Loading...
HomeMy WebLinkAboutCost Estimate 0 GREENS PRAIRIE INVESTORS, LLC CASTLE ROCK PARK Cost Estimate August 25, 2008 Item I Description I Unit nsatea ' ,, tim �� I Unit Price I Total Sitework & Pavement 1 Play Ground ( + Shade Cover) LS I 55,000.00 55,000 2 Baseball Back Stops EA 1 $1,500.00 $1,500.00 3 Soccer Goals EA 4 $1,000.00 $4,000.00 4 Swing Set ( + Gravel/Rubber Pit) LS 1 $11,000.00 $11,000.00 5 Shelter (Slab, Tables, Grill, Trash can) LS 1 $22,500.00 $22,500.00 6 Area Lights EA 12 $1,500.00 $18,000.00 7 Electrical Conduit LS 1 $18,000.00 $18,000.00 8 Drinking Foutain & Water Line LS 1 $4,600.00 $4,600.00 9 Concrete Jogging Trail SF 10,160 $5.00 $50,800.00 10 Trees EA 14 $250.00 $3,500.00 11 Irrigation System LS 1 $4,000.00 $4,000.00 12 Water Meter EA 1 $500.00 $500.00 13 Drainage Pipes EA 8 $100.00 $800.00 14 2" Topsoil Placement LS 1 $7,500.00 $7,500.00 15 Site Grading LS 1 $5,000.00 $5,000.00 16 Hydromulch Seeding (Practice Fields - 100,000 SF) 'LS 1 $7,000.00 $7,000.00 17 'Design I LS 1 $5,000.00 $5,000.00 Sitework and Paving Subtotal $218,700 Pa;pe 1 of 1