HomeMy WebLinkAboutStaff Review Comments Staff Review Comments — No. 1
Candlebrook PP — 04- 00500102
ENGINEERING
1. Show all required easements.
Review by: Spencer Thompson Date: May 3, 2004
BRAZOS COUNTY
1. Show all required easements.
2. Plat is not in compliance with County Subdivision Regulations. In order to comply
with the 1000 -ft limitation this plat must create a street "stub -out" approximately at
the midpoint of Golden Trail.
3. Construction documents must be turned -in to the County for full evaluation. It
appears a culvert/ drainage easement will be required for the culvert structure under
the roadway along the creek. These easements are typically 25'x50' on either side
of the road.
4. Add note to plat: 20' PUE along ROW to be cleared of all brush and small trees.
Reviewed by: Ray Crow Date: May 3, 2004
BTU
1. No comments.
Reviewed by: BTU Date: May 3, 2004
Home of Texas A &M University