Loading...
HomeMy WebLinkAboutCorrespondence"MITCHELL do/'ORGAN, LLP 511 University Drive East, Suite 204 College Station, TX 77840 (979) 260-6963 / (979) 260-3564 FAX To:1 ~f c?Yl 1 1` O Date: Job: 1~ -5- C)c-I MW-L C--)GU Attention: We are sending you: ❑ Attached ❑ Under separate cover via the following: 5 Drawings ❑ Plans ❑ Prints ❑ Samples ❑ Specifications ❑ Letter ❑ Order [ Other C W no C al. 100, Item DDate # of Copies ~ ~ SI ?IG v1 Gt,f~(~I ~c-U-~t a~ ►/s i CO v.{ o +l~.(! i +e-- p i c_.-V-\ Cn C i V-4 `O 2 i ra~nS Ittea as cnecKea Deiow: Y For approval ❑ Approved as noted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as submitted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected copies ❑ For review ❑ Other Remarks: ih, - - - - _ aA- 42 Ctt- a 61 A--4 i6" D'q ~.5 Copy to: Signed: TRANSMISSION VERIFICATION REPORT TIME 05/0312004 09:12 NAME CDCS DEVELOPMENT SER FAX 9797643496 TEL 9797643570 SER.# BROE2J341073 DATE,TIME FAX NO./NAME DURATION PAGE(S) RESULT MODE to, 05103 09:12 914072455293--152 00:00:31 02 OK STANDARD .V ECM CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979,764,3496 MEMORANDUM May 3, 2004 TO: Veronica J. B. Morgan, Mitchell & Morgan, LLP, Via fax 60.3564 1} FROM: Jennifer Prochazka, Staff Pla 4 SUBJECT: OLIVE GARDEN (SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will ba the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review. . Six (6) complete sets of construction documents for the proposed devclonment with the revised site and landecaoina plans attaches! TRANSMISSION VERIFICATION REPORT TIME 05103/2004 09:10 NAME COCS DEVELOPMENT SER FAX 9797643496 TEL 9797643570 SER.# BROE2J341073 DATE,TIME 05103 09:10 FAX N0./NAME 92603564 DURATION 00:00:31 PAGE(S) 02 RESULT OK MODE STANDARD ECM CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 979.764,35701 Fax 979.764.3496 MEMORANDUM May 3, 2004 TO: Veronica J. B. Morgan, Mitchell & Morgan, LLP, Via fax 60.3564 FROM: Jennifer Prochazka, Staff Pla SUBJECT: OLIVE GARDEN (SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: Six (6) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached From: Spencer Thompson To: Jennifer Prochazka Date: 4/25/2004 1:34:58 PM Subject: Re: olive garden I sent this to everyone but you. I have a couple of items on the latest plan set. They are ready to stamp as far as I'm concerned. As I remember it erosion control is shown on the set that was submitted for the Red Lobster clearing and grading permit. I will need to denote "structural fill" on the plans where the water and sewer are under the parking lot. The site will get: 1 1-1/2-in domestic meter. 1 1-in irrigation meter 2 6-in sewer taps Has this property submitted for a TempBlanket ? Please stamp, issue DP and sign for me. thx st "Veronica Morgan" <vCo)-mitchellandmorgan.com> 4/23/2004 4:11:12 PM Can you email me the status of olive garden before you leave town? Thanks V Veronica Morgan Mitchell & Morgan, LLP 511 University Drive Suite 204 College Station, Texas 77840 CONFIDENTIALITY NOTE: This e-mail and any files transmitted with it contain privileged and confidential information and are intended solely for the use of the individual or entity to which they are addressed. If you are not the intended recipient or the person responsible for delivering the e-mail to the intended recipient, you are hereby notified that any dissemination or copying of this e-mail or any of its attachment(s) is strictly prohibited. If you have received this e-mail in error, please immediately notify the sending individual or entity by e-mail and permanently delete the original e-mail and attachment(s) from 0~ April 21, 2004 .c c M L CA~ 4 36,0 shm ~'5 s~ v, M CvrcoZf O ~M Mrn U=a c c~ d "c cm d: rn .,'c c o ~i g~ Qa~ C NJU2inN Ci = W ~c a X OT C rn C) c ~ a J V N O H p ai . ~ M L J 00M J N O n x U) at U C OA g•,N U W Bridgette George COCS-Development Services P.O. Box 9960 College Station, TX 77840 Re: Olive Garden Site Plan Dear Bridgette, The following are our responses to the Staff Review Comments #I for Olive Garden Site Plan. Planning. Comment: ✓ Ple se provide a list of the building materials for all facades roughly sible from the public right-of-way. Answer: This information is provided on the elevation drawings recently submitted. Comment: ✓If you do not wish for phase 2 to be approved with phase 1 at this time, please remove all site plan information from phase 2. Answer: ✓Phase 2 information has been deleted. Comment: ~,-Wease double check the number of parking spaces provided; I only count 136 spaces for phase 1. Answer: ~ -There are only 136 spaces. Comment:„-Aie there any proposed outdoor seating areas? If so, these areas will ne o be counted toward the square footage of the restaurant. Answer: o, there are no outside seating areas. Comment: V-Please call out the height and material of the dumpster screening enclosure. Answer: .v Information added. Height of walls is 8 feet and material matches the building, a stone veneer. Comment ith only 9 feet for the truck unloading area, will there still be a 20- foot clear space for the required fire lane? Is there room to make the u ading area wider to allow for more space for fire access? Answer: ~ / A WB40 sewer trailer is 8.5 feet wide. We have shifted the fire lane stripe to the 20-foot mark and it leaves 9.1 to 9.7 feet. Comment: Jkra-s-e label material used in islands. (i.e.: plantings, sod, brick pav s, etc.) Answer: ose islands that have concrete have been labeled as such. All others are planted per the landscape plan. Comment:, Please label the fire lane through the site. Are the lines around the curbs delineating fire lane? Anse_, The fire lanes have been delineated more clearly. Comment: Please label FDC location on the site plan. Answer: FDC location has been added. Comment: r/Provide a general note that all roof and ground-mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture ,pd scale to maintain a unified appearance. a Answer: ~ Note has been added. Landscauing/Streetscaning/Buffer Comment: ✓ Provide a general note that 100% coverage of groundwater, decorative paving, decorative rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot back , right-of-way, and adjacent property disturbed during struction. ;.S_1 Answer: I te has been added. Engineering: Comment: Please donate whether entire sewer line is public or private. Slope on upper section does not meet public or private requirements. All private sewer to be installed in compliance with plumbing code. All public should meet City Guidelines. Answer: The sanitary sewer line is public to the second manhole. Slopes have been changed to meet the City guidelines and the plumbing code. Comment: A fire flow analysis showing compliance with BCS Unified Design Guidelines is required. One hydrant or two? Answer: Please see attached fire flow letter. Comment: The fire line to the building needs to be a minimum 5 feet from masonry wall/dumpster enclosure. Answer: Fire line has been moved away from the dumpster enclosure. Comment: Show public lines in easements to be dedicated to release temporary blanket easement. Answer: Public lines have been designated as such in the profile. Electrical: Comment: Developer installs conduit per city specs and design. Answer: Acknowledged. Comment: Developer provides 30' of rigid conduit for riser poles. Developer installs first 10'. City installs remainder. Answer: Acknowledged. Comment: Developer pours transformer pad(s) per city specs and design. Answer: Acknowledged. Comment: Developer installs pull boxes as per city specs and design. (pull boxes provided by the city) Answer: Acknowledged. Comment: Developer provides digital Autocad 2002 version of plat and/or site plan. Email to rbolin@cstx.gov Answer: Digital file has been sent to Ronnie Bolin. Comment: Developer provides load data for project. Answer: Load data has been provided to Ronnie Bolin. Comment: Developer provides temporary blanket easement for construction purposes. Answer: Acknowledged. Comment: Developer provides easements for electric infrastructure as installed for electric lines. Answer: Acknowledged. These will be based upon as-built conditions. Miscellaneous: Comment: Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back flow Device, or a Double-Check Back Flow Device, and installed as per City Ordinance 2394. Answer: Acknowledged. Comment: All Backflow devices must be installed and tested upon installation as per City Ordinance 2394. Answer: Acknowledged. Thank you for your cooperation on this project. If you have any question please aiNe us a call. Veronica J.B. rg E. Managing Partner Attachments Cc: File April 21, 2004 Crn O A~ ) U C rn co U=a c 'c v~ H c•-Cd_M c Eo C c S'cin .S w Q a C'> a a~ W V S in U) W ui c ~a L a ~ c 0 t! E a = a~ V c m~ v a ~M ri o n a. -i V N z U' W H W ~ L C J OM ~ W N pp ^N ~i ri . X n U to Spencer Thompson Development Services P.O. Box 9960 College Station, TX 77840 RE: Olive Garden-Fire Flow Analysis Dear Spencer: We have completed a fire flow analysis for Olive Garden per the site plan staff review comments. Olive Garden is approximately 7,685 square feet and equipped with an automatic sprinkler system. The 2000 International Fire Code allows up to a 50% reduction with a minimum flow of 1,500 gpm for sprinkler equipped buildings. Because the square footage of Olive Garden is relatively small compared to the square footages provided in the 2000 International Fire Code the fire flow required is 1,500 gpm, independent of building type. Please see attached excerpt from the 2000 International Fire Code (Exhibit 1). Using the updated College Station water system model in MIKE NET, a domestic flow of 90 gpm, and a fire flow of 1,500 gpm, flows and pressures in the adjacent lines and hydrant were as follows: Item ID Demand Pressure Flow Velocity Junction 2054 1590 gpm 88.605 psi N/A N/A (Hydrant) Pipe 2429 N/A N/A 644.921 gpm 1.830 fps (12") Pipe 2431 N/A N/A 945.079 gpm -2.681 fps (12") Please see the attached MIKE NET report for pipe and junction locations (Exhibit 2). An additional analysis was performed in compliance with the B/CS Unified Design Guideline Manual fire flow guidelines. Page 4 of these guidelines states: "For purposes of this manual, the following shall be used for fire flow determinations unless greater flows are required for hydrants near structures as per the adopted International Fire Code. 2500 gallons per minute for public hydrants in commercial or multi-family areas..."