Loading...
HomeMy WebLinkAboutLetter of Completion LETTER OF COMPLETJON CITY ENGINEER DATE: 84:!1 1,. __.. CITY OF COLLEGE STATION COLLEGE STATION, TEXAS RE: COMPLETION OF SaCtAILIK-- Dear Sir: The purpose of our letter is to request that the following fisted improvernenls he approved and accepted as being constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station, Texas. 1 his approval and acceptance by the City is requested in order that we may finalize any subcontracts and to affirm their warrenty on the work, This approval and accepter by the City of the improvements listed below dues hereby void the letter of guarantee fcir the listed improvements on the above referenced project. The one -year warranty is hereby affirmed and agreed to by,, 4Cg�_____ `PL and by their subcontractors as indicated by signatures below WORK COMPLETED WARRANTY DATE ff ( Owner, f 6tT%S In Corrtrac#or: t - �' `- --t '`'C► Vice �CS� Phone Number. Ilgr 6; g01 -- 6951 Phone Number: 9 '79 -S - 3 7' 6 "2... Address: 1 1 JG filet St Address: 1 r7. 1 Y' Soilt 3oa 77154a Signatur : Signature: Vt..../642EAP Vrce rresVefel 62"1.411t6 ACCEPTANCE & APPROVAL - I City Representative s "I1 C" Engineer ^� nowse;d litttt;Y - ( T.- --)/J --) PLAT FILED OFFSITE ESMTS FILED TEMP BLANKET ESMT FILED ir NO OTHER ESMTS NEEDED ESTIMATE OF PROBABLE COST Post Oak Village / Post Oak Square Public Sidewalk Improvements JC PROJECT NO. C0007 -007 Estimated ITEM NO. Quantity DESCRIPTION UNIT PRICE AMOUNT BASE BID - WATERLINE General Overhead for all Work Including 1 1 LS Mobilization, Bonds, Insurance, and Related $756.00 $756.00 Items 2 457 LF Sidewalk $6.00 $2,742.00 TOTAL: $3,500.00 � of rEkst * . -.- . * � + t i STEVE E. DUNCAN / O .13".. 13 . < 83252 •1. • 11 01° -- ( , NOTES: 1. This estimate represents my best judgment as a design professional familiar with the construction industry. Jones & Carter, Inc. has no control over the cost of labor, materials, or equipment; over the Contractor's methods of determining bid prices; or over competitive bidding or market conditions. Accordingly, we cannot and do not guarantee that bids will not vary from this cost estimate. •