GREENS PRAIRIE INVESTORS, LLC
CASTLE ROCK PARK
Cost Estimate
August 25, 2008
Item I Description I Unit nsatea ' ,, tim �� I Unit Price I Total
Sitework & Pavement
1 Play Ground ( + Shade Cover) LS I 55,000.00 55,000
2 Baseball Back Stops EA 1 $1,500.00 $1,500.00
3 Soccer Goals EA 4 $1,000.00 $4,000.00
4 Swing Set ( + Gravel/Rubber Pit) LS 1 $11,000.00 $11,000.00
5 Shelter (Slab, Tables, Grill, Trash can) LS 1 $22,500.00 $22,500.00
6 Area Lights EA 12 $1,500.00 $18,000.00
7 Electrical Conduit LS 1 $18,000.00 $18,000.00
8 Drinking Foutain & Water Line LS 1 $4,600.00 $4,600.00
9 Concrete Jogging Trail SF 10,160 $5.00 $50,800.00
10 Trees EA 14 $250.00 $3,500.00
11 Irrigation System LS 1 $4,000.00 $4,000.00
12 Water Meter EA 1 $500.00 $500.00
13 Drainage Pipes EA 8 $100.00 $800.00
14 2" Topsoil Placement LS 1 $7,500.00 $7,500.00
15 Site Grading LS 1 $5,000.00 $5,000.00
16 Hydromulch Seeding (Practice Fields - 100,000 SF) 'LS 1 $7,000.00 $7,000.00
17 'Design I LS 1 $5,000.00 $5,000.00
Sitework and Paving Subtotal $218,700