Loading...
HomeMy WebLinkAboutDevelopment Permit Application Ckff FOR OFFICE USE ONLY CASE N O.: D ATE SUBMITTED: CITY OF COLLEGE STATION TIME: 10 : co Home of Texas AerrM University' STAFF: ,.,/ DEVELOPMENT PERMIT APPLICATION MINIMUM SUBMITTAL REQUIREMENTS: © $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 1% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. glik Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). Date of Optional Preapplication or Stormwater Management Conference DECEMBER 12, 2007 SPECIAL FLOOD HAZARD AREA? ❑ Yes p No (Zone A or Zone AE on FEMA FIRM panels) NAME OF PROJECT THE COTTAGES OF COLLEGE STATION ADDRESS N/A LEGAL DESCRIPTION (Lot, Block, Subdivision) LT 1, BLK 3& LT 2, BLK 1 THE COTTAGES OF COLLEGE STA TION APPLICANT / PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name MITCHELL & MORGAN, LLP C/O VERONICA MORGAN, PE E -mail V @MITCHELLANDMORGAN. Street Address 511 UNIVERSITY DRIVE EAST, SUITE 204 City COLLEGE STATION State TEXAS Zip Code 77840 Phone Number ( 260 -6963 Fax Number ( 260 -3564 PROPERTY OWNER'S INFORMATION: Name CAPSTONE - CS, LLC C/O ROB HOWLAND, C.O.O. E -mail rhowland @capstoneemail.com Street Address 431 OFFICE PARK DRIVE City BIRMINGHAM State ALABAMA Zip Code 35223 Phone Number (205) 414 -6416 Fax Number (205) 414 -6455 ARCHITECT OR ENGINEER'S INFORMATION: Name MITCHELL & MORGAN, LLP C/O VERONICA MORGAN, PE E -mail v @mitchellandmorgan.com Street Address 511 UNIVERSITY DRIVE EAST, SUITE 204 City COLLEGE STATION State TEXAS Zip Code 77840 Phone Number ( 260 -6963 Fax Number (979) 260 -3564 10/10 Page 1 of 4 CERTIFICATIONS REQUIRED FOR. ALL DEVELOPMENT Owner Certification: 1. No work of any_ kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, work must cease until permit is reissued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will .expire if no significant work is progressing within 24 months of issuance. 8. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance withell necessary State and Federal Permits prior to construction including NOI and SWPPP. 7. If required,, Elevation Certificates will be provided with elevations certified during. construction (forms at slab pre - pour) find :' pbstconstruction. 8. Owner herebygives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, induding detention ponds proposed as part of this project, it shall be designedand constructed first tn the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from oonstrudaon, erosion, and sedimentation shall not be deposited In city streets, or existing drainage-fa All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11. The Information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All :development has been designed in accordance with all applicable: codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release of plans to (name or firm) is authorized for bidding purposes only. 1 understand that final approval and release of plans and development for construction is contingent on contractor signature on approved. Development Permit. 13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. Property Owner(s) Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be. constructed first in the construction sequence: 2. I will obtain or can: show compliance with all necessary Local, State and Federal Permits prior to construction including: NOi and SWPPP Design will not preclude compliance with TPDES: i.e., Project over 10 acres may require a sedimentation basin. 3. The information and conc contained in the attached plans and supporting documents comply with the current requirements of the. of College Station, Texas; City Code, Chapter 13 and associated BCS Unified Design Guidelines:; All development has been designed in accordance with all applicable codes and ordinances of the City of C011egeStatiertandState and Federal Regulations. 4. 1, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE; DEVELOPMENT PERMIT APPLICATION ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. Engineer Date 10/10 Page 2 of 4 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re- issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOI and SVVPPP. 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre - pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 11. The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release of plans to (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. Property Owner(s) Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOI and SVVPPP. Design will not preclude compliance with TPDES: i.e., Project over 10 acres may require a sedimentation basin. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 4. HE ENGINEER, AGREE TO AND C�iZ1F� THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS t R THE DEVELOPMENT PERM I i ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND CURA T: i *'(P ..`II q� * 11 1 J t i neer g a .. i *. ; */� 4 -1Z -I1 Engineer ;.VERONICA f MORGAN Date - o: . 77689 gi 1 / 1 u .C� ry F GI S TEP� v ' 10/10 Page 2 of 4 • The following CERTIFICATIONS apply to development in Special Flood Hazard Areas. Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only Permits:* `� ` A. I, `,e,r J � 't/Li certify, as demonstrated in the attached drainage study, that the alterations or development co�`7 e - ed by this permit, shall not: (i) increase the Base Flood elevation; (ii) create additional areas of Special Flood Hazard Area; (iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set forth in the City of College Station Code of Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor (v) increase Base Flood velocities. „--- beyon� hose areas exempted b : Sect of Chapter 13 Code of Ordinances. * • • r \ . * !I 4* IC u . F MORGAN 4-(z-1( , :� : 77689 ' i Engineer , j , l 0' 9 gy p. : 4, . Date Initial ttt t`s ; , ',: ' , 7• 1 .1-- ... .. ( 'M F" 443 * If a platting- status exemption to this requirement is asserted, provide written justification under separate letter in lieu of certification. Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits: B. I, , certify to the following: (i) that any nonre '•ential or multi - family structure on or proposed to be on this site as part of this application is designed to preve damage to the structure or its contents as a result of flooding from the 100 -year storm. S Engineer Date Additional certifica • n for Floodway Encroachments: C. I, , certify that the construction, improvement, or fill covered by this permit shall not increase the la: e flood ele ation. I will apply for a variance to the Zoning Board of Adjustments. , N �A Engineer Date 10/10 Page 3 of 4 Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate required). Residential Str tures: D. 1, , certify that all new construction or any substantial improvement of any residential str ure shall have the lowest floor, including all utilities, ductwork and any basement, at an elevation at least one fo• above the Base Flood Elevation. Required Elevation Certificates will be provided with elevations certified during ••nstruction (forms at slab pre -pour) and post construction. Engineer / Surveyor Date Commercial Struc ' -s: E. 1, , certify that all new construction or any substantial improvement of any commercial, industrial, . other non - residential structure are designed to have the lowest floor, including all utilities, ductwork and basements, - evated at least one foot above the Base Flood Elevation Engineer / Surveyor Date OR I, , certify that the structure with its attendant utility, ductwork, basement and sanitary facilities is designed to be flood - proofed so that the structure and utilities, ductwork, basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the hydrostatic and hydrodynamic conditions. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre - pour) and post construction. Engineer / Surveyor Date Conditions or comments as part of approval: Print Form 10/10 Page 4 of 4