MEMORANDUM
April 29, 2003
TO: Veronica J. B. Morgan, Mitchell & Morgan, L.L.P., Via fax 260 -3564
FROM: Bridgette George, Assistant Development Manager
SUBJECT: GATEWAY SUBDIVISION (REPLAT) - Final Plat
Staff reviewed the above - mentioned final plat as requested. The following page is a list
of staff review comments detailing items that need to be addressed. If all comments
have been addressed and the following information submitted by Monday, May 5, 10:00
a.m., your project will be placed on the next available Planning and Zoning Commission
meeting scheduled for, May 15, 2003, 7:00 p.m. in the City Hall Council Chambers,
1101 Texas Avenue.
Two (2) copies of the revised final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
nmanhart @ci.college - station.tx.us
Upon receipt of the required documents for the Planning & Zoning meeting, your project
will be considered formally filed with the City of College Station. Please note that if all
comments have not been addressed your project will not be scheduled for a Planning &
Zoning Commission meeting. Your project may be placed on a future agenda once all
the revisions have been made and the appropriate fees paid. If you have any questions
or need additional information, please call or myself at 764 -3570.
Attachments: Staff review comments
cc: Drew Congelton, 167 Monterrey Road, Montgomery, TX, 77356
CSI & Associates, 18377 Beach Blvd, Ste 106, Huntington Beach, CA, 92648
Case file #03- 00500102
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: GATEWAY SUBDIVISION (REPLAT) - 03- 00500102
ENGINEERING
1. Plat does not close. One error appears to be in the NW property line length
dimension. Scales to — 700 -ft.
2. PAE /PUE on Lot 2RA was by replat of adjacent lot.
3. You may show the access easement on Lot 2RE as you wish. Please note, the
owner has been notified that access to SH 6 will not be granted to this property.
The access easement proposed will be for Lot 2 to access the current drive on Lot 3
Block 1. However, the owner of Lot 3, Block 1 must grant reciprocal rights in order to
facilitate a joint use. In addition, the rezoning of this property to CB limited the
number of access points to this site from SH 6.
4. Show current, regulatory floodplain and note regarding current map.
5. Engineering comments regarding construction plans to be returned separately.
Reviewed by: Spencer Thompson Date: April 29, 2003
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer pours transformer pad(s) per city specs and design.
3. Developer installs pull boxes as per city specs and design.(pull boxes
provided by the city.
4. Developer provides digital AutoCAD 2000i version of plat and /or site plan.
email to rbolin( ci.college- station.tx.us
5. Developer provides load data for project.
6. Developer provides temporary blanket easement for construction
purposes.
7. Developer provides easements for electric infrastructure as installed for
electric lines.
8. Developer provides 20' PUE along S36d02'09 "E. From property line to property line.
Reviewed by: Ronnie Bolin Date: 4 -24 -03
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 2 of 2
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
COLLEGE STATION College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
May 9, 2003
TO: Veronica J. B. Morgan, Mitchell & Morgan, L.L.P., Via fax 260 -3564
FROM: Bridgette George, Assistant Development Manager
SUBJECT: Gateway Subdivision Engineering Comments
Staff reviewed the above - mentioned engineering documents as requested. The
following page is a list of staff review comments detailing items that need to be
addressed. Please address the comments and submit the following information
for further staff review and approval of the plans:
Two (2) sets of revised construction documents.
If you have any questions or need additional information, please call Spencer
Thompson at 764.3570.
Attachments: Staff Review Comments
Cc: Drew Congleton, 167 Monterrey Road, Montgomery, TX, 77356
Case file no. 03 -102
Home of Texas A&M University
GATEWAY SUBDIVISION (REPLAT) (03- 00500102)
ENGINEERING REVIEW
COMMENTS No. 2
1. Please reposition tee for hydrant to a location on the main more suitable for
future maintenance: -Sta 4 +30. If hydrant lead is Tess than 18 -ft, no profile is
required.
2. My information does not show an existing branch to the east off the existing
8" line. You may not TAP an 8" line with an 8" tap. Home Depot plans show
the line changing from 8" to 12" in this location. You may wish to tap the 12"
line or cut a tee into the 8" line. Please revise plans.
Reviewed by: Spencer Thompson Date: May 9, 2003
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must
be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on
these plans that have not been pointed out to the City of College Station will constitute a
completely new review.
Page 2 of 2