HomeMy WebLinkAboutResponse to Staff Comments STAFF REVIEW COMMENTS NO. 1 Project: WE RENT STORAGE (FP) - 12- 00500033 PLANNING 1. The title report provided states that the research was conducted for the time between December 2, 2004 - March 18, 2011. Please revise the report extend within 90 days of the Final Plat application submittal date, or provide clarification of the document. o Please see attached. 2. Please provide documentation for the Memorandum of Amendment mentioned in the title report. o Please see attached. 3. Please submit the second page of the TDG Management, L.P. Assumed Name Certificate showing that Alton Ofczarzak has sole authority to act on behalf of the company. Page 1 shows only the registered agent which is not always the authorized person. o See Attached 4. There is an easement mentioned in the Nothing Further Letter that is not shown on the Final Plat. Also, please specify which easements, mentioned in the original title report, are not applicable to this portion of the property. o I have requested that the Surveyor Paul Williams. R.P.L.S. contact you & address this issue. 5. Please remove the zoning information labels from the subject tract and the buffer area. o Please see plat 6. The buffer needs to be removed from the plat document since that is site planning requirement. o Please see plat 7. Lot comer markers should be added to the lot perimeters. o Please see plat 8. Please revise General Note #3 to state that Lots 1 and 2 are zoned PDD Planned Development District and Lot 3 is zoned R -1 Single -Family Residential. o Please see olat 9. Brazos CAD shows Lot 7 Block 3 of Horse Haven Estates Phase 3 as being owned by Brandon O'Riley. o Please see plan. 10. General Note #4 should reflect the meritorious modifications approved through the PDD zoning. o Please see plat, 11. General Note #5 should be revised to state that the easements are being dedicated with the Final Plat. o Note removed , please see plat. 12. Please provide documentation showing that Horse Haven Estates Homesowner's Association has responsibility for the maintenance of Lot 2. o See attached 13. Please remove the Approval of the City Council certificate. This plat will not require Council action. o Please see plat 14. Revise the Certificates of Ownership and Dedication to reflect current language found in the Section 8.8 of the Unified Development Ordinance (UDO). The dedication of greenways needs to be added, and there is a sentence at the end that is missing. o Please see plat NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and 'bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 5 15. Please revise the Certificate of the County Clerk to reference "Official Records" instead of "Deed Records ". This is a typo in the UDO. o Please see plat 16. The Certificate of Surveyor title needs to be revised to exclude "and /or engineer". o Please see plat 17. The Approval of Planning and Zoning Commission should not include an Attest for the City Secretary. o Please see plat 18. The title block should appear as: FINAL PLAT of the We Rent Storage Subdivision Lots 1 -3, Block 1 on 8.21 acres o Please see plat. 19. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. 20. Please note that you will be required to submit paid tax certificates if they are not current prior to the filing of your plat. 21. The construction documents and reports are still d re sti under review and may affect the plat. P Y p Reviewed by: Lauren A. Hovde, Staff Planner Date: March 15, 2012 GREENWAYS 1. FYI... Please provide a detail of the proposed arch at site plan. o Please see attached 2. On the sidewalk cross section, provide language similar to provided sample cross section that mentions maximum slope, e etc. o I have revised the plans to show a 2% cross slope for the MUP. I have revised the contours and the MUP cross section in the profile. 3. Will you be proposing any signage? A curve waming sign and stop sign at Horse Haven Lane is suggested to promote user safety. o No sicinage is planned Reviewed by: Venessa Garza Date: March 16, 2012 TXDOT COMMENTS 1. No Comment (off state system, no anticipated impact) Reviewed by: Chad Bohne Date: March 8, 2012 EWNEERING COMMENTS NO. 1 Lir Please submit Letter of Acknowledgement. See attached Please label the 15 -foot PUE which will cover the proposed fire hydrant closest to Horse Haven Estates. X Please see plat. ease label with volume and page the existing PUE along Horse Haven Lane. o Please see plat. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 3 of 5 l ase place a note on the construction documents stating utility conflicts (manholes, valves, valve boxes) to be adjusted to grade by contractor. Please see construction documents P lease label locations of all ambulatory ramps, label missing for ramps on either side of proposed driveway. • - -se see construction documents 6. T = pr. posed sidewalk and multi -use path need to either be built or bonded before the . ject plat can be forwarded to Planning and Zoning for approval. The bond is attached. . Please illustrate proposed cross slope in plan view of the mufti-use path, as to assure the sidewalk will allow drainage from the adjacent subdivision to drainage across the path and not pond behind the existing houses. o Yes 1 have revised the MUP with a 2- percent cross slope and the drainage goes away from the residential homes lots. please see construction plans. ase revise your note concerning the sub -grade compaction on both sheets as compaction should be 98% not 95 %, per BCS Guidelines. o Please see construction plans. Reviewed by: Josh Norton Date: March 15, 2012 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. All easements on site are existing. Electric facilities will be designed within existing easements. 2. Developer provides temporary blanket easement for construction purposes or provides descriptive easements for electric infrastructure as designed by CSU for electric lines (where applicable, including street lights) 3. Developer may be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull boxes and secondary pedestals provided by CSU). 8. Developer provides digital AutoCAD 2000 or later version of plat and / or site plan. Email to: ehorton @cstx.gov. 9. Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. 10. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 4 of 5 11. To discuss any of the above electrical comments please contact Eric Horton at 979.764.6280. Reviewed by: Eric Horton Date:03 /8/12 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: March 8, 2012 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 5 of 5