Loading...
HomeMy WebLinkAboutFire FlowExhibit B SCHULTZ ENGINEERING, LLC FIRM #4538 WATER SYSTEM FIRE HYDRANT FLOW TEST REPORT Date: 3 -22 -2012 Wellborn SUD Water System Owner: Development Project: Saddle Creek Subdivision Flow Test Location: Martingale Court (between Lots 161 and 162) Nozzle size (in.): 2.5 Discharge Coeff: (c) = 0.90 Pitot Reading (psi): 40 Flowrate Formula: Q= 29.84cd 1060 c = discharge coeff. Flowrate (gpm): d = orifice size (in) P = pitot pressure (psi) Pressure Gauge Location: on Stetson Dr. (@ Martingale intersection) Static Pressure (psi): 82 Residual Pressure (psi): 65 Computed Discharge at 20 psi Residual Pressure: QR = 2131 e p m 54 0.54 Discharge Formula: QR = QF X (hr 0. /hf ) Note: The flow test and report were prepared in accordance with NFPA 291. Report Prepared by: Ricky Flores Deven Doyen, P.E. Others Present: Clendan Adams Britt Curless .I F -12327 SCHULTZ ENGINEERING. LLC. Joe Schultz From: Stephen Cast <wsud.sc @verizon.net> Sent: Thursday, March 22, 2012 11:45 AM To: Joe Schultz Subject: Re: Saddle Creek - Phase 9 Joe, Wellborn Special Utility District inspected and approved the water line construction for Saddle Creek, Phase 9. Stephen Cast General Manager Wellborn Special Utility District - - -- Original Messaae - - -- To: Stephen Last Sent: Friday, March 09, 2012 2:48 PM Subject: Saddle Creek - Phase 9 Stephen, Please check with your guys to see if anything else needs to be done on the waterline for Phase 9 for your acceptance. Thanks Joe Joe Schultz, P.E. Schultz Engineering, LLC 2730 Longmire, Suite A College Station, TX 77845 Office 979.764.3900 Page 1 of 1 Josh Norton - FW: Saddle Creek - Phase 9 From: "Joe Schultz" <joeschultz84 @verizon.net> To: "'Josh Norton "' <Jnorton @cstx.gov> Date: 3/22/2012 1:57 PM Subject: FW: Saddle Creek - Phase 9 Attachments: Waterline Acceptance.pdf Josh, Here is acceptance by Wellborn and the flow test results A copy is being dropped off at your office Joe From: Stephen Cast [mailto:wsud.sc @verizon.net] Sent: Thursday, March 22, 2012 11:45 AM To: Joe Schultz Subject: Re: Saddle Creek - Phase 9 Joe, Wellborn Special Utility District inspected and approved the water line construction for Saddle Creek, Phase 9. Stephen Cast General Manager Wellborn Special Utility District - - - -- Original Message - - - -- From: Joe Schultz To: Stephen Cast Sent: Friday, March 09, 2012 2:48 PM Subject: Saddle Creek - Phase 9 Stephen, Please check with your guys to see if anything else needs to be done on the waterline for Phase 9 for your acceptance. Thanks Joe Joe Schultz, P.E. Schultz Engineering, LLC 2730 Longmire, Suite A College Station, TX 77845 Office 979.764.3900 file: //C: \Documents and Settings \jnorton \Local Settings \Temp \XPgrpwise \4F6B2FD9City ... 3/22/2012