Loading...
HomeMy WebLinkAboutWastewater Letter November 11, 2011 HAGOOD `NSINInuNS AUOCIATU City of College Station 1 101 Texas Avenue College Station, Texas 77842 Re: Wastewater Letter Taco Bell (SP) — 1 1- 005001 43 To Whom It May Concern: The Taco Bell site is located on Lot 18, Block 3 of the Tower Point Subdivision Phase 8A. This project is proposing to construct 2,949 SF building with associated utilities and parking. The service lateral for project is proposed to connect to the existing 6" wastewater line stubout on the northeast area of the project site. The existing 6" wastewater stub -out connects to a 10" wastewater main which was constructed with the Tower Point Infrastructure Development, Private Drive G & H. The maximum wastewater flow for Taco Bell is 70 gpm based on fixture unit count. The 6" wastewater service pipe has a slope of 5.50% which is less than the maximum slope of 12.35% per TCEQ Chapter 217 requirement. Therefore, the existing sanitary sewer system constructed with the Tower Point Infrastructure Development, Private Drive G & H, has adequate capacity to handle the new sanitary sewer flows for the Taco Bell development. I hope that you find this information adequate. Should you need anything further, please contact me at your earliest convenience at (512) 244 -1546. Sincerely, Hagood Engineering Associates �'�" pF '� * rickson B. Men.gza P.E. I ' •'• * Manager ERICKSON B. MENDOZA� : ) / A 98086 eS �ONAL E� Alkvik\vbr It One Chisholm Trail, Suite 5200 • Round Rock, Texas 78681 • P: 512.244.1546 • F: 512.244.1010 • www.hea.eng.pro Registration No. F -12709 11 IC13 Pi IS'' cC 60