LETTER OF COMPLETION
CITY ENGINEER PATE: Aso / 2--
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
RE: COMPLETION OF
Dear Sir:
The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and nsgulred by the City of College •
Station, Texas. This approval and acceptance by the City is requested in order that we
may finalize any subcontracts and to affirm their warranty on the work. This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the fisted improvements on the above referenced project.
The one-year warranty is hereby affirmed and agreed to by e- " '
and by their subcontractors as Indicated by signatures below.
WORK COMPLETED WARRANTY DATE
fir .s - 2 7 /2
Ave 2-
i
r.- 3
Owner: vle.0 l'-'' Contractor: MotglzGA Co stnucl ic, i, L .P,
Phone Numb L5 + ° I`025S Phone Number: 979 20=s'S2.0
Address: f q I O ,
` Tu.� N �� Address: &y() 6r; Or,
A10571 v ,T34 "1 6 - 757 SL4; its
7 V(1✓1 �
Signature: 64 1,_'4 Signature:
ACCEPTA
E APPROVAL
ity - epresentative
r �
AlLiit PLAT FILED
C "' = ngineer , �' • OIRE1TE earn nLEO
TEMP OLIJWET EMIT FILED
Reviled l/3t127 11-2...MO OMEN I$MT$ NEEDED
f �
September 1, 2011
Mr. Josh Norton
City of College Station Engineering Department
1101 Texas Avenue
College Station, TX 77842
Re: Engineering Cost Estimate
Proposed Stepping Stone School
205 Rock Prairie Road
College Station, Texas
Gessner Engineering Job No.: 11 -0152
Dear Mr. Norton:
Based on current estimations for direct material and direct labor costs, the prime
cost of the public infrastructure for the above referenced project•is estimated to
be $1,737. Values used to determine this estimate are included in the attached
table. This estimate does not include indirect costs due to overhead or indirect
manufacturing expenses.
Please contact us if you have any questions or if we can be of further assistance.
Sincerely, y - � � OF . TE E , q 1
GESSNER ENGINEERING, LLC F -7451 ,�P.••' • s
_ 1 Y l r ....... ' Q. • o
,.jV T ....
• Melissa P. Thomas, P.E. f ... 9g398•. ...
�Qi� Gessner
t �� pF•.ENS ��
t���`ION` =,,•" Engineering
2501 Ashford Drive
Attached: Probable Estimate of Public Sitework Construction Costs
Suite 102
College .Station, Texas 77 840
•
1:10. Box 10703, 77842
979.080.8840
fax 979.680.8841
2204 S. Chappell Hill Street
Brenham, Texas 77833
979.836.6855
tax 979.836,0847
Probable Estimate of Public Sitework Construction Costs
Stepping Stone School
Gessner Engineering, LLC
GE Job #11 -0152
WATER
Item Quantity Units Unit Cost Total
4" PVC Water Line 5 LF $ 32.00 $ 160.00
1.5" PVC Water Line 3 LF $ 18.00 $ 54.00
4" Gate Valve 1 EA $ 450.00 $ 450.00
4" Isolation Valve 1 EA $ 450.00 $ 450.00
8 "x4" Tapping Sleeve 1 EA $ 425.00 $ 425.00
4 "x1.5" Tapping Sleeve 1 EA $ 190.00 $ 190.00
Trench Safety 8 LF $ 1.00 $ 8.00
Sub Total - Water $ 1,737.00
0 Gessner Engineering