Loading...
HomeMy WebLinkAboutFire Flow / r Water isLife Exhibit A Power isProgress Fire Hydrant 9 Flow Test Service is Pride College Station CommunNy Owned 1601 GRAHAM ROAD COLLEGE STATION TEXAS 77845 Date: 29 MARCH 2004 Number pages including cover sheet - 1 Fax to: 693 -2554 Attention: GAYLA MESSARRA Company: MCCLURE ENGINEERING From: Butch Willis Water Wastewater Division Phone: 979-764-3435 Fax: 979 - 764 -3452 FLOW TEST REPORT Location: 3129 TEXAS Flow hydrant number: F -042 Pitot reading: 95 (GPM): 1190 Static hydrant number: F -032 Static PSI: 105 H = Total head (ft.) Residual PSI: 102 H = Elevation + Pressure Head H =272 ft. + (102 psi / 0.43333) A =507 ft. E, cn o o °C �z > N r- � Z �o CN �a �, r-� w. O \ k �� Q O b o y ti'. Q p v di o W V o 0 Ca.: rn cv 0 0 a '311711-1 * a , c■ Ca_ ik c.:1L'.' G4. 4 41 14 °C1 % I 4 4 0 04 4, z .it O � � o LU Z N o N II fere `�! --NeEME--Z-45 t_ / O . 6 / ...• ‘ N �/ �! a!� O +�1 r do co o ! 417! , b ° O ..2.. mi � �_ 1 ! - .• o� / `�` O N al I,.. / 3° " ! Ar Q4 o ! CD 44 . l I o !' Lu y ti o LC ? I 4:::" Q) I o 0 E � �•g� z OP t I - o En � a 0 r%y . r 2 p Z C K) Exhibit C Water System Analysis For Allsize Storage * * * * * * * * * * * * * * K Y P I P E * * * * * * * * * * * * * * * University of Kentucky Hydraulic Analysis Program * for the Distribution of Pressure and Flows in Pipe Network Systems * * FORTRAN VERSION - 3.40 (01/02/91) * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * DATE: 3/30/2004 TIME: 9:54:29 INPUT DATA FILENAME allsize.dat TABULATED OUTPUT FILENAME allsize.out ***************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** S U M M A R Y O F O R I G I N A L D A T A ***************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** U N I T S S P E C I F I E D FLOWRATE IS EXPRESSED IN GPM AND PRESSURE IN PSIG P I P E L I N E A N D P U M P D A T A PIPE NO. NODE NOS. LENGTH DIAMETER ROUGHNESS MINOR LOSS K FIXED GRADE (FEET) (INCHES) 1 0 1 540.0 6.0 150.0 1.40 507.00 2 1 2 370.0 8.0 150.0 .00 3 2 3 310.0 8.0 150.0 1.80 4 0 3 560.0 8.0 150.0 .40 507.00 A SUCCESSFUL GEOMETRIC VERIFICATION HAS BEEN COMPLETED J U N C T I O N N O D E D A T A JUNCTION NUMBER DEMAND ELEVATION CONNECTING PIPES 1 1253.00 276.00 1 2 2 1250.00 277.00 2 3 3 .00 275.00 3 4 O U T P U T O P T I O N D A T A OUTPUT SELECTION: ALL RESULTS ARE OUTPUT EACH PERIOD S Y S T E M C O N F I G U R A T I O N THIS SYSTEM HAS 4 PIPES WITH 3 JUNCTIONS , 0 LOOPS AND 2 FGNS