HomeMy WebLinkAboutLetter of Completion LETTER OF COMPLETION
CITY ENGINEER DATE: 747/1 I
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
RE: COMPLETION OF ar-e..t )v� 3
G•16iie-
Dear Sir:
The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station, Texas. This approval and acceptance by the City is requested in order that we
may finalize any subcontracts and to affirm their warranty on the work. This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project. A I,,
The one -year warranty is hereby affirmed and agreed to by �errPnre. M A (2Y ty
and by their subcontractors as indicated by signatures below.
WORK COMPLETED WARRANTY DATE
s rd ,A IC 7/2-7 j
Owner: j,aor 9.1t. (, ((c gritotAStontractor elt,uz5 -out P �s,LLC
Phone Number: 171. Q 26 ?o3fa Phone Number: '?7-2,Z4 — 707Z
Address: Pa tax We-5 Address: P o , fox 122- 0
C. 14, 51-1 7x 7 79ys — 6 /7 5 �%)c 77 i3 1 J 5
Signature: /I Signature:
ACCEPT: ''��#�'J�''PROVAL
A ��
ity Repre entative
1_PLAT FILED
r I OFFSITE ESMTS FILED
f/L� r� LI TEMP BLANKET ESMT FILED
Cit Engi eer .1 'N0 OTHER ESMTS NEEDED
Revised 1/31/07
1. Lis'"
12
. r
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No. 12327
1016 WELSH AVENUE BREEZY HEIGHTS ADDITION BLOCK 4, LOT 8R
Engineer's Estimate of Sidewalk Construction
Estimated
Item Description Unit I Unit Price I Total
Quantity
Sidewalk Pavement
1 Concrete Sidewalk - 4 thick SF 81 $ 3.70 1 $2,997
ct
2 ADA Ramps - Detectable Warning Surfaces EA $ 600.00 $600
Sidewalk Pavement Subtotal $3,597
Miscellaneous
3 Relocation of Traffic Signal Box 1 EA 11 $ 1,000.00 1 $1,000
— LS 1 $ 200.00 $200
4 SWPPP Implementation & Maintenance � -�-
--__ —Traffic LS 1 $ 500.00 $500
5 Control -1- - - - - -- I -- -
_ $310
6 Silt Fence I LF 1241 $ 2.50
Misc. Subtotal I $2,010
11 11 ESTIMATED CONSTRUCTION $5,6071
o pt imuri
of
*/•
.psi t..
It JOSEPH P. SCHULTZ
65889 • 1
esoitbi ,m 4
■," 3.1°
F -12327
SCHULTZ ENGINEERING, LLC.
1
• .
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No. 12327
1016 WELSH AVENUE BREEZY HEIGHTS ADDITION BLOCK 4, LOT 8R
Engineer's Estimate of Sewer Construction
Item Description Unit Estimated j Unit Price Total
Quantity !
Sanitary Sewer
Long Sewer Service EA 1 $650
$ 650.00
2 4 Short Sewer Service EA 1 ! $ 400.00 ; $400
Sanitary Sewer Subtotal; $1,050
II ESTIMATED CONSTRUCTION] $1,0501
/ * i 'N.** _
*_
JOSEPH P. SCHULTZ
I t 65889 '
s
:1- . •
44
F -12327
SCHULTZ ENGINEERING. LLC.