Loading...
HomeMy WebLinkAboutStaff Review Comments l'r GUU4 10.11 n i :++JV:avua 1 raw.; a ul J . W riCt.11) 1 11 :3 O ■ oi l CITY OF COLLEGE STA TION , I I (11/I DEVELOPMENT SERVICES J 2 1101 Texas Avenue South, PO Box 9960 (L _� College Station, Texas 77842 l-J- `'" ` t S I V I O R Phone 979.764.3570 I Fax 979.764.3496 MEMORANDUM March 4, 2004 TO: Robert L. Payne, Jr., Via fax 696.8114 FROM: Bridgette George, Assistant Development Manager SUBJECT: DELTA ZETA SORORITY HOUSE (SP) - Site Plan Staff reviewed the above- mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: WI' $600 Inspection fee for the fire line; . -' One (1) complete set of revised construction documents for the proposed development; and Fij Easement Dedication Sheet and required documents. Please note that the Easement Dedication Sheet and the necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Delta Zeta National Housing Corp., 202 East Church St., Oxford, OH. 45056 Case file #04- 00500063 Horne of Texas A&M Uuiuersity i Its:11 Verna -. y /9b9bt31t4 Page 3 of 3 STAFF REVIEW COMMENTS NO. 1 Project: DELTA ZETA SORORITY HOUSE (SP) - 04- 00500063 PLANNING 1. Provide a general note that all roof and ground - mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right - of -way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. Reviewed by: Jennifer Prochazska Date: March 3, 2004 ENGINEERING 1. Engineered construction documents for the Fire Line are required. Be aware that new Design Standards for water were recently adopted_ 2. The minimum PUE width for a water line is 15 feet. 3. The PUE for the Fire Line must be in place prior to Site Plan approval_ 4. No structures are allowed within a PUE. Please stop the PUE for the Fire Line before the porch_ 5. Provide water demands for domestic and irrigation. 6. Show location of irrigation meter_ It must also be located within a PUE or ROW. Reviewed by: Carol Cotter Date: March 3, 2004 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer provides digital AutoCAD 2000 version of plat and /or site plan. email to rbolin @cstx.gov 4. Developer provides load data for project. 5. Developer provides temporary blanket easement for construction purposes. 6. Developer provides easements for electric infrastructure as installed for electric lines. 7. Any change in electrical service, contact CSU_ Reviewed by: Ronnie Bolin Date: 3-4 -04 NOTE Any doors node to the phaes. that hem not been requested by the QTy of college Soon roost be eIrtnined in your Red trensmitei toter and tubbed' on your plans_ My addition& charges on these plans that tease not been poir(ed out to the Cty, will =IOU* a convietely new nMew. P a g e 2of R.L. Payne & Associates, Inc. Architecture, Planning, Interior Design & Graphics Memo To: City of College Station Development Services From: Michael Campbell CC: [Click here and type name] Date: March 12, 2004 Re: DELTA ZETA SORORITY HOUSE [SP] — Site Plan 1._600 Inspection Fee for the fire line 2. Easement dedication Sheet and required documents 1. The inspection fee will be submitted by Steve Rians of S.A.F.E. Inc. 2. Steve Rians discussed with Carol Cotter the design of the fire line. The fire line will connect on the discharge side of the proposed water meter and therefore would not require an easement. If his design is unable to meet these constraints, a 15' PUE will be in place as shown on the drawings and the required documents (as noted on the the easement dedication sheet) will be submitted to the City of College Station Development Services. 1 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM March 4, 2004 TO: Robert L. Payne, Jr., Via fax 696.8114 \/ FROM: Bridgette George, Assistant Development Manager SUBJECT: DELTA ZETA SORORITY HOUSE (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: $600 Inspection fee for the fire line; One (1) complete set of revised construction documents for the proposed development; and Easement Dedication Sheet and required documents. Please note that the Easement Dedication Sheet and the necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Delta Zeta National Housing Corp., 202 East Church St., Oxford, OH, 45056 Case file #04- 00500063 Horne of Texas A &M University STAFF REVIEW COMMENTS NO. 1 Project: DELTA ZETA SORORITY HOUSE (SP) — 04- 00500063 PLANNING 1. Provide a general note that all roof and ground- mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right - of -way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. Reviewed by: Jennifer Prochazska Date: March 3, 2004 ENGINEERING 1. Engineered construction documents for the Fire Line are required. Be aware that new Design Standards for water were recently adopted. 2. The minimum PUE width for a water line is 15 feet. 3. The PUE for the Fire Line must be in place prior to Site Plan approval. 4. No structures are allowed within a PUE. Please stop the PUE for the Fire Line before the porch. 5. Provide water demands for domestic and irrigation. 6. Show location of irrigation meter. It must also be located within a PUE or ROW. Reviewed by: Carol Cotter Date: March 3, 2004 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer provides digital AutoCAD 2000 version of plat and /or site plan. email to rbolinna cstx.gov 4. Developer provides Toad data for project. 5. Developer provides temporary blanket easement for construction purposes. 6. Developer provides easements for electric infrastructure as installed for electric lines. 7. Any change in electrical service, contact CSU. Reviewed by: Ronnie Bolin Date: 3 -4 -04 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 2