HomeMy WebLinkAboutLetter of Completion LETTER OF COMPLETJON
CITY ENGINEER DATE: 84:!1 1,. __..
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
RE: COMPLETION OF SaCtAILIK--
Dear Sir:
The purpose of our letter is to request that the following fisted improvernenls he
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station, Texas. 1 his approval and acceptance by the City is requested in order that we
may finalize any subcontracts and to affirm their warrenty on the work, This approval
and accepter by the City of the improvements listed below dues hereby void the letter
of guarantee fcir the listed improvements on the above referenced project.
The one -year warranty is hereby affirmed and agreed to by,, 4Cg�_____ `PL
and by their subcontractors as indicated by signatures below
WORK COMPLETED WARRANTY DATE
ff (
Owner, f 6tT%S In Corrtrac#or: t - �' `- --t '`'C►
Vice �CS�
Phone Number. Ilgr 6; g01 -- 6951 Phone Number: 9 '79 -S - 3 7' 6 "2...
Address: 1 1 JG filet St Address: 1 r7. 1 Y'
Soilt 3oa 77154a
Signatur : Signature: Vt..../642EAP
Vrce rresVefel 62"1.411t6
ACCEPTANCE & APPROVAL
- I
City Representative
s "I1
C" Engineer ^�
nowse;d litttt;Y - ( T.-
--)/J
--) PLAT FILED
OFFSITE ESMTS FILED
TEMP BLANKET ESMT FILED
ir NO OTHER ESMTS NEEDED
ESTIMATE OF PROBABLE COST
Post Oak Village / Post Oak Square
Public Sidewalk Improvements
JC PROJECT NO. C0007 -007
Estimated
ITEM NO. Quantity DESCRIPTION UNIT PRICE AMOUNT
BASE BID - WATERLINE
General Overhead for all Work Including
1 1 LS Mobilization, Bonds, Insurance, and Related $756.00 $756.00
Items
2 457 LF Sidewalk $6.00 $2,742.00
TOTAL: $3,500.00
� of rEkst
* . -.- . * � + t i
STEVE E. DUNCAN /
O .13".. 13 . < 83252
•1. • 11
01° -- ( ,
NOTES:
1. This estimate represents my best judgment as a design professional
familiar with the construction industry. Jones & Carter, Inc. has
no control over the cost of labor, materials, or equipment; over
the Contractor's methods of determining bid prices; or over
competitive bidding or market conditions. Accordingly, we cannot
and do not guarantee that bids will not vary from this cost
estimate.
•