April 1, 2004
TO: Adam Wallace, Via fax 775.4787
FROM: Bridgette George, Assistant Development Manager
SUBJECT: FS KAPCHINSKI SUB L9-10 B1(MP) - Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list
of staff review comments detailing items that need to be addressed. If all comments
have been addressed and the following information submitted by Monday, April 26,
10:00 a.m., your project will be placed on the next available Planning and Zoning
Commission meeting scheduled for, Thursday, May 6, 2004, 7:00 p.m. in the City Hall
Council Chambers, 1101 Texas Avenue.
Two (2) copies of the revised final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
nmanhart@ci.college-station.tx.us
Upon receipt of the required documents for the Planning & Zoning meeting, your project
will be considered formally filed with the City of College Station. Please note that if all
comments have not been addressed your project will not be scheduled for a Planning &
Zoning Commission meeting. Your project may be placed on a future agenda once all
the revisions have been made and the appropriate fees paid. If you have any questions
or need additional information, please call Spencer Thompson or myself at 764.3570.
Attachments: Staff review comments
cc: Ali Jaffar, Via fax 823.6617
Dante Carlomagno, Carlomagno Surveying, Via fax 775.4787 ✓
Case file #04-00500087
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: FS KAPCHINSKI SUB 1-9-10 B1(MP) - 04-00500087
ENGINEERING
1. Show BFE on floodplain as 292.5.
2. Show on each lot: Minimum Finished Floor Elevation 293.5.
3. Show 10-ft PUE on front of lots to be dedicated with this plat. As shown, it appears
the easement is existing. I am not aware of an existing easement in this location.
Reviewed by: Spencer Thompson
Date: April 01, 2004
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer installs pull boxes as per city specs and design.(pull boxes
provided by the city.
4. Developer provides temporary blanket easement for construction
purposes.
5. Developer provides easements for electric infrastructure as installed for
electric lines (including street lights).
Reviewed by: Ronnie Bolin
Date: 4-5-04
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the
City, will constitute a completely new review.
Page 2 of 2
Application is hereby made for the following development specific site/waterway alterations:
ACKNOWLEDGMENTS:
I, AA_', design engineer/owner, hereby acknowledge or affirm that:
The information and conclusions contained in the above plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage
Policy and Design Standards. As a condition of approval of this permit application, I agree to construct the
improvements proposed in this application according to these documents and the requirements of Chapter 13
of the College Station City Code.
Property Owner(s) Contractor
CERTIFICATIONS: (for proposed alterations within designated flood hazard areas.)
A. I, certify that any nonresidential structure on or proposed to be on this site as part of this application
is designated to prevent damage to the structure or its contents as a result of flooding from the 100 year
storm.
Engineer Date
B. I, certify that the finished floor elevation of the lowest floor, including any basement, of any
residential structure, proposed as part of this application is at or above the base flood elevation established in
the latest Federal Insurance Administration Flood Hazard Study and maps, as amended.
Engineer Date
C. I, , certify that the alterations or development covered by this permit shall not diminish the flood-
carrying capacity of the waterway adjoining or crossing this permitted site and that such alterations or
development are consistent with requirements of the City of College Station City Code, Chapter 13 concerning
encroachments of floodways and of floodway fringes.
Engineer Date
D. I, , do certify that the proposed alterations do not raise the level of the 100 year flood above
elevation established in the latest Federal Insurance Administration Flood Hazard Study
Engineer Date
Conditions or comments as part of approval:
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets,
or existing drainage facilities. All development shall be in accordance with the plans and specifications
submitted to and approved by the City Engineer for the above named project. All of the applicable codes and
ordinances of the City of College Station shall apply.
~ , 914, 1 V
COLLEGE STATION
FOLDED COPIES OF PLAT FOR REVIEW
FINAL PLAT MINIMUM REQUIREMENTS
(ALL CITY ORDINANCES MUST BE MET)
INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
(Requirements based on field survey and marked by monuments and markers.)
® 1. Drawn on 24" x 36" sheet to scale of 100' per inch or larger.
® 2. Vicinity map which includes enough of surrounding area to show general location of subject
property in relationship to College Station and its City Limits. No scale required but include north
arrow.
® 3. Title Block with the following information:
® Name and address of subdivider, recorded owner, planner, engineer and surveyor.
® Proposed name of subdivision. (Subdivision name & street names will be approved
through Brazos County 911.) (Replats need to retain original subdivision name.)
® Date of preparation.
® Engineer's scale in feet.
® Total area intended to be developed.
® 4. North Arrow.
® 5. Subdivision boundary indicated by heavy lines.
® 6. If more than 1 sheet, an index sheet showing entire subdivision at a scale of 500 feet per inch or
larger.
® 7. All applicable certifications based on the type of final plat.
❑ Ownership and Dedication
❑ Surveyor and/or Engineer
❑ City Engineer (and City Planner, if a minor plat)
❑ Planning and Zoning Commission (delete if minor plat)
❑ Brazos County Clerk
❑ Brazos County Commissioners Court Approval (ETJ Plats only)
❑ 8. Paid tax certificates.
❑ 9. If submitting a replat where there are existing improvements, submit a survey of the subject
property showing the improvements to ensure that no encroachments will be created.
❑ 10. If using private septic systems, add a general note on the plat that no private sewage facility may
be installed on any lot in this subdivision without the issuance of a license by the Brazos County
Health Unit under the provisions of the private facility regulations adopted by the Commissioner's
Court of Brazos County, pursuant to the provisions of Section 21.004 of the Texas Water Code.
❑ 11. Location of the 100 Year Floodplain and floodway, if applicable, according to the most recent
available data.
® 12. Lot corner markers and survey monuments (by symbol) and clearly tied to basic survey data.
® 13. Matches the approved preliminary plat and/or master development plan.
area, center angle, degree of curvature, tangent distance and length of all curves for all of the
following: (Show existing items that are intersecting or contiguous with the boundary of or forming
a boundary with the subdivision, as well as, those within the subdivision).
Existing Proposed
❑ ❑ Streets. Continuous or end in a cul-de-sac, stubbed out streets must end into a temp
turn around unless they are shorter than 100 feet.
❑ ❑ Public and private R.O.W. locations and widths. (All existing and proposed R.O.W.'s
sufficient to meet Thoroughfare Plan.)
❑ ❑ Street offsets and/or intersection angles meet ordinance.
❑ ❑ Alleys.
❑ ❑ Easements.
❑ ❑ A number or letter to identify each lot or site and each block.
❑ ❑ Greenbelt area/park linkages/parkland dedication ( All proposed dedications must be
reviewed by the Parks and Recreation Board prior to P & Z Commission consideration.)
15. Construction documents for all public infrastructure drawn on 24" x 36" sheets and properly sealed
by a Licensed Texas Professional Engineer that include the following:
❑ Street, alley and sidewalk plans, profiles and sections. One sheet must show the overall
street, alley and/or sidewalk layout of the subdivision. (may be combined with other
utilities).
❑ Sanitary sewer plan and profile showing depth and grades. One sheet must show the
overall sewer layout of the subdivision. (Utilities of sufficient size/depth to meet the
utility master plan and any future growth areas.)
❑ Water line plan showing fire hydrants, valves, etc. with plan and profile lines showing
depth and grades. One sheet must show the overall water layout of the subdivision.
(Utilities of sufficient size/depth to meet the utility master plan and any future growth
areas.)
❑ Storm drainage system plan with contours, street profile, inlets, storm sewer and
drainage channels, with profiles and sections. Drainage and runoff areas, and runoff
based on 5, 10, 25, 50 and 100 year rain intensity. Detailed drainage structure design,
channel lining design & detention if used. One sheet must show the overall drainage
layout of the subdivision.
❑ Detailed cost estimates for all public infrastructure listed above sealed by Texas P.E.
❑ Drainage Report.
❑ Erosion Control Plan (must be included in construction plans).
❑ 16. All off-site easements necessary for infrastructure construction must be shown on the final plat
with a volume and page listed to indicate where the separate instrument easements were filed.
Separate instrument easements must be filed prior or concurrently with Final Plat.
❑ 17. Are there impact fees associated with this development? ❑ Yes ❑ No
Impact fees for R-1, R-2, & R-3 zoned final plats, must be paid prior to filing.
® 18. Will any construction occur in TexDOT rights-of-way? ❑ Yes ® No
If yes, TexDOT permit must be submitted along with the construction documents.
NOTE:
1. We will be requesting the corrected Final Plat to be submitted in digital form if available prior to
filing the plat at the Courthouse.
2. If the construction area is greater than 5 acres, EPA Notice of Intent (NOI) must be submitted prior
to issuance of a development permit.