CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station,, Texas 77542
Phone (979) 764-3570 / Fax (979) 744-3496
MEMORANDUM
September 2, 2004
TO: Curtis Investments-College Station, LLP, via fax 214,368.6067
FROM: Jennifer Reeves, Project Manager
SUBJECT: USDA - SITE PLAN (SDSP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The fallowing page
is a list of staff review comments detailing items that need to be addressed.
Please address the comments and submit the following information for further
staff review:
One (1) complete set of construction documents for the proposed
development with the revised site and landscaping plans attached
One (1) revised site and landscaping plan.
If there are comments that you are not addressing with the revised site plan,
olease attach a letter exolainina the datails_ If vnij haves nnv m IAP.tinnn nr nnr±rl
Jennifer Reeves - Fwd: New Development - Week of 04/05/04 Page 1
From:
Melissa Rodgers
To:
Planners/Engineers
Date:
4/712004 11:03:18 AM
Subject:
Fwd: New Development - Week of 04/05/04
Pete Caler 4/7/2004 10:56:45 AM
KTH Commercial Add'n (04-88): Can not comment until site plan is submitted.
PJK Estates (04-89): Sanitation is OK with this project.
Forest Ridge Elementary (t"-9("_ Pad is OK, however, if gates are going to be installed enclosure wall
depth needs to be 12 feet ins'-~ad of nine feet deep.
Horse Haven Estates (04-91): For solid waste service, Horse Shoe Bend and Horse Shoe Drive will each
require a temporary turn-around until the other phases of the project are constructed.
Williams Creek Subdivision-104-9?!: Sanitation is OK with this project.
AmeriSuites Hotel (04-94): Fnclosure approach angle (58 degrees) is too sharp for the lane space (35
feet). Enclosure needs to be Dt2 : d by 13 degrees clockwise to create an approach angle of 45 degrees.
USDA (04-93): Plans have t--) dl"`.:.-nnt dumpster locations. If sheet SP-1 is used then sanitation is OK
with this project. If sheet A- Lan ,--pipe Plan) is used then both enclosure dimensions and approach
area do not meet requiremei,.s.
Olive Garden (04-95): Sanitation is OK with this project.
Pete Caler
Sanitation Superintendent
City of College Station
Phone: (979) 764-3690
Fax: (979) 764-3822
C
S
C
April 12, 2004
as 0q
Ms. Bridgette George, Assistant Development Manager
City of College Station
Development Services
1101 Texas Avenue South
P. O. Box 9960
College Station, Texas 77842
Re: Re-submittal of Site Plan for Proposed Department of Agriculture Building
Holleman Drive near Dartmouth Road; College Station, Texas
Dear Ms. George:
This letter transmits ten (10) copies of our re-submittal of the site plan package for the proposed United
States Department of Agriculture Office Building planned to be located on Holleman Drive, east of the
intersection with Dartmouth Road in College Station, Texas. This submittal is being made on behalf of
the owner/developer of the site/project, Curtis Investments-College Station, LLC of Dallas, Texas. An
earlier submittal of the site plan package was withdrawn due to some conflicts between the site plan and
the landscape plan as submitted by the architect. Those conflicts have been resolved. The required fees
for the submittal were paid with the original submittal.
The submitted site plan package includes three separate items: (1) the site plan (sheet SP-1) as prepared
by CSC Engineering & Environmental Consultants, Inc. (CSC); (2) the landscape plan (sheet L-1)
prepared jointly by CSC and the project architect, Tim Risley & Associates from Fort Smith, Arkansas
(Risley); and (3) the illustration (sheet A4) of the dimensioned building elevations as prepared by Risley.
Color and material samples of the building are being collected by Mr. Chris Curtis of the developer,
Curtis Investments-College Station, LLC, and will be submitted separately within approximately one to
two weeks.
We sincerely appreciate your assistance in facilitating this submittal. Please do not hesitate to call should
any questions arise or if additional information is required.
Kindest regards,
nl.
M. Frederick Conlin, Jr. P.E.,
Senior Engineer
MFC:am
via: Hand Delivery
cc: Mr. Chris Cutis
Curtis Investments - College Station, LLC
via: U.S. Mail
- 1
ustin Fuller, E.I.T.
Graduate Engineer
3407 Tabor Road Phone (979) 778-2810
Bryan, Texas 77808 Fax (979) 778-0820
Jennifer Reeves - Re: Water-Conserving irrigation system Page 1
From: Jennifer Nations
To: Jennifer Reeves
Date: 4/14/2004 1:24:22 PM
Subject: Re: Water-Conserving irrigation system
Hi Jennifer,
In general a drip irrigation system will use less water than a spray irrigation system, because they apply
water very slowly, to the plant's root zone, as opposed to spraying it straight up in the air to be blown away
by the wind.:-) You should still ask to see an irrigation plan, I think. Doesn't the UDO require an irrigation
plan? Rain sensors and wind sensors should also make it a more water-conserving system. These
devices prevent the irrigation system from coming after a predetermined amount of rain has fallen, or if
wind speeds are over a certain amount.
Hope that helps! - Jennifer
Jennifer Reeves 4/14/2004 10:26:57 AM
(Section 7.5.7.a) of the (UDO) Unified Development Ordinance states:
"A 10 percent point credit will be awarded where the irrigation system employed is a recognized
water-conserving system"
I am reviewing the site plans for the USDA building that will be going in at Holleman and Dartmouth in the
Wolf Pen Creek Corridor. They have deducted 10 percent of there landscape point requirement because
they are going to propose the irrigation to be a drip system. My question to you is...Are all drip systems
water conserving? They have not even shown us a plan as to what their drip system consist of so I
hesitate to approve something that I have yet to see.
I am asking you this because I figured you were a little bit more knowledgeable about water conserving
irrigation systems than I am. I appreciate any kind of insight that you may be able to offer. If you would like
to take a look at the irrigation plan when it comes in, I would be glad to include you in on the review.
Thank you for time :o)
Jennifer
Jennifer Reeves
Staff Planner
City of College Station
ireeves(cD-cstx.gov
(979) 764-3570
(979) 764-3496 FAX
Jennifer Reeves - Re: USDA Site Plan Pagel
From:
Pete Caler
To:
Jennifer Reeves
Date:
4/7/2004 4:14:07 PM
Subject:
Re: USDA Site Plan
Thanks!
Jennifer Reeves 4/7/2004 1:20:18 PM
Hey Pete - I wanted to let you know that I talked to the applicant about their submittal (there were
numerous things wrong). I told him that we would not consider this an official submittal. He is going to try a
whole new submittal for next weeks review. I am going to hang on to your comment and I will make sure
that you get the new copies to review. Thanks, Jennifer
USDA (04-93): Plans have two different dumpster locations. If sheet SP-1 is used then sanitation is OK
with this project. If sheet A-1 (Landscape Plan) is used then both enclosure dimensions and approach
area do not meet requirements.
Jennifer Reeves
Staff Planner
City of College Station
ireeves Oncstx.aov
(979) 764-3570
(979) 764-3496 FAX
City of Georgetown Planning & Development Services
D 512.930.3575 www.georgetown.org
-25~ _ ~Co ABC e~ Q~
r
"To provide our Customers with a Comprehensive, Consistent, and
Coordinated Planning & Building Process for the Preservation,
Enhancement and Economic Vitality of Georgetown."
04/05/2004 17:36 409-778-0820 CSC ENG &QENV PAGE 01
00,
~
C , s y `wp Y~,
S a. W ,
C FA
CSIMILE TRANSMITTAL SHEET
TO:
FROM:
W. Spencer G. 'I wo"on, Jr.
Rick Conlin
COMPANY:
DATE:
City of College Station. Development Staff
Monday, 5th ApnI 2004
FAX NUMBER:
TIME:
(979) 764-3496
5:36 PM
PHONE NUMBER:
TOTAL NO. OF PAGES INCLUDING COVER:
(979) 764-3570
3
RE: _
PROJECT NUMBER;
Holleman Dr Utilities in Owt of Pmpowd
403 1 3 8-1 20
USDA Building
[JURGENT ® FOR REVIEW C@ PLEASE COMMENT ❑ PLEASE REPLY ❑ PLEASE RECYCLE
NOTES/COMMENTS:
Dear Spencer,
Please accept this facsimile Umsnvttal that has two halves of a portion of the she plan for the proposed
USDA building on Holleman Drive that shows the planned layout of utilities with, the existing and
proposed Holleman Drive ROW and the proposed adjacent PUE.
Reference my e-mail of today that explains (all be it poorly) the issues that have been raised with
respect to utility locations.
Please call or write whenever you have a free minute (ha! ha!) to review this.
Rick
3407 Tabor Road Phone (979) 778-2810
Bryan, Texas 77808 Fax (979) 778-0820
S
C
November 18, 2004
Ms. Jennifer Reeves, Project Manager
City of College Station
Development Services
1101 Texas Avenue South
P. O. Box 9960
College Station, Texas 77842
Re: Third Submittal of Revised Site Plan and Landscape Drawings and Construction Drawings for
Proposed United States Department of Agriculture Office Building
Holleman Drive near Dartmouth Road; College Station, Texas
Incorporating Revisions in Response to Staff Review Comments No. 2
Case File #04-00500093
Dear Ms. Reeves:
This letter transmits the revised site development documents outlined in your Memorandum dated
September 2, 2004 for the proposed United States Department of Agriculture Office Building planned to
be located on Holleman Drive, east of the intersection with Dartmouth Road in College Station, Texas.
The submitted site development documents includes the following six (6) separate items:
(1) the revised site plan as prepared by CSC Engineering & Environmental Consultants, Inc.;
(2) the revised landscape plan as originally prepared by the project architect, Tim Risley &
Associates from Fort Smith, Arkansas (Risley) and later modified by CSC;
(3) one complete set of the site development construction documents prepared by CSC which
include the attached copies of the previously cited revised site and landscape plans;
(4) a water demand report;
(5) a drainage report; and
(6) an engineering cost estimate for the domestic water line and fire line.
A listing of the construction drawings presented in the accompanying Table 1
The submitted site plan, landscape plan, and construction drawings have all been revised to address the
comments of the City of College Station staff as outlined in the previously referenced Memorandum. The
staff comments were designated as "Staff Review Comments No. 2" and are summarized in Table 2,
along with a description of how the responses to the comments were integrated into the previously
referenced site plan, landscape plan, and construction documents. The presently submitted construction
documents also reflect the changes discussed for the site plan and the landscape plan.
3407 Tabor Road Phone (979) 778-2810
Bryan, Texas 77808 Fax (979) 778-0820
Re-submittal of Revised Site and Landscape Plans and Submittal of Construction Documents
Submittal No. 3 Based Upon Staff Review comments No. 2
Proposed United States Department of Agriculture Office Building; College Station, Texas
Page 2
Table 1. Listing of the Submitted Site Development Construction Drawings for the Proposed United
States Department of Agriculture Office Building
SHEET
DRAWING
REVISON
DATE
NO.
TITLE
NO.
Cover Sheet
C-1
General Notes
0
11/15/04
C-2
Site Plan
0
11/15/04
C-3
Dimension Control
0
11/15/04
C-4
Grading and Drainage
0
11/15/04
C-5
Utilitv Plan (WL. SS. Electrical and Nat. Gas)
0
11/15/04
C-6
Water Line Plan and Profile
0
11/15/04
C-7
Paving and Drainage Details -
0
_ 11/15/04
C-8
Paving and Drainage Details -
0
l /15/04
C-9
Water and Waste Water Details
r
/15/04
C-10
Water and Waste Water Details
0
/15/04
C-11
Erosion Control Plan
0
/15/04
We sincerer- appreciate your assistance in facilitating this submittal. Please do not hesitate to call should
any questions arise or if additional information is required.
Kindest regards,
CSC Engineering & Environmental Consultants, Inc.
it, ~Z_
M. Frederick Conlin, Jr. P.E.. JD
Senior Engineer
MFC:am
via: Hand Deliverv
Attachments: (Listed in Body- of Letter)
CSC ENGINEERING & ENVIRONMENTAL CONSULTANTS, INC.
` RC
S
C
November 30, 2004
Ms. Bridgette George, Development Coordinator
City of College Station
Development Services
1101 Texas Avenue South
P. O. Box 9960
College Station, Texas 77842
~3v1 ~
Re: Final Submittal of Revised Site Plan and Landscape Drawings and Construction Drawings for
Proposed United States Department of Agriculture Office Building
Holleman Drive near Dartmouth Road; College Station, Texas
Incorporating Revisions in Response to Staff Review Comments No. 3
Case File #04-00500093
Dear Ms. George:
This letter transmits the revised site development documents outlined in your Memorandum dated
November 24, 2004 for the proposed United States Department of Agriculture Office Building planned to
be located on Holleman Drive, east of the intersection with Dartmouth Road in College Station, Texas.
As requested in the referenced Memorandum, the site development documents transmitted via this letter
include the following three (3) separate items:
(1) eight (8) complete sets of the site development construction documents prepared by CSC
which include copies of the revised site and landscape plans [six (6) sets are for the City
and the other two (2) sets are for the contractor and engineer];
(2) two (2) copies of the revised site plan as prepared by CSC Engineering & Environmental
Consultants, Inc.; and
(3) one (1) copy of the revised landscape plan as originally prepared by the project architect,
Tim Risley & Associates from Fort Smith, Arkansas (Risley) and later modified by CSC.
A listing of the construction drawings presented in the accompanying Table 1
The submitted site plan, landscape plan, and construction drawings have all been revised to address the
Engineering comment concerning the addition of another 8-inch valve on the water along Holleman
Drive. That comment is outlined in "Staff Review Comments No. 3" in the previously referenced
Memorandum. Although the plans for Holleman Drive water line are being prepared by Kling
Engineering and Surveying (Kling}, CSC has shown the additional value on our drawings. CSC has also
notified the project contractor, JaCody Construction, Inc. (JaCody), of the need for the value, and JaCody
will oversee the installation of the valve.
We are aware of the other Engineering comments concerning the need for the Final Plat to be approved
and for the waterline to be bonded (or constructed). Kling is performing the work associated with the
Final Plat submittal. JaCody is coordinating with Kling to insure that the Final Plat is submitted along
with the appropriate bond for construction of the public water line. CSC understands that the attached
3407 Tabor Road Phone (979) 778-2810
Bryan, Texas 77808 Fax (979) 778-0820
r Re-submittal of Revised Construction Documents, Site Plan and Landscape Plan
Submittal No. 4 Based Upon Staff Review comments No. 3
Proposed United States Department of Agriculture Office Building; College Station, Texas
Page 2
®~isMnwanw -
construction plans cannot be approved until the Final Plat is submitted and the bonding is completed, but
we are submitting the plans in anticipation that both of these items will be completed in the nett week or
two.
Table 1. Listing of the Submitted Site Development Construction Drawings for the Proposed United
States Department of Agriculture Office Building
SHEET
NO.
DRAWING
TITLE
REVISON
NO.
DATE
Cover Sheet
C-1
General Notes
0
11/1/04
C-2
Site Plan
0
11/15/04
C--3-
'Dimension Control
0
11/15/04
-4
C_4__-
Grading and Drainage
0
11/15/04
C-5
Utility Plan (WL. SS. Electrical and Nat. Gas)
0
11/15/04
_C-6
Water Line Plan and Profile
0
11/15/04
C-7
Paving and Drainage Details _
0
11/15/04
C-8
Paving and Drainage Details
0
11/15/04
C-9
Water and Waste Water Details
0
11/15/04
C-10
Water and Waste Water Details
0
11/15/04
C-11
Erosion Control Plan
0
11/15/04
We sincerely appreciate your assistance in facilitating this submittal. Please do not hesitate to call should
any questions arise or if additional information is required.
Kindest regards.
CSC Engineering & Environmental Consultants, Inc.
Tn f qt'
M. Frederick Conlin, Jr. P.E., JD
Senior Engineer
MFC:am
via: Hand Delivery
Attachments: (Listed in Body of Letter)
CSC ENGINEERING & ENVIRONMENTAL CONSULTANTS, INC.
0 q -q3
~Wr The G of
,Colega Station, Texas
~ r
Embracing the Past, Exploring the Future.
Legal Department
P.O. Box 9960 • 1101 Texas Avenue • College Station, TX 77842 • (979)764-3507 • FAX: (979)764-3481 • www.cstx.gov
MEMORANDUM
TO: Bridgette George, Development Services
FROM: Brenda Godfrey, Legal Assistant
SUBJECT: Temporary Blanket Utility Easement
CURTIS INVESTMENTS - COLLEGE STATION, LLC
1.68 ACRES, Morgan Rector Survey, A#46, College Station,
Brazos County, Texas
DATE: December 14, 2004
Attached is the original Temporary Blanket Utility Easement. Please forward this document to
the Owner so that it may be properly executed by the Owner and Lienholder before a Notary
Public. Upon receipt of the fully executed Temporary Blanket Utility Easement, the document
will be executed by Legal and filed for record in the Brazos County Clerk's Office.
If you need any additional information, please let me know.
Bg
Attachments
Home of Texas A&M University
Home of the George Bush Presidential Library and Museum
0 4-~3
~I~.~~ alb/os
CITY OF COLLEGE STATION
MEMORANDUM
TO: Bridgette George, Development Services
FROM: Brenda Godfrey, Legal Assistant
SUBJECT: Public Utility Easement
CLARKE & WYNDHAM, INC., a Texas corporation, REAL
ALCHEMY I, LP, a Texas limited partnership, and JPJ
INVESTMENTS, a Texas general partnership composed of James
Jarvie, David Jarvie, Greg Jarvie, and Chris Pesek, General
Partners
0.02 acres, more or less, lying and being situated in the Morgan
Rector Survey, Abstract No. 46, College Station, Brazos County,
Texas, and being part of the called 5.818 acre tract described in the
deed from Organized Capital, Inc., (60% undivided interest) as
recorded in Volume 2195, Page 191, of the Official Records of
Brazos County, Texas, said 5.818 acre tract being part of the called
14.62 acre tract described in the deed to Organized Capital, Inc.,
recorded in Volume 2062, Page 225, of the Official Records of
Brazos County, Texas.
DATE: February 7, 2005
Attached is the original Public Utility Easement. Please forward this document to Paul Clarke so
that he may properly execute it before a Notary Public. He has furnished Legal his authority to
execute on behalf of all parties. Upon receipt of the fully executed Public Utility Easement, the
document will be executed by Legal and filed for record in the Brazos County Clerk's Office.
If you need any additional information, please let me know.
Bg
Attachments
Legal Department
P.O. BOX 9960 • 1101 TEXAS AVENUE
COLLEGE STATION • TEXAS . 77842
TEL. 979.764.3507 ' FAX. 979.764-3481
www.cstx.gov
CI
GY~pp
:III v
Curtis Investments LLC
Commercial & Industrial Properties
5641 Yale Blvd., Suite 100, Dallas, TX 75206 °1+nne: 214/368-5091 Fax: 214/368-6067
5020 Old Greenwood St., P.O. Box 6443, Fort Smith, / . _ne: 479/646-2365 Fax: 479/648-3831
September 4, 2003
Pie
VIA FEDERAL EXPRESS
TRACKING NO.: 7914 8998 9351
Bridgette George
City of College Station
1101 Texas Avenue
College Station, TX 77845
Re: College Station, TX USDA
Dear Ms. George:
I have enclosed two copies of the (i) Site Plan, (ii) Floor Plan and (iii) Color Rendering
for the proposed USDA office in the Wolf Pen Creek Corridor.
I look forward to the Pre-Application Conference scheduled for Monday, September 15,
2003 at 4:00 p.m.
Please let me know if you have any questions or comments.
Sincerel
r .0~ 0 --mossom
Chris Curtis