MEMORANDUM
February 27, 2004
TO: Wallace Phillips, Greens Prairie Investors, Ltd., Via fax 690.1041
FROM: Bridgette George, Assistant Development Manager
SUBJECT: CASTLEGATE SEC 7 (PP) -Preliminary Plat
Staff reviewed the above-mentioned preliminary plat as requested. The following page
is a list of staff review comments detailing items that need to be addressed. If all
comments have been addressed and the following information submitted by Monday,
March 8, 10:00 a.m., your project will be placed on the next available Planning and
Zoning Commission meeting scheduled for March 18, 2004, 7:00 p.m. in the City Hall
Council Chambers, 1101 Texas Avenue.
Ten (10) copies of the revised preliminary plat; and,
One (1) Mylar original of the revised preliminary plat.
One (1) copy of the digital file of the preliminary plat on diskette or e-mail
to nmanhart@ci.college-station.tx.us
Upon receipt of the required documents for the Planning & Zoning meeting, your project
will be considered formally filed with the City of College Station. Please note that if all
comments have not been addressed, your project will be pulled from the scheduled
Planning & Zoning Commission agenda. Your project may be placed on a future
agenda once all the revisions have been made and the appropriate fees paid. If you
have any questions or need additional information, please call Carol Cotter or myself at
764.3570.
Attachments: Staff review comments
cc: Joe Schultz, P.E., Texcon, Via fax 979.764.7759 ;i
Case file #04-00500051
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: CASTLEGATE SEC 7 (PP) - 04-00500051
ENGINEERING
1. Designate that part of the floodplain shown on Lots 14 through 17 as drainage
easement.
2. The storm sewer system shown on this plat is private and as such cannot be located
in a PUE except to cross one. It should be located in a private drainage easement.
3. Please relocate the manhole near Lots 2 and 3 of Block 1 out from under the street
pavement.
4. Please note on the plat the modifications/variances to College Station standards
approved with the PDD.
5. Please Note: The sewer, water and storm sewer line sizes shown on the plat cannot
be approved until water and sewer reports are submitted.
Reviewed by: Carol Cotter Date: February 26, 2004
ELECTRICAL
1. Developer installs conduit as per city specs and design.
2. Developer provides 30' of rigid conduit for riser pole(s). Developer installs first 10'.
City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design. (pull boxes provided by
the city).
5. Developer provides digital AutoCAD 2002 version of plat and/or site plan. Email to
rbolin@cstx.gov.
6. Developer provides load data for project.
7. Developer installs street lighting per city specs and design.
8. Developer provides temporary blanket easement for construction purposes.
9. Developer provides easements for electric infrastructure as installed for electric lines
(including street lighting).
Reviewed by: Ronnie Bolin Date: 2-25-04
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.