Loading...
HomeMy WebLinkAboutLetter of Completion t 23. 2: 2 ' 0 : 06Am c. 247' P. 2 LETTER OF COMPLETION CITY ENGINEER PATE: Aso / 2-- CITY OF COLLEGE STATION COLLEGE STATION, TEXAS RE: COMPLETION OF Dear Sir: The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under City inspection and completed according to plans and specifications as approved and nsgulred by the City of College • Station, Texas. This approval and acceptance by the City is requested in order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the fisted improvements on the above referenced project. The one-year warranty is hereby affirmed and agreed to by e- " ' and by their subcontractors as Indicated by signatures below. WORK COMPLETED WARRANTY DATE fir .s - 2 7 /2 Ave 2- i r.- 3 Owner: vle.0 l'-'' Contractor: MotglzGA Co stnucl ic, i, L .P, Phone Numb L5 + ° I`025S Phone Number: 979 20=s'S2.0 Address: f q I O , ` Tu.� N �� Address: &y() 6r; Or, A10571 v ,T34 "1 6 - 757 SL4; its 7 V(1✓1 � Signature: 64 1,_'4 Signature: ACCEPTA E APPROVAL ity - epresentative r � AlLiit PLAT FILED C "' = ngineer , �' • OIRE1TE earn nLEO TEMP OLIJWET EMIT FILED Reviled l/3t127 11-2...MO OMEN I$MT$ NEEDED f � September 1, 2011 Mr. Josh Norton City of College Station Engineering Department 1101 Texas Avenue College Station, TX 77842 Re: Engineering Cost Estimate Proposed Stepping Stone School 205 Rock Prairie Road College Station, Texas Gessner Engineering Job No.: 11 -0152 Dear Mr. Norton: Based on current estimations for direct material and direct labor costs, the prime cost of the public infrastructure for the above referenced project•is estimated to be $1,737. Values used to determine this estimate are included in the attached table. This estimate does not include indirect costs due to overhead or indirect manufacturing expenses. Please contact us if you have any questions or if we can be of further assistance. Sincerely, y - � � OF . TE E , q 1 GESSNER ENGINEERING, LLC F -7451 ,�P.••' • s _ 1 Y l r ....... ' Q. • o ,.jV T .... • Melissa P. Thomas, P.E. f ... 9g398•. ... �Qi� Gessner t �� pF•.ENS �� t���`ION` =,,•" Engineering 2501 Ashford Drive Attached: Probable Estimate of Public Sitework Construction Costs Suite 102 College .Station, Texas 77 840 • 1:10. Box 10703, 77842 979.080.8840 fax 979.680.8841 2204 S. Chappell Hill Street Brenham, Texas 77833 979.836.6855 tax 979.836,0847 Probable Estimate of Public Sitework Construction Costs Stepping Stone School Gessner Engineering, LLC GE Job #11 -0152 WATER Item Quantity Units Unit Cost Total 4" PVC Water Line 5 LF $ 32.00 $ 160.00 1.5" PVC Water Line 3 LF $ 18.00 $ 54.00 4" Gate Valve 1 EA $ 450.00 $ 450.00 4" Isolation Valve 1 EA $ 450.00 $ 450.00 8 "x4" Tapping Sleeve 1 EA $ 425.00 $ 425.00 4 "x1.5" Tapping Sleeve 1 EA $ 190.00 $ 190.00 Trench Safety 8 LF $ 1.00 $ 8.00 Sub Total - Water $ 1,737.00 0 Gessner Engineering