HomeMy WebLinkAboutLetter Acknowledging City Standards July 25, 2011
Mr. Josh Norton
City of College Station
1101 Texas Avenue
College Station, Texas 77842
Re: Letter Acknowledging City Standards
Stepping Stone School
205 Rock Prairie Road
College Station, Texas
Gessner Engineering Job No.: 11 -0152
Dear Mr. Norton:
The purpose of this letter is to acknowledge that the construction plans for the
water, sanitary sewer, streets and drainage for the above - referenced project, to
the best of my knowledge, do not deviate from the B /CS Design Guideline
Manual. Any alternate design or construction methodology that was used is
listed below:
1. Hanover Aqua -Loc permeable paving units in lieu of concrete paving
I also acknowledge, to the best of my knowledge, that the details provided in the
construction plans are in accordance with the Bryan /College Station Standard
Details.
Sincerely, �E�F T 0
• '..'s
GESSNER ENGINEERING t y� , ,1.- Gessner
• '
' Fsto Engineering
y 1 � ■ M ELt$$A P • . ,........
Melis P. T mas P.E. � I 9 8 39 + ,: 2501 Ashford Drive
!,� � �$j�A�,6'` Suite 102
/ College Station, Texas 77840
Je -- f y . Peters, P.E., C.F.M.
...74, P.O. P.O. Box 10763, 77842
..-70094 rF- ' 979.680.8840
* fax 979.680.8841
•.... EREMY N, EIS
• � � .o ' 021 .. ...... . . °
�' 7 O . �1/ 7 2204 S. Chappell Hill Street
O . CENSEO i •
It FS' ,. ** ..
�‘ `r �NALEN G � Brenham, Texas 77833
979.836.6855
fax 979.836.68� .. •
" \ & \\ -1. 2,1
aI.: 1