Loading...
HomeMy WebLinkAboutWater ReportWATER REPORT FOR OUR SAVIOUR'S LUTHERAN CHURCH MAY 2004 SUBMITTED BY: S I;e 11L2 yv McCLURE & BROWNE ENGINEERING /SURVEYING, INC. 1008 Woodcxeek Drive, Suite 103 • College Station, Texas 77845 WATER REPORT for OUR SAVIOR'S LUTHERAN CHURCH GENERAL INFORMATION The proposed location for Our Savior's Lutheran Church is a 7.628 acre tract on the northeast corner of Woodcreek Drive and the Earl Rudder Freeway frontage road. The project calls for the construction of a sanctuary, a fellowship hall and two parking lots. The site is bound by Woodcreek Drive to the south, the Woodcreek Subdivision to the east, property owned by the East By -pass Development Group to the north and the Earl Rudder Freeway frontage road to the west. WATER SYSTEM ANALYSIS The public water system that will serve this site is a 12" water line that exists along Woodcreek Drive that serves the Woodcreek and Foxfire Subdivisions to the east. It connects to an 18" line at the frontage road of the Earl Rudder Freeway. The water system for the church project is a single 8" line that connects to the existing 12" line on Woodcreek Drive and runs approximately 320 feet into the site. A schematic diagram of the system is shown in Exhibit A. A single fire hydrant is provided on this line that provides coverage to the new facility. The City of College Station requires that a fire demand of 2500 gpm be used for analysis of the water system to demonstrate that it can provide adequate flows during a fire. This flow rate can be split between two adjacent fire hydrants. Since only one hydrant is proposed on the site, an existing hydrant on Woodcreek Drive was included in the computer model of the system Domestic water use rates were provided by the building architect. The estimated peak use, which includes future buildings anticipated at the site, is 150 gpm Computer modeling of the water system was conducted using the Kentucky Pipe Network Analysis (KYPIPES). The City of College Station provided pressure test data from a hydrant located on Amberwood Court, which was used to determine the elevation of the pressure plane in the area. A copy of that report is shown in Exhibit B. A residual pressure of 87 psi was found at the hydrant. Since that is the lowest pressure that is likely to be realized in the existing system, it was used as the beginning pressure for the computer model. The output data of the computer model is shown in Exhibit C. It shows that the lowest pressure in the system is 84 psi at Node 3. This pressure is well above the minimum pressure of 20 psi allowed by the Texas Commission on Environmental Quality (TCEQ) for fire flow conditions, and it exceeds the minimum pressure of 30 psi required for static conditions. Conclusion Under the fire flow scenario described above, the water system provides pressures that greatly exceed the minimum pressures. This demonstrates that the proposed water system for Our Savior's Lutheran Church is of adequate size to meet static and fire demands of the proposed buildings. 2 WIL I r3 i` i Scale: 1" = 60' 0 ;f ;r/ :7 �, Vol ?fop IZZZ�' Cornerstone Commercial Section I Vol 705, Pg 823 Akbib A Our Saviour's Lutheran Church Water Line Schematic 0325 - EXH8-A D WG Lot 1, Block 1 7.628 A cres 000 0".; L Lot 2 _ ` y �� ,� `- V/ /age Hotel Partners, L P. Vol 3479, Pg. 31 0 Proposed Water Line cb. A�-. 4 LEGEND ........... . . .... i (D Node Number Fixed Grade Node FPN 1 Lot 1 Michael t Mildred McClure Vol 3278, Pg. 77 Woodcreek Subdivision Section 4 Vol I315, Pg. 217 ! � � j Lot 1, Block 14 I Lot 9, Block 14 v l� Prop. Stormwater Detention Area /y Z Ci S Z 4D - m' 2 4 LEGEND ........... . . .... i (D Node Number Fixed Grade Node FPN 1 Lot 1 Michael t Mildred McClure Vol 3278, Pg. 77 Woodcreek Subdivision Section 4 Vol I315, Pg. 217 ! � � j Lot 1, Block 14 I Lot 9, Block 14 v l� Water ft Ule PowerhProgress Service isPride Exhibit B Our Savior's Lutheran Church Pressure Test Data 1601 G RAHAM ROAD COLLEGE STATION TEXAS 77845 Date: 18 MAY 04 Number pages including cover sheet - 1 Fax to: 693 2554 Attention: GALA Company: MCCLURE ENGINEERING From: Butch Willis Water Wastewater Division Phone: 979 - 764 -3435 Fax: 979- 764 -3452 FLOW TEST REPORT Nozzel size: 2.5 inch Location: WOODCREEK DR. Flow hydrant number: P -001 Pitot reading: 80 (GPM): 1500 i Static hydrant number: P -024 Static PSI: 93 Residual PSI: 87 Conversion to Hydraulic Grade Line 87 psi x 2.31psi/ft = 201 ft. Elevation = 304 ft. HGL = 201 +304 = 505 ft. Exhibit C Our Savior's Lutheran Church KYPIPE Water System Analysis * * * * * * * * * * * * * * K Y P I P E * * * * * * * * * * * * * * * University of Kentucky Hydraulic Analysis Program * for the Distribution of Pressure and Flows in Pipe Network Systems * FORTRAN VERSION - 3.40 (01/02/91) * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * DATE: 5/20/2004 TIME: 10:54:14 INPUT DATA FILENAME -------- - - - - -- oursay.dat TABULATED OUTPUT FILENAME -- - - - - -- oursay.out ***************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** S U M M A R Y O F O R I G I N A L D A T A ***************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** U N I T S S P E C I F I E D FLOWRATE IS EXPRESSED IN GPM AND PRESSURE IN PSIG P I P E L I N E A N D P U M P D A T A PIPE NO. NODE NOS. LENGTH DIAMETER ROUGHNESS MINOR LOSS K FIXED GRADE (FEET) (INCHES) 1 0 1 100.0 12.0 150.0 1.20 505.00 2 1 2 50.0 12.0 150.0 .80 3 2 3 70.0 8.0 150.0 2.30 4 3 4 40.0 8.0 150.0 1.60 5 4 5 210.0 8.0 150.0 .80 6 0 2 570.0 12.0 150.0 .00 505.00 A SUCCESSFUL GEOMETRIC VERIFICATION HAS BEEN COMPLETED J U N C T I O N N 0 D E D A T A JUNCTION NUMBER DEMAND ELEVATION CONNECTING PIPES 1 1250.00 306.00 1 2 2 .00 307.00 2 3 6 3 1250.00 306.00 3 4 4 150.00 305.00 4 5 5 .00 298.00 5 O U T P U T O P T I O N D A T A OUTPUT SELECTION: ALL RESULTS ARE OUTPUT EACH PERIOD S Y S T E M C O N F I G U R A T I O N THIS SYSTEM HAS 6 PIPES WITH 5 JUNCTIONS 0 LOOPS AND 2 FGNS 1 Exhibit C Our Savior's Lutheran Church KYPIPE Water System Analysis ****** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** S I M U L A T I O N R E S U L T S ****** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** THE RESULTS ARE OBTAINED AFTER 2 TRIALS WITH AN ACCURACY = . 00068 S I M U L A T I O N D E S C R I P T I O N (L A B E L) Our Savior's Lutheran Church Domestic Demand =3 GPM Fire Flow = 2 @ 1250 GPM (NODES 1 & 3) McClure & Browne Engineering /Surveying Inc. May 19, 2004 P I P E L I N E R E S U L T S PIPE NO. NODE NOS. FLOWRATE HEAD LOSS PUMP HEAD MINOR LOSS VELOCITY HL /1000 1 0 1 1704.03 .52 .00 .44 4.83 5.22 2 1 2 454.03 .02 .00 .02 1.29 .45 3 2 3 1400.00 1.83 .00 2.85 8.94 26.14 4 3 4 150.00 .02 .00 .02 .96 .42 5 4 5 .00 .00 .00 .00 .00 .00 6 0 2 945.97 1.00 .00 .00 2.68 1.76 J U N C T I O N N O D E R E S U L T S JUNCTION NUMBER DEMAND GRADE LINE 1 1250.00 504.04 2 .00 504.00 3 1250.00 499.32 4 150.00 499.28 5 .00 499.28 ELEVATION PRESSURE 306.00 85.82 307.00 85.37 306.00 83.77 ** Lowest Pressure 305.00 84.19 298.00 87.22 S U M M A R Y O F I N F L O W S A N D O U T F L O W S ( +) INFLOWS INTO THE SYSTEM FROM FIXED GRADE NODES ( -) OUTFLOWS FROM THE SYSTEM INTO FIXED GRADE NODES PIPE NUMBER FLOWRATE 1 1704.03 6 945.97 NET SYSTEM INFLOW = 2650.00 NET SYSTEM OUTFLOW = .00 NET SYSTEM DEMAND = 2650.00 D A T A C H A N G E S F O R N E X T S I M U L A T I O N D E M A N D C H A N G E S DEMANDS ARE CHANGED FROM ORIGINAL VALUES BY A FACTOR = 1.00 2