Loading...
HomeMy WebLinkAboutClearing Plan Drainage Letter McCLURE & BROWNE, ENGINEERING /SURVEYING, INC. 0 II at 0 1008 Woodcreekt Dr., Suite 103 College Station, Tx. 77845 (979) 693 -3838 Engineer Reg. No. F -458 13148 10th Street, Suite 210 Huntsville, Tx. 77320 (936) 294 -9749 Survey Reg. No. 101033 -00 December 8, 2010 Josh Norton Assistant City Engineer City of College Station P.O. Box 9960 College Station, Texas 77842 Re: Clearing Plan Drainage Knightsgate Site Improvements, College Station, Texas MBESI No. 10820005 Dear Josh: The purpose of this letter is certify that no drainage runoff patterns should be altered in association with the Clearing Plan for the above referenced project. Silt fence will be put in place prior to clearing the lot, and any disturbed ground shall be returned as near as possible to existing conditions. If you should have any questions or need any additional information, please do not hesitate to contact me. Sincerely, J. Dale Browne, Jr., P.E., CFM ,- '. ' *9 V ( J. DALE BROWNE, JR. la 9 . 81890 ' • I, 0 .o •, E R0•. 4/ `` /ONAL ENS AG Knightgate Site Inprovements Page 1 of 1 Clearing Plan Drainage