HomeMy WebLinkAboutLetter of Completiona
DATE: 4J 2-
RE COMPLETION OF
_i2 �i< fxferaY Gk
Dear Sir:
The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station, Texas, This approval and acceptance by the City is requested in order that we
may finalize any subcontracts and to affirm their warranty on the work. This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project.
The one-year warranty is hereby affirmed and agreed to by (2,0c_
and by their subcontractors as indicated by signatures below,
WORK COMPLETED WARRANTY DATE
( uys, r OCS, r1t c_r U. 0-f .C-
Owner. 1 : 4 ' Fa2 Oc 5 r.
57 VA i�
Phone Number: 6 f ro 9 f � 2—
Address:
7 7
a g n, a tur e.
I
ACCEPTANCE & APPROVAL
y ReppresE
A it E-ngin er
E t l
Revised 1/31107
Contractmd UJ C'r-j
Phone Number: -3 Co
Address:
Signature:
at TE I=FILED
B LANKET = F
KE T E I
::n2NO OTHER ESMTS NEEDED
Engineer's Cost Estimate
WEST DISTRICT - UNITED METHODIST CHURCH
SANITARY SEWER IMPROVEMENTS
LOT 1 & 2 - BARRON PARK SUBDIVISION
COLLEGE STATION. BRAZOS COUNTY, TEXAS
Z -I U I AL = Z014,000.UU
TOTAL = $14,000.00
10% CONTINGENCY = $1,400.00
GRAND TOTAL = $14,000.00
DEVELOPMENT PERMIT (3/4 %) = $105.00
Minimum Development Permit Fee = $600.00
This Engineer's Cost Estimate was prepared in our office, at the date shown, and is released for the purpose of
public infrastructure cost projections.
8 9
--"-
f�ny �vtg�r►ee.3^s
r
/ * .
0
� '�� C CF NtiL � �i
RME Consulting Engineers
Texas Registration Firm No. F- 004695
P.O. Box 9253
College Station, TX 77842
Off/Fax: (979) 764 -0704
Email: civil @rmengineer.com
CD1- 255 - 0404- E01.xlsx 1 of 1
UNIT
TOTAL
NO.
DESCRIPTION
QUANTITY
UNIT
COST
COST
SANITARY SEWER IMPROVEMENTS
1
Mobilization, Staking, Trench Safety & TV Inspection
1
LS
$1,500.00
$1,500.00
(Sewer Line)
2
6" PVC Sanitary Sewer (SDR -26, D3034) - Non
500
LF
$24.00
$12,000.00
Structural Backfill
3
Tie Into Existing Manhole
1
LS
$500.00
$500.00
Z -I U I AL = Z014,000.UU
TOTAL = $14,000.00
10% CONTINGENCY = $1,400.00
GRAND TOTAL = $14,000.00
DEVELOPMENT PERMIT (3/4 %) = $105.00
Minimum Development Permit Fee = $600.00
This Engineer's Cost Estimate was prepared in our office, at the date shown, and is released for the purpose of
public infrastructure cost projections.
8 9
--"-
f�ny �vtg�r►ee.3^s
r
/ * .
0
� '�� C CF NtiL � �i
RME Consulting Engineers
Texas Registration Firm No. F- 004695
P.O. Box 9253
College Station, TX 77842
Off/Fax: (979) 764 -0704
Email: civil @rmengineer.com
CD1- 255 - 0404- E01.xlsx 1 of 1
Wes+
SOP: Filing of Final Plats - Letters of Completion 10/07/10
Engineering Inspector /Date: 5-/ CC X/
Project Engineer /Date: J
DP Number: 6
- Inspectors shall acquire written (i.e. email) punchlist comments and subsequently written
confirmation from the following contacts before forwarding Letter of Completion to development
review engineer:
Eros' /Drainage: Donnie Willis (0: 764 -6375, C: 229 -7632)
Water Services - General: Charles "Butch" Willis (0: 764 -3435, C: 777 -1202)
■ Water - coordinate fire flow analyses (or the design engineer for non -city utilities)
and confirm test results meets min requirements with the dev review engineer
(specific hydrants to test, if simultaneous, and min allowable flow)
■ Sanitary
Water Service — Liftstation: Doug Wallace (0: 764 -6333)
� S Electric and Streetlights: Gilbert Martinez (0: 764 -6255)
TU Electric and Streetlights: Sonia Creda (0: 821 -5770)
John Fontinoe or Randy Trimble (0: 821 -5728)
firm with development review engineer that service agreement is in place with BTU
Non -City Utility Service Providers: (Wellborn Water SUD, Brushy Creek SUD, Wickson
Creek SUD, etc) confirm with development review engineer that infrastructure is complete
,_- outstanding issues,
o D' ' , onstrution Pictures: From contractor on CD -R, Inspector to confirm and file
ecord Drawings: (2 Red -Lined Copies) for all Public Infrastructure with the
following attestation:
% %I, , General Contractor for development, certify that the
improvements shown on this sheet were actually built, and that said improvements are
shown substantially hereon. I hereby certify that to the best of my knowledge, that the
materials of construction and sizes of manufactured items, if any are stated correctly
hereon."
General Contractor
o cord Drawings: (2 Red -Lined Copies) for Public Drainage Infrastructure including
Private Detention Facilities with the following attestations:
"I hereby attest that I am familiar with the approved drainage plan and associated
construction drawings and furthermore, attest that the drainage facilities have been
constructed within dimensional tolerances prescribed by the Bryan & College station
Unified Stormwater Design Guidelines and in accordance with the approved construction
plans or amendments thereto approved by the City of College Station."
(affix seal) Licensed Professional Engineer
State of Texas No.
"I certify that the subdivision improvements shown on this sheet were actually built, and
that said improvements are substantially as shown hereon. I further certify, to the best of
my knowledge, that the materials of construction and sizes of manufactured items, if any,
are stated correctly hereon."
General Contractor
L- Inspectors to review Red -lined Record Drawings, upon acceptable confirmation of drawings,
inspector to:
o file one set of Record Drawings in Public Works files, and
o forward one set of Record Drawings to Jeffery Speed (CSU)
c,_�!pectors should forward Letters of Completion to the development review engineer that
reviewed and stamped the construction plans after confirming:
• the date on the Letter of Completion Warranty should reflect the date when all associated
punchlist items are completed, and
• the Owner is shall be listed as the one affirming the one -year warranty
L., evelopment review engineer to:
• Add Dev Permit Number to Letter of Completion
• stamp the Letter of Completion to confirm by initialing that the final plat is filed (or mylar
is ready to be filed), all necessary easements (including offsite) have been filed, and
blanket easement issues are resolved, and
• initial and route the Final Plat mylar for filing. (Note if the developer provided surety the
plat it may have been filed ahead of construction.)
-' 11e' borah Grace - Rosier (Planning) to file the Final Plat utilizes a coversheet to confirm:
• infrastructure is accepted by Letter of Completion —or- Surety is provided and acceptable,
• signed and notarized mylar of final plat,
• parkland dedication has been paid,
• digital file of final plat is provided,
• a current paid tax certificate has been submitted,
• sidewalk fee in lieu paid (if applicable), and
- velopment review engineer, upon the filing of Final Plat, stamp the Letter of Completion
with the new stamp and verify- initial -n /a the Final Plat was filed, offsite easements have been
filed, we have all necessary easements, etc - and then forward the Letter of Completion to Alan
Gibbs (City Engineer) for final signature.
Carol (Sr. Asst. City Engineer) to:
o enter the engineer's estimate and Letter of Completion date into Inspection List
o forward hard original of finalized Letter of Completion to Mandi Alford (P &DS).
- Mandi to: verify
• signatures on the Letter of Completion,
• forward scanned copy of Letter of Completion and associated Engineers Estimate to the
owner, developer, contractor, Terry Boriskie (Building), Ben McCarty (Building), Janet
Dudding (Accounting), Jeffery Speed (CSU), Stephen Maldonado Sr. (CSU), Diane
Broadhurst (CSU), Charles "Butch" Willis (CSU), Sue Hosea (CSU), Carol Cotter
(Engineering), Alan Gibbs (Engineering) and Deborah Grace - Rosier (Planning),
• if don't have email addresses, mail copies to the owner and contractor, and
• place the original in Development Permit file.
- Deborah to place a hard copy of the Letter of Completion in the associated Planning Final Plat file.