Loading...
HomeMy WebLinkAboutDomestic Water Report July 25, 2011 Mr. Stephen Maldonado Jr. City of College Station Water Services Department 1101 Texas Avenue College Station, TX 77842 Re: Domestic Water Report Stepping Stone School 205 Rock Prairie Road College Station, Texas Gessner Engineering Job No.: 11 -0152 Dear Mr. Maldonado: The peak water demand was calculated in accordance with the fixture count determination method. A total fixture unit count of 72 was determined for this building, and values are shown below in Table One. Fixture Number Load Total Factor Value Lavatory 11 2 22 Dishwasher 1 2 2 Washer (Clothes) 1 4 4 Shower 1 3 3 Water Closet,Tank 8 4 32 Operated Commercial Sink 3 3 9 (Service) Total 72 Table One: Fixture Units The peak water demand (based on 500 fixtures) for the domestic Gessner service line and meter is 125 gallons per minute, and the average Engineering water demand is 31 gallons per minute. The maximum continuous capacity of the 1.5" Sensus OMNI T water meter is 160 gallons per 2501 Ashford Drive minute, well over the expected peak demand. The specification sheet for the Sensus OMNI T water meter is attached. Suite 102 Please contact us if you have any questions or if we can be of further college station, Texas 77840 assistance. ���� P.O. Box 10763, 77842 ;� AEO F. r E 1 % Sincerely, j y t ..... NZ, j , 979.680.8840 GESSNER ENGINEERING, F -7451 * i � * ; fax 979.680.8841 (, n i MELISSA P TH MAS • Melissa P. homas, P.E. , 4 o,�;• ,4 E o.: •f 2204 S. Chappell Hill Street t ��� Kyle M. Zapalac, M.E., E.I.T. Brenham, Texas 77833 Ct 979.836.6855 i 44V1 fax 979.836.6847