Loading...
HomeMy WebLinkAboutSTAFF COMMENTS 4 , CITY OF COLLEGE STATION _ DEVELOPMENT SERVICES 1 101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM November 21, 2003 TO: Adam Wallace, Carlomagno Surveying, Via fax 775.4787 FROM: Bridgette George, Assistant Development Manager SUBJECT: STONE FOREST PH 2 (RP) - Final Plat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for the final plat to filed approved and filed at the Brazos County Clerk's Office: One (1) copy of the revised final plat; and, One (1) Mylar original with the appropriate signatures. One (1) copy of the digital file of the final plat on diskette or e-mail to nmanhart @ci.college- station.tx.us If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: Easterling Homes, LLC, Via fax 260.8281 Case file #03- 00500259 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 2 Project: STONE FOREST PH 2 (RP) - 03- 00500259 ENGINEERING 1. The format is fine. 2. Please remove contour lines from Original Plat. Remove pavement line. Remove storm drains. Remove everything except what was on original plat. 3. Increase font on easement information call -outs. 4. Only one curve table shown. C2, C3, C5, and C6, all change when lot lines are moved. 5. After these corrections are made, please submit the mylar signed by the owner. The mylar will then be signed by staff and filed. Reviewed by: Spencer Thompson Date: November 20, 2003 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2 CITY OF COLLEGE STATION ‘j DEVELOPMENT SERVICES 1 101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 COLLEGE STATION Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM October 23, 2003 TO: Adam Wallace, Carlomagno Surveying, Via fax 775.4787 ✓ FROM: Bridgette George, Assistant Development Manager SUBJECT: STONE FOREST PH 2 (RP) - Final Plat Staff reviewed the above - mentioned final plat as requested but had to stop review due to an incomplete submittal. The following page is a preliminary list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information to be scheduled for a future Planning & Zoning Commission meeting: Paid Tax Certificates; Two (2) copies of the revised final plat; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to nmanhart@ci.college- station.tx.us If you have any questions or need additional information, please call Spencer Thompson or myself at 764.3570. Attachments: Staff review comments cc: Easterling Homes, LLC, Via fax 260.8281 Dante Carlomagno, Carlomagno Surveying, Via fax 775.4787 ✓ Case file #03- 00500259 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: STONE FOREST PH 2 (RP) - 03- 00500259 STOP REVIEW ENGINEERING 1. Submit tax certificates. 2. Incorrect plating format. 3. Show abutting parcels and ownership. 4. It appears this qualifies as an amending plat and may be submitted as such. Reviewed by: Spencer Thompson Date: October 22, 2003 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city. 5. Developer provides digital AutoCAD 14 version of plat and /or site plan. email to rbolin @ci.college- station.tx.us 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). Reviewed by: Ronnie Bolin Date: NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 2