Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Application (12-103)
F0 S ONLY CASE NO.: f „e DATE SUBMITTED: f TIME: CITY OF COLLEGE STATION Home of Teras AoM University° STAFF: FINAL I I (Check one) ❑ Minor n Amending ) © Final n Vacating ❑ Replat ($700) ($700) ($932) ($932) ($932) Is this plat in the ETJ? ❑ Yes © No Is this plat Commercial n or Residential MINIMUM SUBMITTAL REQUIREMENTS: $700 -$932 Final Plat Application Fee (see above). $233 Waiver Request to Subdivision Regulations Fee (if applicable). MI $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 1% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). © Application completed in full. This application form provided by the City of College Station must be used and may not be adjusted or altered. Please attach pages if additional information is provided. p Fourteen (14) folded copies of plat. (A signed mylar original must be submitted after approval.) © Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. © Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). El Copy of original deed restrictions /covenants for replats (if applicable). lot MI Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate current within ninety (90) days. The report must include applicable information such as ownership, liens, encumbrances, etc. © Paid tax certificates from City of College Station, Brazos County and College Station I.S.D. © The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not. NOTE: A mylar of the approved preliminary plan must be on file before a final plat application will be considered complete. If the mylar is submitted with the final plat application, it shall be considered a submittal for the preliminary plan project and processed and reviewed as such. Until the mylar has been confirmed by staff to be correct, the final plat application will be considered incomplete. Date of Optional Preapplication or Stormwater Management Conference NAME OF PROJECT Harper's Crossing ADDRESS William D. Fitch Parkway (State Highway No. 40) SPECIFIED LOCATION OF PROPOSED PLAT: 3.19 acres at the east corner of State Highway No. 40 /Barron Road Intersection APPLICANT /PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name CapRock Texas c/o Jesse Durden, President E -mail Iesse.durden @caprocktx.com Street Address 11Q Lincoln Avenue, Ste. 103 City College Station State TX Zip Code 77840 Phone Number 979-307 -0321 Fax Number 979-314 -7606 1/11 Page 1 of 9 PROPERTY OWNER'S INFORMATION (All owners must be identified. Please attach an additional sheet for multiple owners): Name Dunlap Family Trust - Jill Mary Dunlap, Trustee E -mail Street Address 3104 Broadmoor Drive City Bryan State TX Zip Code 77802 Phone Number 979- 774 -3550 Fax Number ARCHITECT OR ENGINEER'S INFORMATION: Name Schultz Engineering, LLC, attn: Joe Schultz E -mail joeschultz84 @verizon.net Street Address P.O. Box 11995 City College Station State TX Zip Code 77842 Phone Number 979- 764 -3900 Fax Number 9797643910 Do any deed restrictions or covenants exist for this property? ❑ Yes © No Is there a temporary blanket easement on this property? If so, please provide the Volume and Page No. Total Acreage 3.19 Total No. of Lots 2 R -O -W Acreage 0 Existing Use Vacant Proposed Use Commercial Number of Lots By Zoning District 2 / PDD / / Average Acreage Of Each Residential Lot By Zoning District: n/a Floodplain Acreage None Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? E Yes rX No This information is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made, vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law. Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the application be reviewed under previous ordinance as applicable? I`X Yes ( No If yes, provide information regarding the first approved application and any related subsequent applications (provide additional sheets if necessary): Project Name: Harper's Crossing Preliminary Plan City Project Number (if known): #12- 00500059 Date / Timeframe when submitted: March 2012 1/11 Page 2 of 9 A statement addressing any differences between the Final Plat and Preliminary Plan (if applicable): None. Requested waiver to subdivision regulations and reason for same (if applicable): None. Regarding the waiver request, explain how: 1. There are special circumstances or conditions affecting the land involved such that strict application of the subdivision regulations will deprive the applicant of the reasonable use of his land. 2. The waiver is necessary for the preservation and enjoyment of a substantial property right of the applicant. 3. The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other property in the area, or to the City in administering subdivision regulations. 4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in accordance with the provisions of the Unified Development Ordinance. Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable): 1. r An alternative pedestrian way or multi -use path has been or will be provided outside the right -of -way; 2. [ The presence of unique or unusual topographic, vegetative, or other natural conditions exist so that strict adherence to the sidewalk requirements of the UDO is not physically feasible or is not in keeping with the purposes and goals of the UDO or the City's comprehensive Plan; 3. 1 A capital improvement project is imminent that will include construction of the required sidewalk. Imminent shall mean the project is funded or projected to commence within twelve (12) months; 4. r Existing streets constructed to rural section that are not identified on the Thoroughfare Plan with an estate / rural context; 5. r When a sidewalk is required along a street where a multi -use path is shown on the Bicycle, Pedestrian, and Greenways Master Plan; 1/11 Page 3 of 9 6. f The proposed development is within an older residential subdivision meeting the criteria in Platting and Replatting within Older Residential Subdivisions Section of the UDO; or 7. f The proposed development contains frontage on a Freeway / Expressway as designated by Map 6.6, Thoroughfare Plan - Functional Classification, in the City's Comprehensive Plan. Detailed explanation of condition identified above: NOTE: A waiver to the sidewalk requirements and fee in lieu of sidewalk construction shall not be considered at the same time by the Planning & Zoning Commission. Requested Oversize Participation Total Linear Footage of Parkland Dedication due prior to filing the Final Plat: Proposed Public: ACREAGE: Streets No. of acres to be dedicated + $ development fee Sidewalks No. of acres in floodplain 67 Sanitary Sewer Lines No. of acres in detention 5(2 Water Lines No. of acres in greenways Channels OR Storm Sewers FEE IN LIEU OF LAND: 3e Bike Lanes / Paths No. of SF Dwelling Units X $ = $ (date) Approved by Parks & Recreation Advisory Board NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true, correct, and complete. IF THIS APPLICATION IS FILED BY ANYONE OTHER THAN THE OWNER OF THE PROPERTY, this application must be accompanied by a power of attorney statement from the owner. If there is more than one owner, all owners must sign the application or the power of attomey. If the owner is a company, the application must be accompanied by proof of authority for the company's representative to sign the application on its behalf. LIEN HOLDERS identified in the title report are also considered owners and the appropriate signatures must be provided as described above. �) ( 0 ^ 1, ignpture and tie Date 1/11 Page 4 of 9 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re- issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP. 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre - pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11. The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release of plans to (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. r Property wnef(s)� ✓c �� Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may require a sedimentation basin. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. Engineer Date 1/11 Page 5 of 9 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re- issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP. 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre - pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11. The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release of plans to (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. Property Owner(s) Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may require a sedimentation basin. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of Colleze,l/WttrqState and Federal Regulations. 4. I, THE ENGINE, ,p a ofbi CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEL- F�,TP�91\PPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND AC RATE , r� � n, Engineer/ tr a, J d { g ,,� � r r .;' �' Date Si %. 1/1 Page 5 of 9 PLANNING & ENGINEERING PROJECTS � COMPLETENESS WORKFLOW J [ d edger (MA) E� Neighborhood Park Zone No. ILA (JPaz) C reate and Attach Address (MA) n 1 IA's (JG) .- - ■ [New Development List (CC) L4' ompleteness Review 9RlP. d &B Closure (MT) Memo to Applicant (CC) RI' SAM / Aerial (JPaz) ❑ reenways (VG) [ [l mpact Fee Area - 01 (JPaz) [ Scan Application / Bin Assignment (MA) Community Park Zone No. t1' (JPaz) IVImpact Fee Note in Naviline (MA) PROJECT MANAGER PLATS: if an ETJ minor plat, BCaldwell and BGeorge e- mailed when approved. Yes N/A A TREES: Final Plats (SF or Townhome): Are trees required for this plat? Yes No SIDEWALKS: Plans / Plats (Sidewalk Fund): Are sidewalk fees required? Yes N Sidewalk Zone no.: $5/ sq. ft. X sq. ft. _ $ Total Amt. Due PARKLAND DEDICATION: Neighborhood Park: Zone Fee per Lot $ _ Total $ Acquisition Costs Fee: No. of Lots /Units: Single- family Multi- family Development Costs Fee: $ No. of Lots /Units: Single- family Multi- family Community Park: Zone > per Lot $ Total $ Acquisition Costs Fee: No. of Lots/ 'ts: Single - family Multi- family Development Costs F e'$ No. of Lots /Units: Si e- family Multi- family Total Parkland es Due: $ Fees in Naviline (Initial): IMPACT FE (assessed at Plat, due at BP — see Impact Fee Chart): Fee: $ PROJECT STATUS (Please provide action taken and date) Action Date Staff: CC: P &Z: ZBA: DRB: LC: Notes: •� IIN, ..... ctC• pi' e (I.' • •4 �� . A L P , OR ► • TIO _1 d i llb ax Certificate F.1-/ F v ,4. • • d F a tst. nding Fees "\tr e, Names / Addresses ■ ______\_ •' ect Archived - : Date: 1