Loading...
HomeMy WebLinkAboutApplication G 0 FOR OFFICE �EONLY CASE NO. 0� DATE SUBMITTED _3 1�¢ COLLEGE STATION Major Wireless Telecommunications Facilities CONDITIONAL USE PERMIT / SITE PLAN REVIEW APPLICATION Minimum Requirements $300.00 application, processing, and notification fee / $200.00 Site Plan Review Fee (includes 3 staff reviews). h u, $200.00 Development Permit Application Fee if applicable. Via $600.00 Public Infrastructure Inspection Fee if applicable. (This fee is payable if construction of a public waterline, sewerline, sidewalk, street or drainage facilities is involved.) V Eleven (11) copies of site plan that meet requirements for WTF's as described in Section 6.3.Q of the Unified Development Ordinance and includes requirements for site plan proposals as listed on the attached sheet. This site plan will go to City Staff for review, after which Eleven (11) copies of the revised site plan will be required. Detailed explanation of proposed use including the location, type, and height of the proposed facility, anticipated traffic, number of employees, etc. Additional requirements listed on following page. Date of Required Preapplication Conference: Height of Transmission Tower: g NAME OF PROJECT if I ' A C - A • /LA - •i ,/ ADDRESS 6 103 Y1 re�e 4 7 Road �1 LEGAL DESCRIPTION 3, i7S (A Crfs In v1 +LP, 1 orPNA. Rector Curve /T.h / c t.c- Y b ,Plgtfi ylluitj SubM►ff¢cI APPLICANT (Primary Contact for the Project): Name ► t l J(v. Cra/� • Street Address 37 703 P lylWet Lot vlQ, City State %,\/ Zip Code 7739 E -Mail Address irr'ci /M . 65fJJ( - 7r2 cow! Phone Number Fj 3R MOO Fax Number oZS 516 7\15 PROPERTY OWNER'S INFORMATION: / / Name Ar t �Gf r aj Ala rt c W rl t Fai/vi / 1.444' il94 Par tv(411Q Street Address 106 HQ S i t r City p ' � $ f a t l n & State Zip Code 7 3 '10 E -Mail Addres Phone Number 6 R - 9 85553.70 /M) Fax Number q ►__ i __ 93 !`iy5 o) 3 jui 6/13/03 f r I of 3 ARCHITECT OR ENGINEER'S INFORMATION: Name V►�'I tlorrai4 (VT CokrvhunIK9G VLSI 6racp, Lcc) Street Address U 300/ L ?J Frr jt/a / Sl fP. 13 q City vp11 G� S tate � Zip Code n - 75P3 1 1 t � E -Mail Address Wit. Mira t e I�✓f - r d� . com Phone Number q 73 R 0 7-61 V Fax Number 0 17 - 3_ 7 076 oZ OTHER CONTACTS (Please specify type of contact, i.e. project manager, potential buyer, local contact, etc.) Name Street Address City State Zip Code E -Mail Address Phone Number Fax Number PRESENT USE OF PROPERTY S - Famil ficrea r (Inu/domi Profert CURRENT ZONING OF PROPERTY E /, 41 /� t I! 4 I verify that all of the information contained in this application is true and correct. IF APPLICATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE PROPERTY, APPLICATION MUST BE ACCOMPANIED BY A POWER OF ATTORNEY STATEMENT FROM THE OWNER. �,. a 1 C 1/300 ` 1 Signature of Owner, Agent or Applicant Date 6/13/03 2 of 3 Applications for MAJOR WTFs must include: Vv An inventory of the applicant's existing and future towers that area wither within the City, the City's ETJ, or within at least 1 mile of the City's boundary where the ETJ does not extend that far, as outlined in 6.3.Q.8.b Application Procedures. The owner must have on file with the City a master list of all existing / tower structures owned or controlled by the owner. //The linear separation distance from other transmission towers within a one -mile radius of the proposed tower site. The linear separation distance form all residentially -zoned properties, residential structures and applicable thoroughfares as outlined in Section 6.3.Q.4.b, Proximity to Major Thoroughfares, within 500 feet of the proposed tower. / ✓A visual impact analysis, presented either as color photo simulations, showing the proposed site of the WTF, as outlined in Section 6.3.Q.8.e Application Procedures. /Affidavit confirming compliance with FAA regulations, FCC regulations and regulations of any other agency of the Federal Government with the authority to regulate telecommunication facilities. //Grid Plan (propagation map) of the service area for existing and future structures for a period of not less than 5 years. The submission should include a map showing the "search ring" that was required for siting the proposed facility. ►/V A letter addressed to the City declaring an intent and willingness to construct a proposed tower that would allow additional service providers to locate on the tower. / of need and alternatives according to Section 6.3.Q.10 Documentation of Need and Alternatives. 6/13/03 3 of 3