Loading...
HomeMy WebLinkAboutEngineers Cost Estimate Engineer's Cost Estimate CALLAWAY SUBDIVISION (PHASE 3) PAVING IMPROVEMENTS COLLEGE STATION, BRAZOS COUNTY, TEXAS UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT COST COST PAVING IMPROVEMENTS 1 Mobilization, Construction Staking, All Required 1 LS $1,000.00 $1,000.00 Testing by Contractor & Trench Safety 2 SWPP Measures (Seeding, Silt Fencing, 1 LS $500.00 $500.00 Construction Entrance) 3 In -Place Earthwork Excavation (Roadway, Alleys, 50 CY $5.00 $250.00 Drainage Channels, Sitework, etc ) 4 In -Place Earthwork Embankment Finishing (Topsoil, Landsca 75 CY $8.00 $600.00 Berms & Miscellaneous) (Excavated On -Site) 5 4" Thick Reinforced Concrete Sidewalk (Includes 3,960 SF $4.50 $17,820.00 H/C Ramps & Drainage Flumes) . SUB -TOTAL = $20,170.00 co e r z s 4 ; 0 %4 6 , � ESTIMATED CONSTRUCTION COST = $20,170.00 * P . 10% CONTINGENCY = $2,017.00 "" o# GRAND TOTAL = $22,187.00 0 FL: i 1 • . MET ALF This Engineer's Cost Estimate was prepared in our a . . 4000714" 2 / office, at the date shown, and is released for the / — t 3 , ( purposed of public infrastructure cost projections. g w l� A t o RME Consulting Engineers a TEXAS FIRM REGISTRATION No. F -4695 �`''� POST OFFICE BOX 9253 • COLLEGE STATION, TEXAS 77842 Cipti112181a14/i21 OFF/FAX: (979) 764 -0704 r t E -mail: civil @rmengineer.com CD1- 178 - 0398- E01.xlsx 1 of 1