HomeMy WebLinkAboutPublic Infrastructure Estimate Allsize Storage
Estimate of Public Infrastructure
March 15, 2004
Item Description Unit Quantity Unit Price Total
Water System Construction
1 Fire Hydrant Assembly EACH 2 2,200.00 4,400.00
Water System Construction 4,400.00
KENT M. LAZA
65923 0 a l
L
/ /2 .
3/ /SJD Y