Loading...
HomeMy WebLinkAboutStaff Commentss CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM April 12, 2004 TO: Louise Fischer, Kerr Surveying, Via fax 691.8904' FROM: Bridgette George, Assistant Development Manager SUBJECT: KTH COMMERCIAL ADDITION (PP) - Preliminary Plat Staff reviewed the above-mentioned preliminary plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, April 26, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for Thursday, May 6, 2004, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Ten (10) copies of the revised preliminary plat; and, One (1) Mylar original of the revised preliminary plat. One (1) copy of the digital file of the preliminary plat on diskette or e-mail to nmanhart@ci.college-station.tx.us Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Spencer Thompson or myself at 764.3570. Attachments: Staff review comments cc: KTH Investments, 1701 Southwest Pkwy, Ste. 208, College Station, TX, 77840 Case file #04-00500088 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: KTH COMMERCIAL ADDITION (PP) - 04-00500088 PLANNING 1. The proposal for lots 5 and 6 to take access off of Decatur is not in compliance with the Comprehensive Plan's goal to protect neighborhood integrity. As previously discussed, access to Decatur would be appropriate for light commercial, but not industrial uses. With the current zoning, please show access coming from the frontage road. Reviewed by: Molly Hitchcock Date: April 12, 2004 ENGINEERING 1. Please show Decatur constructed to the Crowley Tract. 2. Show required utilities for subdivided properties. All parcels shall have water, sewer and access. 3. Please add note that this area is in the 97-01 Sewer Impact Fee Area. 4. With the current zoning, please show access coming from the frontage road. You may wish to set up a meeting with Development Services to discuss possible rezoning options, if so desired. Reviewed by: Spencer Thompson Date: April 12, 2004 ELECTRICAL 1. Developer installs conduit as per city specs and design. 2. Developer provides 30' of rigid conduit for riser pole(s). Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design. (pull boxes provided by the city). 5. Developer provides digital AutoCAD 2002 version of plat and/or site plan. Email to rbolin@cstx.gov. 6. Developer provides load data for project. 7. Developer installs street lighting per city specs and design. 8. Developer provides temporary blanket easement for construction purposes. 9. Developer provides easements for electric infrastructure as installed for electric lines. Reviewed by: Ronnie Bolin Date: 4-6-04 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2of2