Loading...
HomeMy WebLinkAboutSTAFF REVIEW COMMENTS CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM October 30, 2003 TO: Joe Gattis, Ash & Browne Engineering, Inc., Via fax 846.8914 FROM: Bridgette George, Assistant Development Manager SUBJECT: REATTA MEADOWS SEC 1 PH 1 (FP) - Final Plat Staff reviewed the above - mentioned final plat as requested but had to stop review due to an incomplete submittal. The following page is a preliminary list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by an established deadline to be scheduled for a future Planning & Zoning Commission meeting: Two (2) copies of the revised final plat; Two (2) copies of the Drainage Report; One (1) copy of the Engineer's Estimate for public infrastructure; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to nmanhart@ci.college- station.tx.us If you have any questions or need additional information, please call Spencer Thompson or myself at 764.3570. Attachments: Staff review comments cc: Barron Road Meadows, LP, Via fax 696.0001 Case file #03- 00500269 Home of Texas ABM University STAFF REVIEW COMMENTS NO. 1 Project: REATTA MEADOWS SEC 1 PH 1 (FP) - 03- 00500269 STOP REVIEW ENGINEERING 1. It is impossible to complete the review of this plat without all necessary documentation. Submit a drainage report in compliance with the Drainage Policy and Design Standards by which the storm drain system was designed. 2. Detention is required for all development unless it can be proven that there is no rise in the floodplain downstream. Submit drainage report detailing offsite impacts. 3. A turnaround is required on Pomel Drive. You may do so on future lots or wish to include Chulo with this Phase 1. 4. A turnaround is required at the end of Victoria. You may wish to show a temporary access easement on the plat to accommodate a hammerhead. 5. Engineer's estimate for public infrastructure is required. 6. You can not show a portion of Victoria as "to be dedicated by separate instrument ". The owner must dedicate the land to you or they must be a co- signer of the plat. Reviewed by: Spencer Thompson Date: October 29, 2003 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city. 5. Developer provides digital AutoCAD 2002 version of plat and /or site plan. email to rbolincstx.gov 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). Reviewed by: Ronnie Bolin Date: 10 -29 -03 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 2