MEMORANDUM
October 30, 2003
TO: Joe Gattis, Ash & Browne Engineering, Inc., Via fax 846.8914
FROM: Bridgette George, Assistant Development Manager
SUBJECT: REATTA MEADOWS SEC 1 PH 1 (FP) - Final Plat
Staff reviewed the above - mentioned final plat as requested but had to stop review due
to an incomplete submittal. The following page is a preliminary list of staff review
comments detailing items that need to be addressed. Please address the comments
and submit the following information by an established deadline to be scheduled for a
future Planning & Zoning Commission meeting:
Two (2) copies of the revised final plat;
Two (2) copies of the Drainage Report;
One (1) copy of the Engineer's Estimate for public infrastructure;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
nmanhart@ci.college- station.tx.us
If you have any questions or need additional information, please call Spencer
Thompson or myself at 764.3570.
Attachments: Staff review comments
cc: Barron Road Meadows, LP, Via fax 696.0001
Case file #03- 00500269
Home of Texas ABM University
STAFF REVIEW COMMENTS NO. 1
Project: REATTA MEADOWS SEC 1 PH 1 (FP) - 03- 00500269
STOP REVIEW
ENGINEERING
1. It is impossible to complete the review of this plat without all necessary
documentation. Submit a drainage report in compliance with the Drainage Policy
and Design Standards by which the storm drain system was designed.
2. Detention is required for all development unless it can be proven that there is no rise
in the floodplain downstream. Submit drainage report detailing offsite impacts.
3. A turnaround is required on Pomel Drive. You may do so on future lots or wish to
include Chulo with this Phase 1.
4. A turnaround is required at the end of Victoria. You may wish to show a temporary
access easement on the plat to accommodate a hammerhead.
5. Engineer's estimate for public infrastructure is required.
6. You can not show a portion of Victoria as "to be dedicated by separate instrument ".
The owner must dedicate the land to you or they must be a co- signer of the plat.
Reviewed by: Spencer Thompson Date: October 29, 2003
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design.(pull boxes
provided by the city.
5. Developer provides digital AutoCAD 2002 version of plat and /or site plan.
email to rbolincstx.gov
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction
purposes.
8. Developer provides easements for electric infrastructure as installed for
electric lines (including street lights).
Reviewed by: Ronnie Bolin Date: 10 -29 -03
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.