HomeMy WebLinkAboutLetter of Completion LETTER OF COMPLETION
CITY ENGINEER DATE: V/7/(
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
RE: COMPLETION OF KrIiG111-S( ', �
,/
expoyi- ryi tin1"S
Dear Sir:
The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station, Texas. This approval and acceptance by the City is requested in order that we
may finalize any subcontracts and to affirm their warranty on the work. This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project.
The one -year warranty is hereby affirmed and agreed to byr._
and by their subcontractors as indicated by signatures below.
,^, W COMPLETED WARRANTY DATE
t
Owner: 1 151 C. ('.L LL Contractor:1 - w 4y l'V1( Doyelopr '
Phone Number: ' I�� -2�', ��`�� Phone Number: 'I∎?,. 2..13.
Address: I $ E_ g mhc Sa Address: a a,, : ec,, l mop
Signature: �. � �(✓ 2 1r.v� -- Signature:
ACCEPT , , C & APPROVAL
City Representative SN • pupae) yys�� P2'17
SITE EMITS FILED
/ n .II rr
TEMP BLANKET OUT num
City Engineer - 4 ,T 'Dhs .`NO OTHER E8MTB mem
Revised 1/31/07
If College Station Utilities
Reliable, Affordable, Community Owned
Date test completed April 27, 2011
Time completed 9:00 A.M.
Test completed by Lawrence Chavarria
Witness Vincent Rodriquez
4 :J, ..o,..
FLOW HYDRANT
Location Knights Gate
Nozzle size 2.5
Hydrant number 0 -140
Pitot reading in PSI 77
Flow in G.P.M. 1475
y ; .sl w. , b$y,„�3bP..£a #&3, »%, ..�'w.x �; \dF:. .tr«r •.
STATIC HYDRANT
Location 1350 Harvey Mitchell
Hydrant number 0 -121
Static PSI 95
Residual PSI 93
Comments For Initial
Knightsgate Site Improvements
MBESI No. 10820005
Engineer's Estimate of Construction Costs
December 8, 2010
Item # Description Unit Quantity Unit Price Total
Public Water System Improvements
1 8" AWWA C909, CL 235, PVC Pipe, Str. Backfill LF 190 $25.00 $4,750.00
2 18" x 8" Tapping Sleeve & Valve Assembly EA 1 $3,500.00 $3,500.00
3 8" Gate Valve EA 2 $975.00 $1,950.00
4 8" x 22.5 deg. M.J. Bend EA 1 $350.00 $350.00
5 8" x 2" Tapped Tee EA 4 $350.00 $1,400.00
6 Fire Hydrant Assembly EA 1 $2,750.00 $2,750.00
7 Flush Valve Assembly EA 1 $875.00 $875.00
Public Water System Subtotal: $15,575.00
Total Construction Cost $15,575
The above construction estimate is based on the engineer's opinion of probable construction costs. This estimate constitutes our best
judgment at this time. Please note that the engineer does not have any control over contractor or supplier workloads and the degree
to which inflation may affect project costs between now and the bid date. During construction, additional features may become
apparent as the work progresses, which will result in an increase or decrease in cost.
- // /
Prepared by:`-- - (71274 , 1 , 17C A11/.7"--------19
P - of T ��
J . Dale Browne, Jr., P.E. ,s'�:s 11�
McClure & Browne Engineering/S ying, Inc. ? *.' ; * ,i
•
F Reg. No. F -458 pi J. DALE BROWNE, JR.
t
f il -2 0 .. 9 81890 • Q /
• F so.��v�
ls.o #•lo
1 of 1 9.80
AG