Loading...
HomeMy WebLinkAboutStaff Comments CITY OF COLLEGE STATION C 1 DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 COLLEGE STATION Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM March 4, 2004 TO: Phyllis Hobson, Via fax 846.0652 FROM: Bridgette George, Assistant Development Manager SUBJECT: SOUTH HAMPTON (MPP) — Master Preliminary Plat Staff reviewed the above - mentioned master preliminary plat as requested but had to stop review. The following page is a preliminary list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information to be scheduled for a future Planning & Zoning Commission meeting: Two (2) revised copies of the Master Preliminary Plat If you have any questions or need additional information, please call Spencer Thompson or myself at 764 -3570. Attachments: Staff review comments cc: Joe Schultz, P.E., Texcon, Via fax 979.764.7759 1 Case file #04- 00500055 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 1 Project: SOUTH HAMPTON (MPP) - 04- 00500055 ENGINEERING 1. As it has been determined that the PDD zoning has expired for Phases 2, 3, and 4, this is a stop review for these phases, therefore, only a few comments are provided below. 2. Please note, a portion of this property has previously been platted. Therefore, the title block should reflect a replat of Nantucket Phase 2 Block 14, Lots 1 and 2. When this comes in for a Final Plat, please note as replat and provide any associated deed restrictions. A public hearing will be required. Also, there were platted easements associated with that plat. Please show on plat. Please note whether you are proposing to abandon these easements or not. 3. As shown, Lot 4 Block 5 is undevelopable. 4. Please remember, the City has adopted new engineering design criteria. All infrastructure is required to comply. See required easements for water and wastewater lines. 5. If easement abandonment is proposed, please consider early on in process. 6. Is stormwater detention proposed? 7. Why is the easement on the rear of Phase 7 shown as "public ". An improved channel that meets all requirements is acceptable as public. However, the downstream portion of the drainage way does not appear to be improved. 8. If fire hydrant coverage does not exist across Nantucket Drive it may be necessary to extend the water line to the Sand Dollar Cove intersection. 9. Please show service lines from water main across Sand Dollar Cove to Phase 7. City data shows the existing CCN is the southwest edge of ROW. No meters will be set on these service lines until all CCN disputes are resolved. 10. Show proposed lay out of public water to serve Phase 7. 11.It appears Phase 7 can go through with platting when rezoning is approved and all comments addressed. Show this phase on pre -plat. Reviewed by: Spencer Thompson Date: February 26, 2004 PLANNING Upon further research after the Pre - Application Conference, staff has discovered that the previous PDD zoning, approved in December 1997, has expired. According to City Ordinance, the property has reverted back to its previous zoning, A -O Agricultural Open. An amendment to the PDD ordinance was approved in August 2001 that placed an expiration date of 24 months on all PDDs. The PDD zoning expired in August of 2003. The section of South Hampton that is already platted is still zoned PDD. NOTE: Any changes made to the plans, that have not been requested by the City of College 9 p q y y Co ege Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 3 In order to plat lots smaller than the 5 -acre minimum required by A -O, rezoning will be required. The zoning request must go before the Planning and Zoning Commission for recommendation and the City Council for final approval. Once a PDD zoning is approved by the City Council, a concept plan of the development would go before the Design Review Board for approval. Once the concept plan is approved, you may plat the property in compliance with that plan. Since the plat has expired and the concerns about connectivity have become more and more of an issue, staff anticipates that the DRB will look for another connection to the larger subdivision. Access points are currently only shown to the frontage road. This may be problematic for emergency access as the frontage roads change to one way. Reviewed by: Jennifer Prochazka Date: March 2, 2004 ELECTRICAL These comments are provided for informational purposes only and are not required to appear on plat as such. 1. Developer installs conduit as per city specs and design. 2. Developer provides 30' of rigid conduit for riser pole(s). Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design. (pull boxes provided by the city). 5. Developer provides digital AutoCAD 2002 version of plat and /or site plan. Email to rbolin @cstx.gov. 6. Developer provides load data for project. 7. Developer installs street lighting per city specs and design. 8. Developer provides temporary blanket easement for construction purposes. 9. Developer provides easements for electric infrastructure as installed for electric lines (including street lighting). 10. Part of the subdivision is outside College Station Electric's service territory. Reviewed by: Ronnie Bolin Date: 2 -25 -04 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 3 of 3 STAFF REVIEW COMMENTS NO. 3 Project: SOUTH HAMPTON (MPP) - 04- 00500055 ENGINEERING 1. Please add 10' P.U.E. on the rear of the lots along Nantucket Drive to comply with Subdivision Regulations. This 10' easement may be placed on the outside of the "40' Buffer Zone" so as to preserve the natural vegetation in the buffered area. 2. Drainage Report needs to address capacity of ditch along Nantucket Drive. 3. Please note, the 3 -in waterline is not in compliance with City Standards and is not approved with this plat. The City Engineer must approve all "deviations" from the standards set forth in the BCS Unified Design Manual. No deviation has been approved at this time. Reviewed by: Spencer Thompson & Jennifer Prochazka Date: 6/8/04 , , a (-----7 1 _ q g _ A Response to Staff Review Comments No 2 Dated 06/01/04 or) J South Hampton — Master Preliminary Plat lat boundary and name revised. rihoda added to Plat as Owner / Applicant. 1 J Note 7 removed. i tt ,1'' / l /��i • 1 Notes revised as requested. Note revised as requested. Sand Dollar Cove has been renamed to Mariner's Cove. J Sidewalk revised as requested. $' Note added to Plat. "• —,10' PUE added to Plat. MD he easement in the front of these lots has be n increased to 10' in width to allow more room for utilities. ftidd CA bQ � ��' The ditch along Nantucket Drive does not have capacity for storm water discharge once Phase 2 is developed due to its shallow depth. The detailed design drawings otifl for Phase 2 will provide the modifications to the ditch necessary to increase the \ capacity. It appears the ditches have "silted in" over time, which has reduced the 4" )/\) capacity. Perhaps the city street maintenance crews could remove the sediment 44 and restore the ditch to its required depth. (A A) : 4 ij) A water and sewer report for South Hampton has been submitted with the Phase 3 ? Final Plat and construction drawings. Drainage reports will be submitted with ach Phase. ..Yes the easement has been noted on the Plat as a PUE and PDE. 4,1 ote 15 states that a pecia D esign request wi se made for this line to be a ' `� line since it onl •rovides seivice to 9 lots and does not .rovide fire h drant flow 5. Note added to Plat. v16. Note added to Plat. cl _ . ,. Note added to Plat. RO (Alt t a/OX f ), H' - 4 ti• , . Ai 4_______) : ig \ '"% i ' • From: Jennifer Prochazka To: ginger!urso @texcon.net; Joe Schultz Date: 5/3/2004 4:17:31 PM Subject: South Hampton / Nantucket MPP Ginger & Joe, Just to let you know, we are unable to return comments on this submittal without doing a 'stop review' because the lots do not meet the existing zoning. We will return comments on this submittal after the zoning is approved at City Council on May 13th and the Concept Plan is approved at the Design review Board on May 14th. This item will then be tentatively set for June 3rd P &Z meeting. Please call or email if you have any questions! Thanks! Jennifer Prochazka Staff Planner Development Services City of College Station tel.: 979.764.3570 fax: 979.764.3496 CC: Bridgette George; Natalie Ruiz; Spencer Thompson