Loading...
HomeMy WebLinkAboutCOST ESTIMATE ENGINEER'S ESTIMATE LOTS 1-2 HENTON SUBDIVISION, LOT 2 ONE LINCOLN PLACE WATER LINE, SANITARY SEWER LINE & STORM SEWER IMPROVEMENTS MAY 06, 2003 ITEM 1 EST. 1 UNIT PRICE IN ITEM DESCRIPTION & PRICE IN WORDS NO, QTY. UN1T FIGURES IN TOTAL PRICE GURES..... INCIDENTALS 29 1 LS Provide Construction Staking to include Layout, Cut/Fill and all other forms of surveying services necessary to complete the Work. Layout Cut/Fill staking and calculation must be conducted under the authority of and certified by a Registered Professional Surveyor or Engineer complete for Dollars $6,000.00 $6,000.00 and Cents per lump sum. 30 1 LS Furnish and Install all necessary Barricades, Signs and Traffic Control Devices complete and in place for Dollars $500.00 $500.00 and Cents per lump sum. 31 34 LF Furnish and Install GTE 2 -4" Schedule #40 PVC Conduit complete and in place for Dollars $6.00 $204.00 and Cents per linear foot. 32 34 LF Furnish and Install Electrical 2 -4" Gray Scedule #40 PVC Conduit © 4' min. bury from finished grade with pull string tied at both ends of conduit and capped and a 6" wide "CAUTION" tape placed at least 2' above top of conduit complete and in place for Dollars $6.00 $204.00 and Cents per linear foot. 33 34 LF Furnish and Install TCA 2 -2" Schedule #40 PVC Conduit complete and in place for Dollars $6.00 $204.00 and Cents per linear foot. 34 27 EA Install Street Light furnished by owner complete and in place for Dollars $150.00 $4,050.00 and Cents each. Furnish and Install Erosion & Sediment Control Devices, Hydromulch, Seeding, Sodding as shown on Plan Sheets U -1 35 1 LS and DT -1 complete and in place for Dollars $12,000.00 $12,000.00 and Cents lump sum. INCIDENTALS - SUB -TOTAL 4: Items (29 -35) $23,162.00 ENGINEER'S ESTIMATE LOTS 1 -2 HENTON SUBDIVISION, LOT 2 ONE LINCOLN PLACE WATER LINE, SANITARY SEWER LINE & STORM SEWER IMPROVEMENTS 114,0106 2003 ITEM QTY. UNIT ITEM DESCRIPTION & PRICE IN WORDS I UN FIGURES I IN TOTAL IN FIGURES E SANITARY SEWER LINE 24 900 LF Furnish and Install 8" PVC Sanitary Sewer Main (SDR 26, ASTM 3034, CLASS 160) — Standard Depth— 7' -9' Bury complete and in place for Dollars $34.00 $30,600.00 and Cents per linear foot. 25 2 EA Furnish and Install Standard City of College Station Manhole — Standard Depth— 8' -9' complete and in place for Dollars $2,500.00 $5,000.00 and Cents per each. 26 1 LF Furnish and Install Standard City of College Station Manhole —Extra Depth— 12' complete and in place for Dollars $4,500.00 $4,500.00 and Cents per linear foot. 27 1 EA Tie 8" Sanitary Sewer Main to Existing Manhole with drop connection complete and in place for Dollars $800.00 $800.00 and Cents per each. Furnish and Install Sanitary Sewer Line Trench Safety (8' ave. 28 900 LF depth) complete and in place for Dollars $1.50 $1,350.00 and Cents per linear foot. SANITARY SEWER LINE - SUB -TOTAL 3: $42,250.00 Items (24 -28) ENGINEER'S ESTIMATE LOTS 1 -2 HENTON SUBDIVISION, LOT 2 ONE LINCOLN PLACE WATER LINE, SANITARY SEWER LINE & STORM SEWER IMPROVEMENTS MAY 06, 2003 ITEM EST. f PRICE IN WORDS 1 UNTI I F E NO; QTY. ' 14 3 EA Furnish and Install 12" M.J. 11 1/4 deg. BEND to include all necessary thrust blocking complete and in place for Dollars $1,100.00 $3,300.00 and Cents per each. 15 1 EA Furnish and Install 12" Tapping Sleeve and Valve for Wet Connection complete and in place for Dollars $4,000.00 $4,000.00 and Cents per each. 16 2 EA Furnish and Install Std. City of College Station Fire Hydrant w /appurtenances including all necessary tees, valves and blocking complete and in place for Dollars $2,300.00 $4,600.00 and Cents per each. 17 4 EA Furnish and Install 12" Gate Valve and Valve Box complete and in place for Dollars $2,000.00 $8,000.00 and Cents per each. 18 2 EA Furnish and Install 8" Gate Valve and Valve Box complete and in place for Dollars $1,500.00 $3,000.00 and Cents per each. 19 1 EA Furnish and Install 2" Blow -off Valve complete and in place for Dollars $450.00 $450.00 and Cents per each. Furnish and Install 12" M.J. Plug to include all necessary thrust 20 3 EA blocking complete and in place for Dollars $100.00 $300.00 and Cents per each. Furnish and Install 8" M.J. Plug to include all necessary thrust 21 2 EA blocking complete and in place for Dollars $100.00 $200.00 and Cents per each. Connect to existing 12" waterline at existing valve located at 22 1 EA "The Veranda" complete and in place for Dollars $500.00 $500.00 and Cents per each. ENGINEER'S ESTIMATE LOTS 1-2 HENTON SUBDIVISION, LOT 2 ONE LINCOLN PLACE WATER LINE, SANITARY SEWER LINE at STORM SEWER IMPROVEMENTS MAY 06 2003 Furnish and Install waterline Trench Safety (7' max depth) 23 1220 LF complete and in place for Dollars $1.50 $1,830.00 and Cents per linear foot. WATER LINE - SUB -TOTAL 2 $82,970.00 Items(6 -23 ) ENGINEER'S ESTIMATE LOT$ 1 -2 HENTON SUBDIVISION, LOT 2 ONE LINCOLN PLACE WATER LINE, SANITARY SEWER LINE & STORM SEWER IMPROVEMENTS MAY 06, 2003 I NO QTY. UNIT ITEM DESCRIPTION & PRICE IN WORDS UNIT G R I N 1 IN FIGUR S WATER LINE Furnish and Install 12" PVC Water Main (AWWA C -900, DR 14, Pressure Class 200) — Standard Depth— 4' -6' Bury complete and 6 1110 LF in place for Dollars $34.00 $37,740.00 and Cents per linear foot. Furnish and Install 8" PVC Water Main (AWWA C -900, DR 14, Pressure Class 200) — Standard Depth— 4' -6' Bury complete and 7 110 LF in place for Dollars $25.00 $2,750.00 and Cents per linear foot. 8 30 LF Furnish and Install Bore with 18" dia. 3/8" thick Steel Casing coated inside and out w/ tar based mastic complete and in place for Dollars $50.00 $1,500.00 and Cents per linear foot. 9 5 EA Furnish and Install 12" M.J. 22 -1/2 Bend to include all necessary thrust blocking complete and in place for Dollars $1,100.00 $5,500.00 and Cents per each. 10 4 EA Furnish and Install 12" M.J. 45 Bend to include all necessary thrust blocking complete and in place for Dollars $1,100.00 $4,400.00 and Cents per each. 11 1 EA Furnish and Install 12" x 12" M.J. Tee to include all necessary thrust blocking complete and in place for Dollars $1,800.00 $1,800.00 and Cents per each. 12 1 EA Furnish and Install 12" x 8" M.J. Tee to include all necessary thrust blocking complete and in place for Dollars $1,100.00 $1,100.00 and Cents per each. 13 1 EA Furnish and Install 12 "x12" M.J. Cross to include all necessary thrust blocking complete and in place for Dollars $2,000.00 $2,000.00 and Cents per each. ENGINEER'S ESTIMATE LOTS 1-2 MENTON SUBDIVISION, LOT 2 ONE LINCOLN PLACE WATER LINE, SANITARY SEWER LINE & STORM SEWER IMPROVEMENTS MAY 06, 2003 ITEM 1 QTY. UNIT ITEM DESCRIPTION & PRICE IN WORDS I UN GURES IN ',) IN� FIG URES STORM SEWER 1 64 LF Furnish and Install 24" R.C.P. Storm Sewer Main complete and in place for Dollars $42.00 $2,688.00 and Cents per lineal foot. 2 249 LF Furnish and Install 48" R.C.P. Storm Sewer Main complete and in place for Dollars $77.00 $19,173.00 and Cents per linear foot. 3 3 EA Furnish and Install 5'x5' Grate Inlet Box for V- section drain complete with grate —Extra Depth— 8' -9' complete and in place for Dollars $6,000.00 $18,000.00 and Cents each. Furnish and Install 50' of 8' high Reinforced Concrete Headwall 4 1 EA & Wingwalls complete and in place for Dollars $8,000.00 $8,000.00 and Cents per each. 5 50 LF Furnish and Install Railing on top of Headwall complete and in place for Dollars $50.00 $2,500.00 and Cents per each. STORM SEWER - SUB -TOTAL 1: $50,361.00 ITEMS (1 -5) ENGINEER'S! ESTIMATE LOTS 1 -2 HENTON SUBDIVISION, LOT 2 ONE LINCOLN PLACE WATER LINE, SANITARY SEWER LINE & STORM SEWER IMPROVEMENTS MAY 06, 2003 SUMMARY TABULATION TOTAL CONSTRUCTION COSTS: (Sub - Totals 1-4) $198,743.00 15% CONTINGENCY: $29,811.45 GRAND TOTAL: $228,554.45 ENGINEER'S ESTIMATE FOR REPLAT OF LOTS 1 -2 HENTON SUBDIVISION, LOT 2 ONE LINCOLN PLACE 12" WATER LINE & 8" SANITARY SEWER LINE MAY 19 2003 ITEM EST. ITEM DESCRIPTION & PRICE IN WORDS UNIT PRICE IN TOTAL PRICE NO. QTY. UNIT FIGURES ) IN FIGURES 1 WATER LINE Furnish and Install 12" PVC Water Main (AWWA C -900, DR 1 357 LF 14, Pressure Class 200) 6' -8' Bury complete and in place for Dollars $34.00 $12,138.00 and Cents per linear foot. Furnish and Install 8" PVC Water Main (AWWA C -900, DR 14, 2 380 LF Pressure Class 200) 6' Bury complete and in place for Dollars $25.00 $9,500.00 and Cents per linear foot. 3 6 EA Furnish and Install 12" M.J. 22 -1/2 Bend to include all necessary thrust blocking complete and in place for Dollars $750.00 $4,500.00 and Cents per each. 4 1 EA Furnish and Install 12" x 8" M.J. Tee to include all necessary thrust blocking complete and in place for Dollars $750.00 $750.00 and Cents per each. 5 1 EA Furnish and Install 12"x8" M.J. Cross to include all necessary thrust blocking complete and in place for Dollars $900.00 $900.00 and Cents per each. 6 2 EA Furnish and Install Std. City of College Station Fire Hydrant w /appurtenances including all necessary tees, valves and blocking complete and in place for Dollars $2,300.00 $4,600.00 and Cents per each. 7 1 EA Furnish and Install 12" Gate Valve and Valve Box complete and in place for Dollars $1,500.00 $1,500.00 and Cents per each. 8 2 EA Furnish and Install 8" Gate Valve and Valve Box complete and in place for Dollars $800.00 $1,600.00 and Cents per each. 9 2 EA Furnish and Install 2" Blow -off Valve complete and in place for Dollars $450.00 $900.00 and Cents per each. T- -- ENGINEER'S ESTIMATE FOR.REPLAT OF LOTS 1 [ 2 HENTOAI SUBDIVISION; LOT 2 ONE LINCOLN PLACE 12" WATER LINE & 8" SANITARY S EWER LINE MAY 19, 2003 ITEM I ES7 I I NQ. QTY. UNIT ITEM DESCRIPTION & PRICE IN WORDS UNI FIGURES IN i IN Fumish and Install 8" M.J. Plug to include all necessary thrust 10 3 EA blocking complete and in place for Dollars $225.00 $675.00 and Cents per each. Connect to existing 12" waterline at existing valve located at 11 1 EA "The Veranda" complete and in place for Dollars $500.00 $500.00 and Cents per each. Furnish and Install waterline Trench Safety (8' max depth) 12 737 LF complete and in place for Dollars $1.50 $1,105.50 and Cents per linear foot. WATER LINE - SUB -TOTAL 1 $38,668.50 Items(1 -12) • ESTIMATE FOR REPEAT OF LOTS 1 -2 HENTON SUBDIVISION, LOT 2 ONE LINCOLN PLACE 12 " WATER LINE & 8" SANITARY SEWER LINE MAY 19, 2003 ITEM EST: 1 UNIT PRICE IN TOTAL PRICE ITEM DESCRIPTION & PRICE IN WORDS NO. QTY UNIT IN FIGURES SANITARY SEWER LINE 13 654 LF Fumish and Install 8" PVC Sanitary Sewer Main (SDR 26, ASTM 3034, CLASS 160) — 7' -9' Bury complete and in place for Dollars $34.00 $22,236.00 and Cents per linear foot. 14 1 EA Furnish and Install Standard City of College Station Manhole —8' -9' depth complete and in place for Dollars $2,500.00 $2,500.00 and Cents per each. 15 2 LF Furnish and Install Standard City of College Station Manhole —10' 12' depth complete and in place $4,500.00 $9,000.00 and Cents per linear foot. 16 1 EA Tie 8" Sanitary Sewer Main to Existing Manhole with drop connection complete and in place for Dollars $1,650.00 $1,650.00 and Cents per each. Fumish and Install Sanitary Sewer Line Trench Safety (8' ave. 17 654 LF depth) complete and in place for Dollars $1.50 $981.00 and Cents per linear foot. Fumish and Install 8" plug & mark end of line at surface w/ 2" 18 2 EA PVC painted green extending 4' above ground for Dollars $200.00 $400.00 and Cents per linear foot. SANITARY SEWER LINE - SUB -TOTAL 2 $36,767.00 Items (13 -18) ENGINEER'S ESTIMATE FOB fEPLAT 0 LOTS 1 2 HEN. TQN SUBDIVISION, LOT 2 ONE IINOQLN PLAOE 12" WATER LIN & 8" SAN TAR f SE 11E1 LINE ITEM EST :.:::`::':::::`: '::''::':` T PRICE IN TOTAL PRICE ::: .::.....:.::.:::....: >;;; UM :;:...... ITEM QESCRIPTION & PRICE IN WORI75R : : ` :< : : ;:: :'' > NO. QTY.. _;UNIT . :..:.;::::.:::. F1GtlRES :;: .. IN FIGURES INCIDENTALS 19 1 LS Provide Construction Staking to include Layout, Cut/Fill and all other forms of surveying services necessary to complete the Work. Layout Cut/Fill staking and calculation must be conducted under the authority of and certified by a Registered Professional Surveyor or Engineer complete for Dollars $6,000.00 $6,000.00 and Cents per lump sum. 20 1 LS Fumish and Install all necessary Barricades, Signs and Traffic Control Devices complete and in place for Dollars $500.00 $500.00 and Cents per lump sum. Fumish and Install Erosion & Sediment Control Devices, Hydromulch, Seeding, Sodding as shown on Plan Sheets U -1 21 1 LS and DT -1 complete and in place for Dollars $12,000.00 $12,000.00 and Cents lump sum. • • • INCIDENTALS - SUB TOTAL 3: Items (19 -21) $18,500.00 ENGINEER'S ESTIMATE FOR REPLAT OF LOTS 1 -2 HENTON SUBDIVISION, LOT 2 ONE LINCOLN PLACE 12" WATER LINE & 8" SANITARY SEWER LINE MAY 19, 2003 ITEM I SST 1 1 ITEM DESCRIPTION & PRICE IN WORDS UNIT PRICE IN TOTAL PRICE NO. QTY. J UNIT FIGURES IN FIGURES SUMMARY TABULATION TOTAL CONSTRUCTION COSTS: (Sub- Totals 1 -3) $93,935.50 15% CONTINGENCY: $14,090.33 GRAND TOTAL: $108,025.83 ENGINEER'S ESTIMA7I: FOR REPEAT OF LOTS 1 2 HENTOAI SUBQNISION, LOT 2 ONE #,.N+COLN PLACE '12" WATER LINE & 8" SANITARY SEWER UNE ITEM EST. I 1 ITE DESCRIPTION 8 PRIG IN WO 1T PRICE 1111 TOTAL pRIC� NO. I QTY. UNIT GORES IN FIGURES WATER LINE Furnish and Install 12" PVC Water Main (AWWA C -900, DR 1 357 LF 14, Pressure Class 200) 6' -8' Bury complete and in place for Dollars $34.00 $12,138.00 and Cents per linear foot. Furnish and Install 8" PVC Water Main (AWWA C -900, DR 14, 2 380 LF Pressure Class 200) 6' Bury complete and in place for Dollars $25.00 $9,500.00 and Cents per linear foot. 3 6 EA Furnish and Install 12" M.J. 22 -1/2 Bend to include all necessary thrust blocking complete and in place for Dollars $750.00 $4,500.00 and Cents per each. 4 1 EA Fumish and Install 12" x 8" M.J. Tee to include all necessary thrust blocking complete and in place for Dollars $750.00 $750.00 and Cents per each. 5 1 EA Furnish and Install 12 "x8" M.J. Cross to include all necessary thrust blocking complete and in place for Dollars $900.00 $900.00 and Cents per each. 6 2 EA Furnish and Install Std. City of College Station Fire Hydrant w /appurtenances including all necessary tees, valves and blocking complete and in place for Dollars $2,300.00 $4,600.00 and Cents per each. 7 1 EA Furnish and Install 12" Gate Valve and Valve Box complete and in place for Dollars $1,500.00 $1,500.00 and Cents per each. 8 2 EA Furnish and Install 8" Gate Valve and Valve Box complete and in place for Dollars $800.00 $1,600.00 and Cents per each. 9 2 EA Furnish and Install 2" Blow -off Valve complete and in place for Dollars $450.00 $900.00 and Cents per each. ENGINEER'S ESTIMATE FOR REPLAT OF LOTS 1 -2 HENTON SUBDIVISION LOT 2 ONE LINCOLN PLACE 12" WATERLINE & 8" SANITARY SEWER LINE MAY 19, 2003 " ITEM EST. 1 1 ITEM DESCRIPTION & PRICE IN WORDS • NO. QTY. UNIT UNIT FIGURES IN IN FIGURES Furnish and Install 8" M.J. Plug to include all necessary thrust 10 3 EA blocking complete and in place for Dollars $225.00 $675.00 and Cents per each. Connect to existing 12" waterline at existing valve located at 11 1 EA "The Veranda" complete and in place for Dollars $500.00 $500.00 and Cents per each. Furnish and Install waterline Trench Safety (8' max depth) 12 737 LF complete and in place for Dollars $1.50 $1,105.50 and Cents per linear foot. WATER LINE - SUB -TOTAL 1 $38,668.50 Items(1 -12) ENG.INEER'S ESTIMATE: FOIE REPEAT: Ol* : <... . • LOT '1 -2 HE SUBDNlSION, LOT 2 ONE L INCQLN PLA;GE • • '12" WATER LINE & 8" SANITARY SEWE1 LINE ITEM ES7. I ! ITEM DESCRIPTION & PRICE IN WORDS P G R IN IN FI GURE$ E '' • NO. QTY. UNIT SANITARY SEWER LINE 13 654 LF Furnish and Install 8" PVC Sanitary Sewer Main (SDR 26, ASTM 3034, CLASS 160) — 7' -9' Bury complete and in place for Dollars $34.00 $22,236.00 and Cents per linear foot. 14 1 EA Furnish and Install Standard City of College Station Manhole —8'-9' depth complete and in place for Dollars $2,500.00 $2,500.00 and Cents per each. 15 2 LF Furnish and Install Standard City of College Station Manhole —10' 12' depth complete and in place $4,500.00 $9,000.00 and Cents per linear foot. 16 1 EA Tie 8" Sanitary Sewer Main to Existing Manhole with drop connection complete and in place for Dollars $1,650.00 $1,650.00 and Cents per each. Fumish and Install Sanitary Sewer Line Trench Safety (8' ave. 17 654 LF depth) complete and in place for Dollars $1.50 $981.00 and Cents per linear foot. Furnish and Install 8" plug & mark end of line at surface w/ 2" 18 2 EA PVC painted green extending 4' above ground for Dollars $200.00 $400.00 and Cents per linear foot. SANITARY SEWER LINE - SUB -TOTAL 2 $36,767.00 Items (13 -18) ENGINEER'S ESTIMA ..E. I EPLAT OF LOTS 1 -2 HENTON SUB DIVISION, LOT ONE I NC LN PLACE '12" WATERLINE! 8" SANITARY SEWER L ITE OTA ES T PR fCE ITEM DESCRIPTfON &PRICE 1N WORDS INCIDENTALS 19 1 LS Provide Construction Staking to include Layout, Cut/Fill and all other forms of surveying services necessary to complete the Work. Layout Cut/Fill staking and calculation must be conducted under the authority of and certified by a Registered Professional Surveyor or Engineer complete • for Dollars $6,000.00 $6,000.00 and Cents per lump sum. 20 1 LS Fumish and Install all necessary Barricades, Signs and Traffic Control Devices complete and in place for Dollars $500.00 $500.00 and Cents per lump sum. Fumish and Install Erosion & Sediment Control Devices, Hydromulch, Seeding, Sodding as shown on Plan Sheets U -1 21 1 LS and DT -1 complete and in place for Dollars $12,000.00 $12,000.00 and Cents lump sum. • • • INCIDENTALS - SUB -TOTAL 3: Items (19 -21) $18,500.00 ENGINEER'S ESTIMATE F01 REPEAT OF LOTS 1 2 HENTON SUBDIVISION, LOT 2 ONE LINCOLN PLACE 12" WATER LINE & 8" SANITARY SEWER. LINE MAY 19, 2003 . I NOM QTY. I UNIT ITEM DESCRIPTION & PRICE IN W ORDS GUISES IN IN F GORES SUMMARY TABULATION TOTAL CONSTRUCTION COSTS: (Sub- Totals 1-3) $93,935.50 15% CONTINGENCY: $14,090.33 GRAND TOTAL: $108,025.83 ENGINEER'S ESTIMATE OIL I�EPLAT LOTS 14 HENTON[ SUBD1VISION LOT 2 ONE LINCOLN PLACE 12" WATER L1NE & 8 SANITARY SEWER LINE MAY 1 ITEM 1 EST ITEM DESCRIPTION & PRICE IN 1NQRDS UNIT PRICE IN TOTAL PRICE NO. QTY. I UNIT . . FIGURES IN FIGURES WATER LINE Furnish and Install 12" PVC Water Main (AWWA C -900, DR 1 357 LF 14, Pressure Class 200) 6' -8' Bury complete and in place for Dollars $34.00 $12,138.00 and Cents per linear foot. Furnish and Install 8" PVC Water Main (AWWA C -900, DR 14, 2 380 LF Pressure Class 200) 6' Bury complete and in place for Dollars $25.00 $9,500.00 and Cents per linear foot. 3 6 EA Fumish and Install 12" M.J. 22 -1/2 Bend to include all necessary thrust blocking complete and in place for Dollars $750.00 $4,500.00 and Cents per each. 4 1 EA Fumish and Install 12" x 8" M.J. Tee to include all necessary thrust blocking complete and in place for Dollars $750.00 $750.00 and Cents per each. 5 1 EA Furnish and Install 12"x8" M.J. Cross to include all necessary thrust blocking complete and in place for Dollars $900.00 $900.00 and Cents per each. 6 2 EA Furnish and Install Std. City of College Station Fire Hydrant w /appurtenances including all necessary tees, valves and blocking complete and in place for Dollars $2,300.00 $4,600.00 and Cents per each. 7 1 EA Furnish and Install 12" Gate Valve and Valve Box complete and in place for Dollars $1,500.00 $1,500.00 and Cents per each. 8 2 EA Furnish and Install 8" Gate Valve and Valve Box complete and in place for Dollars $800.00 $1,600.00 and Cents per each. 9 2 EA Furnish and Install 2" Blow -off Valve complete and in place for Dollars $450.00 $900.00 and Cents per each. ENGINEER'S ESTIMATE FOR RERLA:O::: LOTS 'I 2. HENTON SUBDIVISION, LOT 2 ONE LINCOLN PLACE 92" WATER LINE & 8" SANITIRY SEWER LINE MAY 19, 20 ITEM EST... ITEM DESCRIPTION & PRICE IN WORDS U GlRICE IN �. IN F URES G NO. QTY. UNIT Furnish and Install 8" M.J. Plug to include all necessary thrust 10 3 EA blocking complete and in place for Dollars $225.00 $675.00 and Cents per each. Connect to existing 12" waterline at existing valve located at 11 1 EA "The Veranda" complete and in place for Dollars $500.00 $500.00 and Cents per each. Furnish and Install waterline Trench Safety (8' max depth) 12 737 LF complete and in place for Dollars $1.50 $1,105.50 and Cents per linear foot. WATER LINE - SUB -TOTAL 1 $38,668.50 Items(1 -12) ENG'INEER'S ES:7IMATE FOR REPEAT::: F LOTS 1[ 2 iH ENTON SUBDN[S�ON, LOT 2 ONE LI NCOLN PLACE '12" WATERLINE 8" SANITARY SEWER LINE MAY 19. 200 I NO. QTY. I UNIT ITEM DESCRIPTION & PRICE IN WORD FIGURES IN IN F SANITARY SEWER LINE 13 654 LF Furnish and Install 8" PVC Sanitary Sewer Main (SDR 26, ASTM 3034, CLASS 160) — 7' -9' Bury complete and in place for Dollars $34.00 $22,236.00 and Cents per linear foot. • 14 1 EA Furnish and Install Standard City of College Station Manhole —8' -9' depth complete and in place for Dollars $2,500.00 $2,500.00 and Cents per each. 15 2 LF Furnish and Install Standard City of College Station Manhole —10' 12' depth complete and in place $4,500.00 $9,000.00 and Cents per linear foot. 16 1 EA Tie 8" Sanitary Sewer Main to Existing Manhole with drop connection complete and in place for Dollars $1,650.00 $1,650.00 and Cents per each. Furnish and Install Sanitary Sewer Line Trench Safety (8' ave. 17 654 LF depth) complete and in place for Dollars $1.50 $981.00 and Cents per linear foot. Fumish and Install 8" plug & mark end of line at surface w/ 2" 18 2 EA PVC painted green extending 4' above ground for Dollars $200.00 $400.00 and Cents per linear foot. SANITARY SEWER LINE - SUB -TOTAL 2 $36,767.00 Items (13 -18) I ENGINEER'S ESTIMATE FOR REPLAY 0� LOTS '[ 2 HENTQI�1 SUBDIVISION, LOT 2 ONE NCOLN PLACE ; 1.2" WATERLINE & 8 ":SANITARY SEWER UNE MAY 19► 2003 ITEM EST UNIT PRICE IN TOTAL PRICE ITEM DESCRIPTION & PRICE IN WORDS NQ.. ..QTY.. UNIT _ _ FIGURES IN FIGURES INCIDENTALS 19 1 LS Provide Construction Staking to include Layout, Cut/FII and all other forms of surveying services necessary to complete the Work. Layout Cut/Fill staking and calculation must be conducted under the authority of and certified by a Registered Professional Surveyor or Engineer complete for Dollars $6,000.00 $6,000.00 and Cents per lump sum. 20 1 LS Fumish and Install all necessary Barricades, Signs and Traffic Control Devices complete and in place for Dollars $500.00 $500.00 and Cents per lump sum. Fumish and Install Erosion & Sediment Control Devices, Hydromulch, Seeding, Sodding as shown on Plan Sheets U -1 21 1 LS and DT -1 complete and in place for Dollars $12,000.00 $12,000.00 and Cents lump sum. • • INCIDENTALS - SUB -TOTAL 3: Items (19 -21) $18,500.00 i ENGINEER'S ESTIMATE FOR REONE PEAT OF LOTS 1- 2 'ON SUBDIVISION L 2 LIN N LAE 12" WATER LINE & VI 8" SANITARY SEWER LINE HENT MAY 19, 2003 ITEM EST. ITEM DESCRIPTION & PRICE IN WORDS U P PRI IN TOTAL PRICE NO: QTY. I UNIT FIG C RES IN FIGURES SUMMARY TABULATION TOTAL CONSTRUCTION (Sub- Totals COSTS: 1-3) $93,935.50 15% CONTINGENCY: $14,090.33 GRAND TOTAL: $108,025.83