Project Manager SUBJECT: EDELWEISS GARTENS PH 6-11 (PP) - Preliminary Plat Staff reviewed the above-mentioned preliminary plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, June 7, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for June 17, 2004, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) copies of the revised preliminary plat; $200 public hearing fee for replat notifications; One (1) Mylar original of the revised preliminary plat. One (1) copy of the digital file of the preliminary plat on diskette or e-mail to nmanhart@cstx.gov Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Spencer Thompson or myself at 979.764.3570. Attachments: Staff review comments cc: McClure & Browne Engineering/Surveying, Inc., Via fax 693.2554 Case file #04-00500120 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: EDELWEISS GARTENS PH 6-11 (PP) - 04-00500120 ENGINEERING/PLANNING 1. Please remove "Master" off plat. Per LIDO there is no longer a Master Preliminary Plat. Please download a new Preliminary Plat application off of our website. 2. Zoning boundaries are not clear. Please denote each zoning boundary within each phase. 3. Portions of this property that were a part of the Bald Prairie Subdivision are required to be a replat and a public hearing. 4. Please show all side-street setbacks. The building area on some of the proposed side-street lots is of concern. 5. The intersection at Mountain Breeze Way and Victoria Avenue should be designed with the proper radius to meet fire requirements. This is typically 25-feet. The HOA landscape easement can be applied outside of ROW. 6. No zero lot line construction is shown on plat and none is being considered for Phases 6-11. 7. Sewer is to be extended up Renee Lane to extent of development. 8. Utilities shown are not approved at this time. Water and sewer reports are required to confirm line sizes and capacities. In addition, see BCS Unified Design criteria as it relates to 6-inch lines ending in an 8-inch line or fire hydrant, maximum length of lines and number of hydrants on a 6-inch line. What is shown on plat conflicts with requirements. 9. Since R-1 lots are allowed in R-2 and R-3, please state on plat where you are platting R-1 lots in zones other than R-1, in compliance with R-1 standards. Please note on plat which lots are being platting to which standard; R-1, R-2 & R-3. 10. Lots less than 70-feet in width in the R-2 zone to be developed with duplexes are required to provide side or rear parking. Note on plat. 11. Mountain Breeze Way and Santour Drive are required to connect to SH 40. The Developer will be required to make tie-in to SH 40 at the time 40 is accessible. 12. Rename Robelmont Lane to Night Rain Drive for continuity. 13. Devrne Loop will need a new suffix as it does not meet the definition of a loop. 14. Passendale Loop will need a new suffix as it does not meet the definition of a loop. 15. Submit 2 new names for approval for the 2 cul-de-sacs off of Tenneville Court. 16. If Tenneville Court will not be a cul-de-sac, the suffix will need to be renamed. 17. Show extension of 10-inch sewer line and 12-inch water line at northeast property corner crossing 40. 18. Public drainage ROW is required to be improved and designed per DPDS. 19. On Santour Drive, plat shows 60-ft ROW and 36-ft ROW. 20. Additional easements may be required due to proximity of utilities to edge of ROW. Reviewed by: Spencer Thompson/Jennifer Reeves Date: 05-20-04 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2of3 ELECTRICAL 1. Developer installs conduit as per city specs and design. 2. Developer provides 30' of #4 rigid conduit for riser pole(s). Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design. (pull boxes provided by the city). 5. Developer provides digital AutoCAD 2002 version of plat and/or site plan. Email to rbolin@cstx.gov. 6. Developer provides load data for project. 7. Developer installs street lighting per city specs and design. 8. Developer provides temporary blanket easement for construction purposes. 9. Developer provides easements for electric infrastructure as installed for electric lines (including street lighting). Reviewed by: Ronnie Bolin Date: 05-20-04 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 3of3 STAFF REVIEW COMMENTS NO. 2 Project: EDELWEISS GARTENS PH 6-11 (PP) - 04-00500120 ENGINEERING 1. Plat needs to show street connection to State Highway 40 paved roadway. Reviewed by: Spencer Thompson Date: June 8, 2004