Loading...
HomeMy WebLinkAboutDevelopment Permit '.% DEVELOPMENT PERMIT • ;i' PERMIT NO. 11 -65 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA C�7S oFCOLLEGEstACION Pwmmox r:r(opmn�t Srrr. +ire RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE 4 SITE LEGAL DESCRIPTION: SITE ADDRESS: H.F. Krenek Phase 1 2319 Texas Avenue South Lot 1 & 2 DRAINAGE BASIN: (Tire Max Site Plan) Main Bee Creek DATE OF ISSUE: June 22, 2011 VALID FOR 24 MONTHS OWNER: CONTRACTOR: Tire Max c/o Duncan Jappy w/ Interplan (see below° 604 Courtland Street, Suite 100 Orlando, FL 32804 TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work of any kind may start until a Development Permit is issued. 2. No work beyond limits covered in permit is authorized. 3. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re- issued. 4. Development shall not be used or occupied until Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -pour) and post construction. 7. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in compliance with all necessary State and Federal Permits. 8. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 9. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the Contractor's responsibility to implement measures that will meet City, State, and Federal requirements. 10. All disturbed areas will be re- vegetated prior to Letter of Completion or Certificate of Occupancy. 11. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. 12. All construction shall be in accordance with the stamped approved plans and specifications for the above -named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed. 13. Special Conditions: * *TCEQ Phase II Rules In Effect ** I,('M://0 Erirv" — /5 - ,//Fug ( the Contractor, hereby agree to comply with all conditions herein. r af . Contractor Dat I hereby grant this permit for development. Contact , the Public Works Inspe - ..ned to thi : oject 24 hours prior to beginning construction for scheduling required Inspections. Engineer /Representative ' Date DEVELOPMENT PERMIT ' ( PERMIT NO. 11 -65 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA crls or.CoLLaLSArION Pknnixg 4 ^(klrLopmnu Smvirn RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: H.F. Krenek Phase 1 2319 Texas Avenue South Lot 1 & 2 DRAINAGE BASIN: (Tire Max Site Plan) Main Bee Creek DATE OF ISSUE: May 24, 2011 VALID FOR 24 MONTHS OWNER: C • . - ACTOR: Tire Max c/o Duncan Jappy w/ Interplan (see below° 604 Courtland Street, Suite 100 Orlando, FL 32804 TYPE OF DEVELOPMENT: Full Develo• ent Perm CONDITIONS: 1. No work of any kind may start until a Develop ent Permit is issued. 2. No work beyond limits covered in permit is a orized. 3. The permit may be revoked if any false stat: ments are made herein. If rev• ed, all wo must cease until permit is re- issued. 4. Development shall not be used or occupi:d un 'I Certificate of Occupancy is issue. 5. The permit will expire if no significant w• k is pr.• ressing within 24 months of issuanc - 6. If required, Elevation Certificates will b: provide. ith elevations certified during con .truc ion (forms at slab pre -pour) and post construction. 7. Other permits may have been re• ired to fulfill al, state and federal equi ements. Construction will be in compliance with all necessary State : nd Federal Permi . 8. Stormwater mitigation, including de -ntion ponds will be c• structed first in t e co - truction sequence of the project. 9. I n accordance with Cha • . • e Code of Ordinances • the City of • Ileg - tation, measures shall be taken to insure that all debris from constructs.., erosion, and sedimen tion shal not be deposited in city streets, or existing drainage facilities. Construction Site No ' e or Notice of Intent ( 'I) ale g with Stormwater Pollution Prevention Plan (SWP3) wi I be kep -nd maintained on -ite during construction - per TPDES permitting requirements. If it is determined hat the p . scribed erosion co 'trot measures are ine -= tive to retain all sediment on -site, it is the Contractor's r: sponsibilit to implement meas es that will meet City Sta and Federal requirements. 10. All disturbed a -as will be -vegetated prior to L etter of Completion •r Certificate of Occupancy. 11. All trees require. to be prote, ted as part of the I- dscape plan m .t be completely barricaded in accordance with the Landscaping and , ree Protec •n Section of the •'ty's Unified De elopment Ordinance, prior to any operations of this permit. The cleanin of equipm -.t or materials wit in the drip line of any tree or group of trees that are protected and required to remain i- strictly proh'•ited. The disposal of any aste material such as, but not limited to, paint, oil, solvents, asphalt, con, rete, mortar, •r other harmf I liquids or materials within the drip line of any tree required to remain is also prohibite• 12. All construction shall be 'n accordance ith the st- mped approved plans and specifications for the above -named project and all of the code and ordinanc- of the •ity of College Station, as well as State and Federal Regulations that apply. Only those de 'ations from Bt. Uni ed Design Guidelines, Specifications and Details specifically requested and approved will b- allowed. 13. Spec - Conditions: **T , EQ Ph: se II Rules In Effect** I, GO...0A a SO"wO: --` 1 'I , the Contractor, hereby agree to comply with all conditions herein. (, - I — I( C • ntrac ,• Date I hereby • ant this permit for development. Contact ✓yy A rr 67Y)53-41,-C-0C 'Yn.� the Public Works Ins. - - : signed to this project 24 hours prior to begirding c structi®h for scheduling required Inspections. • y Engineer /Representative Date