HomeMy WebLinkAboutApplication (12-67)CITY OF COLLEGE STATION
Home ofTexa. A&M University
El. $350 Non - Residential Architectural Standards Building Review Application Fee (if applicable).
$600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is
1% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is
due prior to the issuance of any plans or development permit).
Application completed in full. This application form provided by the City of College Station must be used
and may not be adjusted or altered.
Fourteen (14) folded copies of site plan.
One (1) folded copy of the landscape plan.
One (1) copy of the following for Non - Residential Architectural Standards building review or Northgate
Building Review (if applicable).
❑ Building elevations to scale for all buildings.
❑ A list of building materials for all facade and screening.
❑ Color samples for all buildings or list colors to be used from the approved color palette.
❑ Electronic copy of Site Plan e- mailed to csuelectdesign @cstx.gov.
El. Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
n Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
n Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the
proposed request (if applicable),
N❑, The attached Site Plan Non - Residential Architectural Standards Building Review and Northgate Building
Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not
check off.
El
Date of Optional Preapplication or Stormwater Management Conference 2/5/2011
NAME OF PROJECT Grace Bible Church - Anderson Portable Addition
ADDRESS 700 & 701 Anderson
LEGAL DESCRIPTION (Lot, Block, Subdivision) Crawford Burnett, Tract 59, 4.5 Acres
APPLICANT /PROJECT MANAGER'S INFORMATION (Primary contact for the project):
Name Steve E. Duncan E -mail sduncan @jonescarter.com
Street Address
City Bryan
Phone Number
1716 Briarcrest Drive, Ste. 160
MINIMUM SUBMITTAL REQUIREMENTS:
$932 Site Plan Application Fee.
979 - 731 -8000
SITE PLAN APPLICATION
GENERAL
State Texas Zip Code 77802
Fax Number 979 -
FOR OFFIC
CASE NO.:
DATE SUBMITTED:
PROPERTY OWNER'S INFORMATION:
Name Pat Coyle E -mail jpcoyle @suddenlink.net
Street Address 700 Anderson
City College Station State Texas Zip Code 77840 -3250
Phone Number 979-268 -2695 Fax Number
1/11 Page 1 of 11
ARCHITECT OR ENGINEER'S INFORMATION:
Name Same as Applicant
E -mail
Street Address
City State Zip Code
Phone Number Fax Number
OTHER CONTACTS (Please specify type of contact):
Name
Street Address
State
E -mail
Zip Code
Fax Number
City
Phone Number
Current zoning
Present use of property Church
Proposed use of property Church
Number of parking spaces required N/A Number of parking spaces proposed
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property?
l Yes f No
This information is necessary to help staff identify the appropriate standards to review the application and will be used to
help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made,
vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law.
Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the
application be reviewed under previous ordinance as applicable?
rj Yes
No
If yes, provide information regarding the first approved application and any related subsequent applications (provide
additional sheets if necessary):
Project Name:
City Project Number (in known):
Date / Timeframe when submitted:
Page 2 of 11
Signature and title
Steve E. Duncan, Vice President
N/A
MULTI- FAMILY RESIDENTIAL
Total Acreage
Floodplaln Acreage
Housing Units
# of 1 Bedroom Units
# of 2 Bedroom Units
# of 3 Bedroom Units
# of 4 Bedroom Units
FOR 2 BEDROOM UNITS ONLY
# Bedrooms = 132 sq. ft.
# Bedrooms < 132 sq. ft.
PARKLAND DEDICATION
(Fees due prior to the Issuance of a Building Permit)
# of Multi- Family Dwelling Units
X$1646 =$
# of acres In floodplain
# of acres in detention
# of acres In greenways
Date dedication approved by Parks &
Recreation Advisory Board
COMMERCIAL
Total Acreage
Building Square Feet
Floodplaln Acreage
* Projects that were vested prior to January 1, 2008, per Chapter 245 of the Texas Local Government
Code may be assessed a different amount. Please contact city staff for additional Information.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true
and correct.
Date
, /77
Page 3 of 11
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued.
2. The permit may be revoked if any false statements are made herein.
3. If revoked, all work must cease until permit is re- issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP.
7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post construction.
8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project,
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply.
11. The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details, All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
12, Release of plans to (name or firm) is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction Is contingent on
contractor signature on approved Development Permit.
13. 1, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE.
Property Owner(s)
Engineer Certification:
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
Including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may
require a sedimentation basin.
3. The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines, All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations,
4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS
FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE.
Engineer
Date
Date
Page 4 of 11
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued.
2. The permit may be revoked If any false statements are made herein.
3. If revoked, all work must cease until permit is re- Issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction Including NOI and SWPPP.
7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post construction.
8. Owner hereby gives consent to City representatives to make reasonable Inspections required to verify
compliance.
9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, It shall be
designed and constructed first In the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to Insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply.
11. The Information and conclusions contained In the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
12. Release of plans to (name or firm) is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction Is contingent on
contractor signature on approved Development Permit,
13. 1, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE.
Property Owner(s)
Engineer Certification: •
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
Including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e,, projects over 10 acres may
require a sedimentation basin.
3. The Information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations.
4. 1, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS
FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE.
Date
Date
1/11 Page 4of11