Loading...
HomeMy WebLinkAboutLetter of Completion LETTER OF COMPLETION CITY ENGINEER DATE: V/7/( CITY OF COLLEGE STATION COLLEGE STATION, TEXAS RE: COMPLETION OF KrIiG111-S( ', � ,/ expoyi- ryi tin1"S Dear Sir: The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station, Texas. This approval and acceptance by the City is requested in order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. The one -year warranty is hereby affirmed and agreed to byr._ and by their subcontractors as indicated by signatures below. ,^, W COMPLETED WARRANTY DATE t Owner: 1 151 C. ('.L LL Contractor:1 - w 4y l'V1( Doyelopr ' Phone Number: ' I�� -2�', ��`�� Phone Number: 'I∎?,. 2..13. Address: I $ E_ g mhc Sa Address: a a,, : ec,, l mop Signature: �. � �(✓ 2 1r.v� -- Signature: ACCEPT , , C & APPROVAL City Representative SN • pupae) yys�� P2'17 SITE EMITS FILED / n .II rr TEMP BLANKET OUT num City Engineer - 4 ,T 'Dhs .`NO OTHER E8MTB mem Revised 1/31/07 If College Station Utilities Reliable, Affordable, Community Owned Date test completed April 27, 2011 Time completed 9:00 A.M. Test completed by Lawrence Chavarria Witness Vincent Rodriquez 4 :J, ..o,.. FLOW HYDRANT Location Knights Gate Nozzle size 2.5 Hydrant number 0 -140 Pitot reading in PSI 77 Flow in G.P.M. 1475 y ; .sl w. , b$y,„�3bP..£a #&3, »%, ..�'w.x �; \dF:. .tr«r •. STATIC HYDRANT Location 1350 Harvey Mitchell Hydrant number 0 -121 Static PSI 95 Residual PSI 93 Comments For Initial Knightsgate Site Improvements MBESI No. 10820005 Engineer's Estimate of Construction Costs December 8, 2010 Item # Description Unit Quantity Unit Price Total Public Water System Improvements 1 8" AWWA C909, CL 235, PVC Pipe, Str. Backfill LF 190 $25.00 $4,750.00 2 18" x 8" Tapping Sleeve & Valve Assembly EA 1 $3,500.00 $3,500.00 3 8" Gate Valve EA 2 $975.00 $1,950.00 4 8" x 22.5 deg. M.J. Bend EA 1 $350.00 $350.00 5 8" x 2" Tapped Tee EA 4 $350.00 $1,400.00 6 Fire Hydrant Assembly EA 1 $2,750.00 $2,750.00 7 Flush Valve Assembly EA 1 $875.00 $875.00 Public Water System Subtotal: $15,575.00 Total Construction Cost $15,575 The above construction estimate is based on the engineer's opinion of probable construction costs. This estimate constitutes our best judgment at this time. Please note that the engineer does not have any control over contractor or supplier workloads and the degree to which inflation may affect project costs between now and the bid date. During construction, additional features may become apparent as the work progresses, which will result in an increase or decrease in cost. - // / Prepared by:`-- - (71274 , 1 , 17C A11/.7"--------19 P - of T �� J . Dale Browne, Jr., P.E. ,s'�:s 11� McClure & Browne Engineering/S ying, Inc. ? *.' ; * ,i • F Reg. No. F -458 pi J. DALE BROWNE, JR. t f il -2 0 .. 9 81890 • Q / • F so.��v� ls.o #•lo 1 of 1 9.80 AG