Loading...
HomeMy WebLinkAboutSTAFF REVIEW COMMENTS C__IiCITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM April 24, 2003 TO: Rick Jenkins, Main Street Homes, Via fax 512.478.5678 FROM: Bridgette George, Assistant Development Manager SUBJECT: WESTFIELD ADDITION PH 2B (DP) Staff reviewed the above - mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and approval of the plans: Two (2) sets of revised construction documents. If you have any questions or need additional information, please call Spencer Thompson or myself at 764.3570. Attachments: Staff Review Comments Cc: CSC Engineering & Environmental Consultants, Inc., Via fax 778.0820 Case file no. Home of Texas A&M University WESTFIELD ADDITION PH 2B (FP) - (03- 00500103) ENGINEERING REVIEW COMMENTS No. 1 1. In light of the fact that the water line along Springfield Drive is constructed and the most logical place for a connection falls under the pavement, the next best design would be to connect to the end of the line, parallel Graham and extend the line along Meadow View to meet it. 2. Sheet C7. Silt fence appears to be on private property. Please adjust. 3. Sheet C9; Detail 1; should read POTABLE WATER LINE. Reviewed by: Spencer Thompson Date: April 23, 2003 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City of College Station will constitute a completely new review. Page 2 of 2 CITY OF COLLEGE STATION `I DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 COLLEGE STATION Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM April 24, 2003 TO: Rick Jenkins, Main Street Homes, Via fax 512.478.5678 FROM: Bridgette George, Assistant Development Manager SUBJECT: WESTFIELD ADDITION PH 2B (FP) - Final Plat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, May 5, 2003, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, Thursday, May 15, 2003, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) copies of the revised final plat; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to nmanhart@ci.college- station.tx.us Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Spencer Thompson or myself at 764 -3570. Attachments: Staff review comments cc: CSC Engineering & Environmental Consultants, Inc. Riley Engineering Co., Via fax 778.0820 Case file #03- 00500103 Home of Texas ABM University STAFF REVIEW COMMENTS NO. 1 Project: WESTFIELD ADDITION PH 2B (FP) - 03- 00500103 ENGINEERING 1. Please replace Certificate for City Planner with Certificate for Planning and Zoning Commission. This is not a Minor Plat. 2. Please remove Note 7. 3. Please correct Location Map. There is no Phase 4 and the other phases are not shown correctly. 4. Label Block 1. 5. Title Block is incorrect. What kind of plat, Lots 1 thru ?, Block 1, etc.... 6. Comments for construction drawings to be returned separately. Reviewed by: Spencer Thompson Date: April 23, 2003 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city. 5. Developer provides digital AutoCAD 14 version of plat and /or site plan. email to rbolin @ci.college- station.tx.us 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). Reviewed by: Ronnie Bolin NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 3