Loading...
HomeMy WebLinkAboutGrading PlanRESIDENCE 0 250 OO \� _� = 2 247.00 O y N O� N k� 20' PUBLIC UTILITY AND DRAINAGE EASEMENT %% \ 61 l \ ` Qi � I (P \ � I \ 0- N \ / tp 4� o \ / ni 41 O GEOTEXTILE GEOTEXTILE ANCHORAGE TRENCH METAL, WOOD, BACKFILL WITH TAMPED OR SYNTHETIC I NATURAL SOIL POST OR STAKE - G�` F� R � Z SUPPORT POST ' ANCHORAGE VARIES FROM SITU SOIL TO CEMENT MORTAR NOTE: CONTRACTOR TO INSTALL 3.Om OF SILT FENCE PER 30.Om OF TRENCH LINE AND AS SHOWN ON PLAN/ PROFILE SHEETS TYP. SILT FENCE DETAIL — SF ITS OF \ S il T FENCE DTL. 100 YR FLOODPLA G IN \ 248.27 I 1 IS f \ o IIPMENT PAD \ y <� _EV.247.50 N N N N \ 4 0) (n P LI MITS OF FILL AREA ss \� \ N.T.S. I 6 I DETAIL l� ° 2p, E WFR E'�SFAlEN POOI L DECK POOL DECK REINF. #3 (a) 18" O.C.E.W. EXPANSION JOINT 5 ' - 6 " MAX POOL 3' -6" MIN )UTFALL FL 240.00 EXISTING m---- \� 1. CONTRACTOR TO BE RESPONSIBLE FOR EROSION CONTROL DURING AND AFTER CONSTRUCTION. CONTRACTOR SHALL INSTALL EROSION AND SILT CONTROL MEASURES AS REQUIRED DURING CONSTRUCTION AND SHALL REMOVE TEMPORARY MEASURES WHEN PERMANENT COVER IS ESTABLISHED. 2. ALL EARTHENED AREAS DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE REGRADED, SEEDED, AND FERTILIZED. 3. FILL OPERATIONS ARE TO BE ACCOMPLISHED BY PLACING MATERIAL IN 6 INCH (LOOSE MEASURE) LIFTS AT ±2 OF OPTIMUM MOISTURE CONTENT AND COMPACTED TO 95% DENSITY AS DETERMINED BY ASTM 0698 (STANDARD PROCTOR). 4. SELECT BORROW MATERIAL FOR FILL OPERATIONS SHALL HAVE A PLASTICITY INDEX (PI) OF 8 TO 20. 5. MAXIMUM CUT OR FILL SLOPES ARE NOT TO EXCEED 4 FT. HORIZONTAL TO 1 FT. VERTICAL. 6. CONTRACTOR SHALL SUBMIT TO THE CITY OF COLLEGE STATION, FOR APPROVAL, AN ELEVATION CERTIFICATE OF FINISH ELEVATION FORMWORK DURING CONSTRUCTION PRIOR TO POURING CONCRETE. 7. POST CONSTRUCTION CONTRACTOR SHALL SUBMIT -AN ELEVATION CERTIFICATE TO CITY ENGINEER FOR APPROVAL PRIOR TO THE ISSUANCE OF THE CERTIFICATE OF OCCUPANCY. 8. OWNER SHALL BE RESPONSIBLE FOR REPLACING ANY PRIVATE PAVING OR INFASTRUCTURE LOCATED WITHIN THE EXISTING UTILITY EASEMENT IN THE EVENT THE CITY OR CITY'S REPRESENTATIVE MUST REMOVE SUCH IMPROVEMENTS IN ORDER TO ACCESS THE PUBLIC UTILITY. SITE PLAN �RF LEGEND IRF = IRON ROD FOUND FL = FLOWLINE G = GROUND P = TOP OF PROPOSED DECK TG = TOP OF GRATE T = TOP OF EXISTING PATIO GRAVEL O CONCRETE 4 ' -0" 1 SELECT BACKFILL SEE NOTES 10% MAX SLOPE 1' \CV \ \\ *. LL' w N o U) C E � o N E a Q ° w (o m E Ld �' = ° W N O U •- I rn CD V) -L r v) 00 W O r- � U � N N Q ') N 1 O .- N a (n Z 0 3 U W E ) o O O U 7E ' 00 0 cfl (� 5 ° Z5 � .. O ( sl t O LL U 3 x o M W O U / �. ) = Cn Z E C° / rr 0 ° ° U 0:0 p Q 0� < I- CD ^ rn o Z N.T.s. 3 wL r7 t U) o[ � 'n r'o �r °° ° o F a =o WU) z W W xW z m o �� N� rn r z 5 Z o LJ lJ z U) ¢° x ._ THERS LJ W LLJ m € POOL COPING y U N J __j a ■ U N N ■ O N � a G EXPANSION JOINT 5 ' - 6 " MAX POOL 3' -6" MIN )UTFALL FL 240.00 EXISTING m---- \� 1. CONTRACTOR TO BE RESPONSIBLE FOR EROSION CONTROL DURING AND AFTER CONSTRUCTION. CONTRACTOR SHALL INSTALL EROSION AND SILT CONTROL MEASURES AS REQUIRED DURING CONSTRUCTION AND SHALL REMOVE TEMPORARY MEASURES WHEN PERMANENT COVER IS ESTABLISHED. 2. ALL EARTHENED AREAS DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE REGRADED, SEEDED, AND FERTILIZED. 3. FILL OPERATIONS ARE TO BE ACCOMPLISHED BY PLACING MATERIAL IN 6 INCH (LOOSE MEASURE) LIFTS AT ±2 OF OPTIMUM MOISTURE CONTENT AND COMPACTED TO 95% DENSITY AS DETERMINED BY ASTM 0698 (STANDARD PROCTOR). 4. SELECT BORROW MATERIAL FOR FILL OPERATIONS SHALL HAVE A PLASTICITY INDEX (PI) OF 8 TO 20. 5. MAXIMUM CUT OR FILL SLOPES ARE NOT TO EXCEED 4 FT. HORIZONTAL TO 1 FT. VERTICAL. 6. CONTRACTOR SHALL SUBMIT TO THE CITY OF COLLEGE STATION, FOR APPROVAL, AN ELEVATION CERTIFICATE OF FINISH ELEVATION FORMWORK DURING CONSTRUCTION PRIOR TO POURING CONCRETE. 7. POST CONSTRUCTION CONTRACTOR SHALL SUBMIT -AN ELEVATION CERTIFICATE TO CITY ENGINEER FOR APPROVAL PRIOR TO THE ISSUANCE OF THE CERTIFICATE OF OCCUPANCY. 8. OWNER SHALL BE RESPONSIBLE FOR REPLACING ANY PRIVATE PAVING OR INFASTRUCTURE LOCATED WITHIN THE EXISTING UTILITY EASEMENT IN THE EVENT THE CITY OR CITY'S REPRESENTATIVE MUST REMOVE SUCH IMPROVEMENTS IN ORDER TO ACCESS THE PUBLIC UTILITY. SITE PLAN �RF LEGEND IRF = IRON ROD FOUND FL = FLOWLINE G = GROUND P = TOP OF PROPOSED DECK TG = TOP OF GRATE T = TOP OF EXISTING PATIO GRAVEL O CONCRETE 4 ' -0" 1 SELECT BACKFILL SEE NOTES 10% MAX SLOPE 1' \CV \ \\ *. LL' w N o z O a w (o m Ld = a U (n Q rn CD � r v) 00 W O 3 Y \\ \ \ \� \ \\ \ � o �° \ , \\ V / \ \ ' \\ \�. " \ \,' \\ \ \� \ \// \ \ RIVER ROCK FILL �\ \ `\ \ \ NATURAL GROUND / ii / / / / / / /// `"`� / ED PIPE \ CHAD EMMEL \ / / ' \ \ / /� ; /.. d \ / \ /\ / \/ `: \ / \�� \ \ \��� \ \ /\. / \ \� PERFORAT \ / \/ /\ '`\ / \.... ;. ......:......,...,:..... r .... \\ / \ / \\ /� \ / \ \ BY OTHERS /\ �\ j -o= 103495 • � � / / x �� 0\' �>/\ I > m 90 & m Fe ll 10LF4" PVC PIPE 11 LF 4." PVC PIPE G 240.80 r FL 240.30 12 LF 4" PVC PERFORATED PIPE �s `Kl11119 W G FL 240.261 I . FL 240.30 G 24_O. 6- \ G.240.80 / ss G 243.50 y am \ 20 LF 4" PVC 13 LF 4" PVC PERFORATED PIPE mss PERFORATED PIPE 1 11 = 1o1 4 GRAVEL UNDERDRAIN LAYOUT N.T.S. I Z G 342.601 21 LF 4" PVC PIPE 7 LF 4" PVC PIPE FL 242.56 G 243.05 G 243.50 IMry E IF C OMPLIANC g ,, Ji SEP Moll COLLEGE 51 "ATION - ENGINEERIN 71 ;r \ I . ! %t V Iff