HomeMy WebLinkAboutFire Flow Reportfireflow.GDB
Horizontal Plan
General
Component Information
Number of Nodes: 1113
Number of Junctions: 1105
Number of Tanks: 3
Number of Reservoirs: 5
Number of Links: 1333
Number of Pipes: 1320
Number of Pumps: 13
Number of Valves: 0
Number of Pipe Vertices: 4
Total Pipe Length [ft]: 978929.56
Total Pipe Volume [ft3]: 1120837.22
Statistics at Time Step: 0; 0 day 0:00 hr
Total Inflow [gpm]: 0.00
Total Outflow [gpm]: 13901.84
Analysis Status
Tank-, and Reservoirs
Page 3 of 4
ED/Time
772
773
775
776
777
778
779
2037
T-1
T-8
SR-1
SR-6
SR-5
SR-4
SR-3
New Tank
0; 0 day
Emptying
Emptying
Filling -
Filling -
Filling -
Filling -
Filling -
Emptying
0:00 hr
163.19[gpm]
3937.70[gpm]
3714.72
[gPm]
3748.62
[gPm]
3595.10
[gym]
4051.15
[gPm]
3836.88
[gPm]
943.73[gpm]
file: //S:\Proj\0404-olivegarden\MikeNET\fireflow.HTM 4/20/2004
fireflow.GDB
I Results - Junctions
Time Level: 0; 0 day 0:00 hr
Number of Junctions: 1(Selection)
Junction ID
Description
Elevation
Demand
Grade
Pressure
Quality
[ft]
[gpm]
[ft]
[psi]
2054
262.000
2500.000
411.325
64.702
0.000
Results - Pipes
Time Level: 0; 0 day 0:00 hr
Number of Pines: 2(Selection)
Page 4 of 4
Pipe
Description
Node
Node
Diameter
Length
Roughness
Material
Age
Flow
Velocity
Headloss
Headloss/1000
ID
1
2
[in]
[ft]
[millift]
[gpm]
[ft/s]
IN
[ft]
2429
2052
2054
12.000
240.359
120.000
0
1014.026
2.877
0.725
3.016
2431
2054
2055
12
000
616
954
120
000
0
-4.215
3.777
6.121
.
.
.
1485.974
Back to Top
file://S:\Proj\0404-olivegarden\MikeNET\fireflow.HTM 4/20/2004
fireflow.GDB Page 2 of 4
file:HS:\Proj\0404-olivegarden\MikeNET\fireflow.HTM 4/21/2004
fireflow.GDB Page 2 of 4
file://S:\Proj\0404-olivegarden\MikeNET\fireflow.HTM 4/20/2004
fireflow.GDB
I Results - Junctions
Time Level: 0; 0 day 0:00 hr
Number of Junctions: 1(Selection)
Junction ID
Description
Elevation
Demand
Grade
Pressure
Quality
IN
[gpmI
[ft]
[psi]
2054
262.000
1590.000
466.490
88.605
0.000
Results - Pipes
Time Level: 0; 0 day 0:00 hr
Number of Pines: 2(Selection)
Page 4 of 4
Pipe
Description
Node
Node
Diameter
Length
Roughness
Material
Age
Flow
Velocity
Headloss
Headloss/1000
ID
1
2
[in]
IN
[millift]
[gpm]
[ft/s]
[ft]
[ft]
2429
2052
2054
12.000
240.359
120.000
0
644.921
1.830
0.314
1.305
2431
2054
2055
12
000
616.954
120.000
0
-2.681
1.633
2.648
.
945.079
Back to Top
file: //S:\Proj\0404-olivegarden\MikeNET\fireflow.HTM 4/21/2004
fireflow.GDB
Page 1 of 4
fireflow.GDB
x
W
Analysis Type: 2500 GPM
Steady State
Project Description:
Summary
. General
. Analysis Status
Details
. Junctions
. Pipes
file://S:\Proj\0404-olivegarden\MikeNET\fireflow.HTM 4/20/2004
fireflow.GDB
Horizontal Plan
General
Component Information
Number of Nodes: 1113
Number of Junctions: 1105
Number of Tanks: 3
Number of Reservoirs: 5
Number of Links: 1333
Number of Pipes: 1320
Number of Pumps: 13
Number of Valves: 0
Number of Pipe Vertices: 4
Total Pipe Length [ft]: 978929.56
Total Pipe Volume [ft3]: 1120837.22
Statistics at Time Step: 0; 0 day 0:00 hr
Total Inflow [gpm]: 0.00
Total Outflow [gpm]: 12991.84
Analysis Status
Tanks and Reservoirs
Page 3 of 4
11D/Time
772
773
775
776
777
778
779
2037
T-1
T-8
SR-1
SR-6
SR-5
SR-4
SR-3
New Tank
0; 0 da
y
Em
Emptying
Em
Emptying
Filling -
Filling -
Filling -
Filling -
Filling -
Emptying
0:00 hr
454.15[gpm]
4116.59[gpm]
3714.72
3748.62
3595.10
4051.14
3836.88
1383.87[gpm]
[gpm]
[gpm]
[gpm]
[gpm]
[gpm]
file://S:\Proj\0404-olivegarden\MikeNET\fireflow.HTM 4/21/2004
APPENDIX B FIRE-FLOW REQUIREMENTS FOR BUILDINGS
TABLE B105.1
MINIMUM REQ(103EO FIRE FLOW AND FLOW DURATION FOR BUILDINGS
FIRE AREA Isatumare feet)
r onE FLOW
FLOW
Type lA and 10'
pe NA and IBA'
pe IV end VAM
Type Nil and BID'
V B'
(gallons per minuts b
DURATION (hwrS)
0-22.700
0-12,700
0-8,200
0-5,900
0-3.600
1,500
22701-30 200
12,701-17,000
8,201-10,900
5,901-7.900
3,601-4.800
1,750
30 1-38 700
17,001.21800
10,901-12,900
7,901-9.800
4.801-6.200
2,000
3
38,701-48300
21,801-24,200
12,901-17,400
9,801-12,600
6,201-7,700
2,250
48,301.59.000
24,201-33,200
17,401-21,300
12,601-15.400
7,701-9.400
2.500
59.001-70.900
33,201-39,700
21,301-25,500
15.401-18,400
9A01-11.300
2,750
70,901-83,700
39.701.47,100
25501-30,100
18401-21,800
11.301-13400
3,000
83,70147,100
470101-541900
30,101-35,200
21,801-251900
13 401-15,600
3.250
3
97,7014 12,700
54,901-634400
35,201-40,600
25,901-29,300
15,601-19,000
3,500
112701-128700
69f401-72.400
40601-46,400
29.301-33,500
18,001.20,600
3,750
128.701-145,9M
72 401-8 100
46,401-52,5M
53,501-37.900
20,601-23,300
4,000
145901-1§j,M
82.10192,400
52,501-59,100
37,901-42,700
23,301-26,300
4250
164,201.183,400
92,401-103,100
59,101-6,000
42,701-47.700
26,301-29,300
4,500
183,401-203700
103.101-114,600
66 Wt-73.3W
47,701-53.000
29 301-326W
4,iw
203,701-225,200
114,601-126,700
73,301-81.100
53,001-58.600
32 601- 000
5 000
225,201.247.70U
126, %01-09 400
81,101-89,2W
58,60t-65,400
36,001-39.6W
$12$0
247,701.271
139,401-152.600
89,201-97,700
65.401-70,600
39,601-43,400
5,500
271,201-291,9W
152.001.166,500
97,701-106,300
70,601-77,000
43,401-47.400
5,750
295,961-0,reater
166,501-(heater
106,501415,800
77.001-83,70D
47.401-51.500
6,000
4
-
-
115.801-125,500
83,701-90,600
51.501-55.70D
6,250
-
125.501-135,500
90,601-97,900
55,701-60,200
6,500
-
-
135,501-145,800
97,901-106,800
60,201-64,600
6,750
-
145,801-156,700
106.801.113,200
64,801-69,600
7,000
-
-
156.701-167.900
113,201 121,300
69,601-74.600
7,250
-
-
167,901-179,400
121,301-129,600
74,601-79,800
7,500
170,401•491,400
120,601-138,300
79,801-85,100
7.750
191,401-0reater
138,301-0reater
85,101-Crreater
8,000
For St: i uquam foot = 0.0929 ml. I gallon per monure. = 3.7851 /m, I Iu„u,d pm Anave inch= 6.995 kP&
a. Types of Construction we based on the International Building Cede.
t~ NirAwrad at 20 psi,
958
2000 INTERNATIONAL FIRE CODE40
Z0/Z0 39dd N3S 1N3WdO-13A3Q SDOS 96PE09LSL6 EZ EXHIBIT 1
fireflow.GDB
fireflow.GDB
Analysis Type: 1 X90 GPM
Steady State
Project Description:
Summary
. General
. Analysis Status
Details
. Junctions
. Pipes
file://S:\Proj\0404-olivegarden\MikeNET\fireflow. HTM
Page 1 of 4
4/21/2004
N
_m
x
W
Because the fire flow required by the 2000 International Fire Code is less than 2500
gpm, an additional analysis was performed for this flow. Flows and pressures in the
adjacent lines and hydrant were as follows:
Item ID
Demand
Pressure
Flow
Velocity
Junction 2054
2500 gpm
64.702 psi
N/A
N/A
(Hydrant)
Pipe 2429
N/A
N/A
1014.026 gpm
2.877 fps
(12")
Pipe 2431
N/A
N/A
1485.974 gpm
-4.215 fps
(12")
Please see the attached MIKE NET report for pipe and junction locations (Exhibit 3).
The existing hydrant and twelve inch (12") lines are sufficient for the fire flow
requirements for Olive Garden. In both analyses flows were kept below 12 fps and
pressure remained above 20 psi, as per the B/CS Unified Design Guidelines Manual. If
you have any further comments or questions please feel free to contact me.
Sincerely,
1 a,4
Rebecca Riggs, EIT
Graduate Engineer
cc: file
Attachments
0, co •T~+9~~ J
~P~~•O~
1
ICAJ.B. VORCA.N
0•9 77689 ; v?'
,41
S:\Proj\0404-olivegarden\docs\fireflow.doc