Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
STAFF COMMENTS
STAFF REVIEW COMMENTS NO. 2 Project: ALLEN HONDA SUNBDIVISION (FP) - 03- 00500275 ENGINEERING 1. Since this is now a replat, the new lot should be called Lot 1 R. Reviewed by: Jennifer Prochazka & Carol Cotter Date: 11 -11 -03 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM November 3, 2003 TO: C.J. Allen, Via fax 693.6471 1 FROM: Bridgette George, Assistant Development Manager SUBJECT: ALLEN HONDA SUNBDIVISION (FP) - Final Plat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, November 10, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, November 20, 2003, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) copies of the revised final plat; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e -mail to nmanhart @ci.college- station.tx.us Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Carol Cotter or myself at 764 -3570. Attachments: Staff review comments cc: Michael McClure, McClure Engineering Inc., Via fax 693.2554 Case file #03- 00500275 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: ALLEN HONDA SUNBDIVISION (FP) - 03- 00500275 ENGINEERING 1. Southwest Parkway is a minor arterial on the Thoroughfare Plan and requires a minimum 90 -foot right -of -way. A 5 -foot dedication will be required. 2. Please show the vacating plat as it is currently platted. 3. Please change the title of the plat to "Vacating & Replat." 4. All property owners in the plat will have to sign the plat. Please provide additional Certificates of Ownership & Dedication as needed. Reviewed by: Carol Cotter & Jennifer Prochazka Date: 10 -31 -03 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city. 5. Developer provides digital AutoCAD 2002 version of plat and /or site plan. email to rbolin ©cstx.gov 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 9. Developer provides 20' easement covering URD primary electric line and transformer feeding Allen Honda. Reviewed by: Ronnie Bolin Date: 10 -29 -03 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 2 STAFF REVIEW COMMENTS NO. 1 Project: ALLEN HONDA SUNBDIVISION (FP) - 03 00500275 ENGINEERING '1. Southwest Parkway is a minor arterial on the Thoroughfare Plan and requires a minimum 90 -foot right -of -way. A 5 -foot dedication will be required. '2. Please show the vacating plat as it is currently platted. 3. Please change the title of the plat to "Vacating & Replat." 4. All property owners in the plat will have to sign the plat. Please provide additional Certificates of Ownership & Dedication as needed. Reviewed by: Carol Cotter & Jennifer Prochazka Date: 10 -31 -03 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city. 5. Developer provides digital AutoCAD 2002 version of plat and /or site plan. email to rbolin(c�cstx.gov 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 9. Developer provides 20' easement covering URD primary electric line and transformer feeding Allen Honda. Reviewed by: Ronnie Bolin Date: 10 -29 -03 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 3