Loading...
HomeMy WebLinkAboutStaff Review Comments STAFF REVIEW COMMENTS NO. 1 Project: PEBBLE CREEK PH 9B (MP) - 04- 00500101 ENGINEERING 1. Please state whether Todd Carnes is the sole owner of both properties. Otherwise, another owner needs to be listed on the application as two owners are shown as signatories on the plat. 2. Amending plats do not get approved by P &Z. The other certification should be for the City Planner. Reviewed by: Spencer Thompson Date: April 26, 2004 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city. 5. Developer provides digital AutoCAD 2002 version of plat and /or site plan. email to rbolin @cstx.gov 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). Reviewed by: Ronnie Bolin Date: 4 -29 -04 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 2 L