HomeMy WebLinkAboutApplication FOR OFFICE U • LY
CASE NO.:
. � •
DATE SUBMI ED : /
CITY OF COI I.I :GE STATION TIME: O
Home of Texas AdM University' STAFF:
DEVELOPMENT PERMIT APPLICATION
MINIMUM SUBMITTAL REQUIREMENTS:
$600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 0.75%
of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due
prior to the issuance of any plans or development permit).
❑ Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
p Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
❑ Notice of Intent (NOI) if disturbed area is greater than five (5) acres cumulatively.
Date of Optional Preapplication or Stormwater Management Conference NIA
SPECIAL FLOOD HAZARD AREA? ❑ Yes p No
(Zone A or Zone AE on FEMA FIRM panels)
NAME OF PROJECT West District - United Methodist Church
ADDRESS 4201 State Highway 6, South - College Station, TX 77845
LEGAL DESCRIPTION (Lot, Block, Subdivision) Lot 1 & 2 - Barron Park Subdivision
APPLICANT / PROJECT MANAGER'S INFORMATION (Primary contact for the project):
Name RME Consulting Engineers (c% Rabon Metcalf) E -mail rabon@r mengineer.com
Street Address P.O. Box 9253
City College Station State TX Zip Code 77842
Phone Number ( 764 -0704 Fax Number ( 764 -0704
PROPERTY OWNER'S INFORMATION:
Name Christ United Methodist Church E -mail
Street Address 4203 SH 6, South
City College Station State TX Zip Code 77845
Phone Number Fax Number
ARCHITECT OR ENGINEER'S INFORMATION:
Name Same As Applicant E -mail
Street Address
City State Zip Code
Phone Number Fax Number
1/10
Page 1 of 4
i//0 11:36 9796906098 CUMC PAGE 03
JUL- 9 -20i0 11:85A FROM:W C979C764 -1428 TO:9650609B P.3'5
CERT1FICATIONS REQUIRED FOR ALL DEVELOPMENT
• Ou+ner Certification:
1. No work of any kind moy stem until a permit is Newel.
2, The permit may be revoked If shy false statements are made herein.
3. If revoked, ell work must cease unfit permit is redseued.
A. Dsvalopmene shall not be used or occupied until a Certillcate of Occupancy is Issued.
6. The permit will expke lino significant work Is progreestr>Ag Whin 24 months of issuance.
6. Other permits may be nequtted to fulfil local, Mete, and federal requirements. Warner will obtain or show
• oompkencc with ell necessary State end Federal Permits prior to construction.
7. If requited, Elevation CeRMlcates will be provided with eletimAons certified during constntotlon (forms at slab pre-
-
.
p010) end post construction.
8. Ovmer hereby gives consent to City representatives to melee reasonable Inspootlone required to verify
compliance. •
8. If, starnwatermlllgetbn le required, including detention panda proposed ea part of this project, 11 shah be
deelgned and constructed first In the construction sequence of the project,
10. In accordance with Chapter 13 dew, Rode of Ordinances of the City et College Shallop, measures shag be taken
to incurs that all debar from construction, erosbn, end sedmentation shell not be deposlted In city streets, of
eodelbtg drainage faclfillea. All development she be in accordartee with the Piens and specifications submitted to
and approved by the City Engineer for the above named project. Ail of the applicable oodea end ordinances of the
City of College Station shall apply. t doctonentavdli comply with the 11. The information and concIons contained In the attached pions and supporting �
current requirements of the City of College Station, Texas City Code, Chapter 13 and aasoolMed BCS Unified
Dnr)gn Guidelines Technics! Specifications, and Stsnderd Details. All detotopmant hes been destined in •
accordance with as applicable code* end ordinances of the City of College Station and Slate and Federal
Reputations.
12. Release of plans to ME Consurtirng Engineers (name qr firm) is authorized for bidding purposes
only. 1 understand that lne l approval end Meese of plena and development for con*ucIton la contingent on
co actor signature on approved Development Penrne.
13, I, 14E 0V44ER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
H EV E PERMIT ApPLICATiON, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
A
W 1
Property e) Date
Engineer dertlft4ation:
1. The project has been designed to ensure that etortnwater mitigation, indudktg detention ponds, proposed no part
of the pleat vdA bo constructed Aral In the construction sequence.
2. I wll obtain of can edtow compliance teeth all necessary Lord, Mate and Federal Pantile prior to conetnictton,
3. The Infometlon and conckletone contained to the attached plans and supposing dgcuntents comity with the
current rogidroments of the City of Cottage Staten. Taos city Code, Chapter 13 and saeo fated BM Unified '
Cosign Guideline. All development hes been destined in accordance with ell applicable codes and or mantes
of the City of College Station and State and Federal Regulatlone AND MEN
4. 1, THE ENGINEER,
DevELO AGREE P TO M A , ARE, TO T BEST HEREIN, MY INOWLE G , TRUE AND
Sjo
Engineer Dive
uro, Popo2of4
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued.
2. The permit may be revoked if any false statements are made herein.
3. If revoked, all work must cease until permit is re- issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction.
7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post construction.
8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply.
11. The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
12. Release of plans to RME Consulting Engineers (name or firm) is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE.
Property Owner(s) Date
Engineer Certification:
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction.
3. The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations.
4. I, THE ENGINEER, AGREE TO AN */ ERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS
FOR THE DEVELOPMENT PERM / ► APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACC TE.
7/3/0
Engineer Date
Page e 2 of 4
1/10
The following CERTIFICATIONS apply to development in Special Flood Hazard Areas.
Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only
Permits:*
A. I, Rabon A. Metcalf, P.E. certify, as demonstrated in the attached drainage study, that the
alterations or development covered by this permit, shall not:
(i) increase the Base Flood elevation;
(ii) create additional areas of Special Flood Hazard Area;
(iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway
and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can
also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or
areas where the depth of from the BFE to natural ground is 18 inches or greater;
(iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond
the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than
one foot per second without acceptable compensation as set forth in the City of College Station Code of
Ordinances, Chapter 13 conceming encroachment into the Special Flood Hazard Area; nor
(v) increase Base Flood velocities.
b- mpted by dinance in Section 5.11.3a of Chapter 13 Code of Ordinances.
7/6/`
Engineer Date
Initial
* If a platting- status exemption to this requirement is asserted, provide written justification under separate
letter in lieu of certification.
Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits:
B. 1, Rabon A. Metcalf, P.E. , certify to the following:
(i) that any nonresidential or multi - family structure on or proposed to be on this site as part of this application is
designed to prevent damage / the structure or its contents as a result of flooding from the 100 -year storm.
7 "7/5 /o
Engineer Date
Additional certification for Floodway Encroachments:
C. I, Not Applicable , certify that the construction, improvement, or fill covered by this
permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments.
Engineer Date
1/10 Page 3 of 4
Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate
required).
Residential Structures:
D. I, Not Applicable , certify that all new construction or any substantial improvement
of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an
elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with
elevations certified during construction (forms at slab pre -pour) and post construction.
Engineer / Surveyor Date
Commercial Structures:
E. 1, Not Applicable , certify that all new construction or any substantial improvement
of any commercial, industrial, or other non - residential structure are designed to have the lowest floor, including all
utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation
Engineer / Surveyor Date
OR
I, Not Applicable , certify that the structure with its attendant utility, ductwork,
basement and sanitary facilities is designed to be flood - proofed so that the structure and utilities, ductwork,
basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all
areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the
hydrostatic and hydrodynamic conditions.
Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post construction.
Engineer / Surveyor Date
Conditions or comments as part of approval:
Print Form 1
1/10
Page 4 of 4