Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Staff Report
• CITY Y OF" COI.i...Ec.TE STATION FINAL PLAT for We Rent Storage 12- 00500033 SCALE: Three Tots on 8.21 acres LOCATION: 2672 Horse Haven Lane ZONING: PDD Planned Development District and R -1 Single - Family Residential APPLICANT: Mike Hester, P.E., Hester Engineering Company PROJECT MANAGER: Lauren Hovde, Staff Planner Ihovde @cstx.gov RECOMMENDATION: Staff recommends approval. Planning & Zoning Commission Page 1 of 3 April 5, 2012 . • Q 1- Y �� 4 0 4 I ©`` r� 14::4y, :''' '''' ;,:‘ -':::'1,,,, ' Air' , , ' : ' � �� e� cv n , + a uJ d r' 4� R i. V 9 y$y / �(}y a �Y dr. �g �` i C ,r ", °. fx ,\,, s` 0) , ,,,, ,. ,, , .04,. ' ,•''''''** •*'i,A.*•..'‘''''... ,..,*'''''''_';,t \ `',,, , * '*.4,;.,,';*''.',.:.-''.4) � *' LIJ F -. Z. :' "44 <i• •/'''''1"*"44, ,.' li - . ' ...,", ',„"", *.:' do-`' ` a v 22 a 2m 4 � , ✓ � . � a i t � 44 ��V / W 'i4 -iN , ' �x j ,, a ° Q.''''' 111 � t � ` L WtzJ � � ��5 • ... ,,,,,,,,,,,7,,,....:..,.„.., ,,,,,,,,,,,„, ,„.. . Planning &Zoning Commission Page 2 of 3 April 5, 2012 • • DEVELOPMENT HISTORY Annexation: September 1977 Zoning: A -O Agricultural -Open upon Annexation R -1 Single - Family Residential (2004) Planned Development District (2011) Site development: Part of the site was previously the location of a gas well, but this use and associated equipment have been removed. A cell tower is located on the 0.091 acre lot. COMMENTS Parkland Dedication: Dedication is not required for non - residential plats. Greenways: The rear portion of the property is to remain as a privately maintained open space. There is no Greenways dedication associated with this plat. Pedestrian Connectivity: Sidewalks will be constructed along Horse Haven Lane. A 20 -foot Public Access Easement will be dedicated that includes a multi- use path that conforms to the Bicycle, Pedestrian, and Greenways Master Plan. A sidewalk extension connects the multi -use path to an existing sidewalk within the Horse Haven Subdivision. Bicycle Connectivity: A 20 -foot Public Access Easement will be dedicated that includes a multi -use path that conforms to the Bicycle, Pedestrian, and Greenways Master Plan. Streets: The subject tract will take access from Horse Haven Lane, which is designated as a two -lane Minor Collector on the City's Thoroughfare Plan. Impact Fees: N/A REVIEW CRITERIA Compliance with Subdivision Regulations: The proposed Final Plat is in compliance with the Subdivision Regulations contained in the Unified Development Ordinance and the approved PDD Planned Development District Concept Plan. STAFF RECOMMENDATIONS Staff recommends approval of the proposed Final Plat. SUPPORTING MATERIALS 1. Application 2. Copy of Final Plat (provided in packet) Planning & Zoning Commission Page 3 of 3 April 5, 2012