HomeMy WebLinkAboutDevelopment Permits (*.11 DEVELOPMENT PERMIT
PERMIT NO. 11 -45 A
F OR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA
CrrY o} Coi.LecesrAt ION RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
Y,'uuning �Ikirfopmrnr tiwrcn
SITE LEGAL DESCRIPTION: SITE ADDRESS: 23 L
Cottages of College Station
Lot 2, Block 1 DRAINAGE BASIN:
(Site Plan - Clearing, Grading & Erosion Control Only) White Creek
DATE OF ISSUE: April 29, 2011 VALID FOR 24 MONTHS
OWNER: CONTRACTOR:
Capstone - CS, LLC C/O Rob Howland, COO (see below)
431 Office Park Drive
Birmingham, Alabama 35223
TYPE OF DEVELOPMENT: Clearing and Grading Permit
CONDITIONS:
1. No work of any kind may start until a Development Permit is issued.
2. No work beyond limits covered in permit is authorized.
3. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
4. Development shall not be used or occupied until Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -pour)
and post construction.
7. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
8. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project.
9. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
10. All disturbed areas will be re- vegetated prior to Letter of Completion or Certificate of Occupancy.
11. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
12. All construction shall be in accordance with the stamped approved plans and specifications for the above -named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
13. Special Conditions: * *TCEQ Phase II Rules In Effect **
1, OP v; , the Contractor, hereby agree to comply with all conditions herein.
7`91/7/
• nt - :ctor Dat
J °1 (5 75 777 -02�I2
1 hereby grant this ermit for • - velopment. Contact �('' 1 I i� � t'l , the Public Works
In • - • as i e this pr- ect 24 hours prior to beginning construction for schedulin required Inspections.
City Engineer /Representative Dat
(*.1,#"4 DEVELOPMENT PERMIT
PERMIT NO. 11 -45 C
F OR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA
on °' °L`. Wt. s' "` ION
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION: SITE ADDRESS: 2.3
Cottages of College Station 3C
Lot 1, Block 1 DRAINAGE BASIN:
(Site Plan - Full Development Permit) White Creek
DATE OF ISSUE: June 2, 2011 VALID FOR 24 MONTHS
OWNER: CONTRACTOR:
Capstone - CS, LLC c/o Rob Howland, COO (see below)
431 Office Park Drive
Birmingham, Alabama 35223
TYPE OF DEVELOPMENT: Full Development Permit
CONDITIONS:
1. No work of any kind may start until a Development Permit is issued.
2. No work beyond limits covered in permit is authorized.
3. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
4. Development shall not be used or occupied until Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -pour)
and post construction.
7. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
8. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project.
9. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
10. All disturbed areas will be re- vegetated prior to Letter of Completion or Certificate of Occupancy.
11. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
12. All construction shall be in accordance with the stamped approved plans and specifications for the above -named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
13. Special Conditions: * *TCEQ Phase II Rules In Effect **
I, J_; .2c9 , the Contractor, hereby agree to comply with all conditions herein.
Contractor Date
• (575 -77 7 -Oz-W-- t Public Works
I hereby grant this permit for - velopment. Contact 64t. I f ^� \
In -- o ssigned t• this •: 24 • • rs prior to beginning construction for scheduling re uired Inspections.
75/2- /
%.Engineer/ epresentative Date
(*.r1* DEVELOPMENT PERMIT
PERMIT NO. 11 -45 B
F OR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA
C rr� or Cori,eeesTAcION RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
t'wrcninp, .° lkirlopmnu Srrvirn
SITE LEGAL DESCRIPTION: SITE ADDRESS:
Cottages of College Station Corner of FM 2818 & Holleman
Lot 1 Block 1 DRAINAGE BASIN:
(Leasing Trailer Site Only) White Creek
DAT ay 20, 2011 VALID FOR 24 MONTHS
OWNER: CONTRACTOR:
Capstone - CS, LLC C/O Rob Howland, COO (see below)
431 Office Park Drive
Birmingham, Alabama 35223
TYPE OF DEVELOPMENT: Full Development Permit
CONDITIONS:
1. No work of any kind may start until a Development Permit is issued.
2. No work beyond limits covered in permit is authorized.
3. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
4. Development shall not be used or occupied until Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -pour)
and post construction.
7. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
8. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project.
9. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
10. All disturbed areas will be re- vegetated prior to Letter of Completion or Certificate of Occupancy.
11. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
12. All construction shall be in accordance with the stamped approved plans and specifications for the above -named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from_ S Unified Design Guidelines, Specifications and Details specifically
requested and approve
13. Special Condition . evelopment Permit for Leasing Trailer Only' * *TCEQ Phase II Rules In Effect**
1, ; : 4-T , the Contractor, hereby agree to comply with all conditions herein.
[ c 1/1
Contractors Date
I hereby grant this permit for development. Contact 4 4 6 // -he,-- , th e Public Works
Insp assigned to this project 24 hours prior to beginning construction for schedulin required Inspections.
—5/ //
City Engineer /Represe ve Date