Loading...
HomeMy WebLinkAboutDrainage ReportDrainage Report for Saddle Creek Subdivision, Phase 9 Brazos County, Texas October, 2011 Engineer.- Schultz Engineering, LLC TBPE Firm No. 12327 P.O. Box 11995 College Station, TX 77842 2730 Longmire Drive, Suite A College Station, Texas 77845 (979) 764 -3900 Developer. Saddle Creek Partners, Ltd. 4440 Bentwood Drive College Station, Texas 77845 Phone: (979) 690 -2642 Saddle Creek Subdivision, Phase 9 Drainage Report ENGINEER SCHULTZ ENGINEERING, LLC. P.O. Box 11995 College Station, Texas 77842 Phone: (979) 764 -3900 Fax: (979) 764 OWNERIDEV Saddle Creek Partners, Ltd. 4440 Bentwood Drive College Station, Texas 77845 Phone: (979) 690 -2642 GENERAL DESCRIPTION AND LOCATION Location: Saddle Creek Subdivision, Phase 9, is located on the south west side of FM 2154, off of Stousland Rd. Description: • Area: • Proposed Land Use • # of Lots: • Existing Land Use: • Land Description: Primary Drainage Facility: Flood Hazard Information: FEW FIRM: Floodplain: 32.032 acres Single Family Residential 24 lots Vacant The terrain slopes towards the south. Boggy Creek # 48041C200 -C & # 48041C215 -C (July 2, 1992) Un- shaded Zone X HYDROLOGIC CHARACTERISTICS The existing site is predominately wooded. The elevations range from 256 to 283, sloping generally in a southerly direction. The runnoff enters tributaries of Boggy Creek. GENERAL STORMWATER PLAN The drainage plan for this development will involve the construction of ditches and the installation of culverts. DRAINAGE DESIGN General Information: Stormwater runoff from Phase 9 of the subdivision will be collected in the ditches along Martingale Court and will discharge into Channel No. 1 and then into an existing drainage channel. Also water will be collected in the ditches along Ranch House Road an then into an existing drainage channel. Eventually all runoff will flow into the tributaries of Boggy Creek. Page 1 of 2 T, Methodology: T, Minimum Design Storm Event Pipe Materials: Manning's n Value: Runoff Coefficient: Design Results Applicable Exhibits: CONCLUSION CERTIFICATION TR 55 10 minutes 25 -year & 100 -year - residential street & culvert, drainage channel Corrugated HDPE w /smooth interior 0.012 0.45 Culvert No. 1 Top of Road = 273.17' Q25 = HW 270.54' Q 100 =4.03 HW 1 00= 270.65' Culvert No. 2 Channel No. 1 Top of Road= 274.05' Min. 2' Depth Q =11.13 Q25 = 20 . 29 HW 273.04' D25 = Q 100 =13.26 Qioo = 24 . 09 HW 273.56' D100=0.68' The data presented above and in the Appendices indicates the culvert sizes are in accordance with the requirements. The head water elevation for each of the culverts is less than the top of road elevation for the 100 -yr storm runoff. The velocities in the channels downstream of the culverts are low enough that grass -lined channels are appropriate. The proposed drainage channel will be lined with rock riprap where the slope and velocity are greater than 5 fps, and where erosion is likely to occur. Exhibit A — Drainage Area Map Appendix A — Drainage Area Summary Appendix B — Culvert No. 1, 2 and Channel No. 1 Design Summaries The culverts, roadside ditches and drainage channels for this subdivision were designed in accordance with appropriate engineering standards. I, Joseph P. Schultz, Licensed Professional Engineer No. 65889, State of Texas, certify that this report for the drainage design for Saddle Creek Subdivision, Phase 9, was prepared by me in accordance with the requirements of the Brazos County Road and Bridge Department. OF A .....................i JOSEPH P. SCHULTZ ........................... 658 . F -12327 SCHULTZ ENGINEERING, LLC. Page 2 of 2 J 2 'J1 rt � z n r-+ L � n ^ r 1 ' b Can r� b J x N Y V G� IJ N n ! i V� J t. x D F m 8 8 D /° J I N 1 CN 4. ! � ^ 7� > N I J O ID 00 V CA' Gf _ -mo 260- AV al i a, 4 0v � zz N J I f \26, s s V Jam• N 11 � j f 1 Ono ti Ln w � I i I� �Z Pj 1 . a Saddle Creek Subdivision - Phase 9 Appendix B Pipe Design Summary Pipe Pi Pipe Length Slope Contributing Contributing cin V26 QI" Vim NO. size Drainage Pipes (in) (ft) N Areas (cfs) (fps) Mai (fps) 1 18 67 0 .80 305, 306 Riprap 3.42 4.17 4. 03 4.40 2 58 0.80 308 0.6 11.13 6.51 13.26 18 7.63 Appendix B Channel Design Summary Channel No, Material Slope N Contributing Drainage Areas Contributing Pipes Q10 (cfs) VIO f a V'* Depth (ft) Qw (c VIM (fps) Depth, (ft) 1 Grass 1.50 301,302 20.29 3.29 0.70 24.09 3.51 ----0.76-- 1 Riprap 1.50 301.302 20.29 4.30 0.57 24.09 4.58 0.6 I Riprap 5.69 301, 302 20.29 6.88 _ _--I 0.39 --- 24.09 f 7.26 0.43 I---- ---- _ .......... _ _ — CHANNEL No. 1 - 6' Bottom Width, Sides Slopes - 4:1 .. n" value = 0.035 grass, 0.024 riprap Saddle Creek Subdivision - Phase 9 Appendix A Drainage Area Summary Area # Area, A (acres) C tc (min) 26 year storm 1100 year storm 1 25 (in/hr) Q25 (cfs) 1 100 (in/hr) Q100 (cfs) 301 302 303 1.200 6.090 4.540 0.45 0.45 0.45 10.0 32.0 10.0 10.0 10.0 10.0 9.861 5.33 14.97 20.15 11.639 6.498 -1-1-.639-----23.78- 6.29 17.81 4.71 -- 3.35 ---0.68-,- 0.84 1 13.26 j 5.462 9.861 304 0.900 0.45 0.45 9.861 3.99 2.84 0.58 11.639 11.639 11.639 11.639 305 306 0.640 9.861 9.861 0.130 0.45 0.45 0.45 307 0.160 4.780 10.0 35.0 9.861 1 5.176 0.71 308 1 11.13 6.164 The Rational Method: Q = CIA I = b I (tc+d)e t, = L/(V*60) Q = Flow (cfs) t = Time of concentration (min) L = Length (ft A = Area (acres) V = Velocity (ft/sec) C = Runoff Coeff. I = Rainfall Intensity (in/hr) Brazos County: 25 year sto 100 ne ar storm b =89 b = 96 d = 8.5 d = 8.0 e = 0.754 e = 0.730