HomeMy WebLinkAboutApplication (3)(*ff
CITY OF COLLEGE STATION
Home of Texas A6M University'
(Check one) ❑ Minor
($700)
Amending ❑ Final ❑ Vacating ❑ Replat
($700) ($932) ($932) ($932)
Is this plat in the ETJ? ❑ Yes No Is this plat Commercial I I or Residential
Ixi
MINIMUM SUBMITTAL REQUIREMENTS:
$700 -$932 Final Plat Application Fee (see above).__
❑ $233 Waiver Request to Subdivision Regulations Fee (if applicable).
❑ $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is
1% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is
due prior to the issuance of any plans or development permit).
❑X Application completed in full. This application form provided by the City of College Station must be used and
may not be adjusted or altered. Please attach pages if additional information is provided.
Fourteen (14) folded copies of plat. (A signed mylar original must be submitted after approval.)
❑ Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
❑ Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
❑ Copy of original deed restrictions /covenants for replats (if applicable).
Title report for property current within ninety (90) days or accompanied by a Nothing Further Certificate
current within ninety (90) days. The report must include applicable information such as ownership, liens,
encumbrances, etc.
Paid tax certificates from City of College Station, Brazos County and College Station I.S.D.
The attached Final Plat checklist with all items checked off or a brief explanation as to why they are not.
NOTE: A mylar of the approved preliminary plan must be on file before a final plat application will be considered
complete. If the mylar is submitted with the final plat application, it shall be considered a submittal for the
preliminary plan project and processed and reviewed as such. Until the mylar has been confirmed by staff
to be correct, the final plat application will be considered incomplete.
Date of Optional Preapplication or Stormwater Management Conference
NAME OF PROJECT Amending Plat - University Oaks, Section Two: Lot 14, 15R1, 15R2, 16R1, 16R2, 24R1, 24R2
ADDRESS 721/723 Dominik Drive
SPECIFIED LOCATION OF PROPOSED PLAT:
APPLICANT /PROJECT MANAGER'S INFORMATION (Primary contact for the project):
Name RME Consulting Engineers (c/o Rabon Metcalf) E -mail ration @rmengineer.com
Street Address PO Box 9253
City College Station
Phone Number (979) 764 -0704
FINAL PLAT APPLICATION
State TX
Fax Number ( 764 -0704
FOR OFFICE USE . 4t1
CASE NO.:
DATE SUBMITTED:
TIME:
STAFF:
Zip Code 77842
Page 1 of 9
PROPERTY OWNER'S INFORMATION (All owners must be identified. Please attach an additional sheet for multiple
owners):
Name Lewis R. Jr. & Kathryn M, Bell E -mail
Street Address 723 Dominik Drive
City College Station State TX Zip Code 77840
Phone Number Fax Number
ARCHITECT OR ENGINEER'S INFORMATION:
Name Same As Applicant
Total Acreage 0.239
Existing Use Duplex
Number of Lots By Zoning District 1 / R -2
Average Acreage Of Each Residential Lot By Zoning District:
0.239 / R -2
Floodplain Acreage 0.0
E -mail
Street Address
City State Zip Code
Phone Number Fax Number
Do any deed restrictions or covenants exist for this property? ❑ Yes IM N
Proposed Use Duplex
Is there a temporary blanket easement on this property? If so, please provide the Volume
Total No. of Lots 1 R -O -W Acreage 0.0
and Page No.
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? C" Yes IR No
This information is necessary to help staff identify the appropriate standards to review the application and will be used to
help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made,
vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law.
Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the
application be reviewed under previous ordinance as applicable?
r Yes
(X No
If yes, provide information regarding the first approved application and any related subsequent applications (provide
additional sheets if necessary):
Project Name: Not applicable
City Project Number (if known): Not applicable
Date / Timeframe when submitted: Not applicable
Page 2of9
A statement addressing any differences between the Final Plat and Preliminary Plan (if applicable):
Not applicable
Requested waiver to subdivision regulations and reason for same (if applicable):
Not applicable
Regarding the waiver request, explain how:
1. There are special circumstances or conditions affecting the land involved such that strict application of the
subdivision regulations will deprive the applicant of the reasonable use of his land.
Not applicable
2. The waiver is necessary for the preservation and enjoyment of a substantial property right of the applicant.
Not applicable
3. The granting of the waiver will not be detrimental to the public health, safety, or welfare, or injurious to other
property in the area, or to the City in administering subdivision regulations.
Not applicable
4. The granting of the waiver will not have the effect of preventing the orderly subdivision of other land in the area in
accordance with the provisions of the Unified Development Ordinance.
Not applicable
Fee in lieu of sidewalk construction is being requested because of the following condition (if applicable):
1. E An alternative pedestrian way or multi -use path has been or will be provided outside the right -of -way;
2. Il The presence of unique or unusual topographic, vegetative, or other natural conditions exist so that strict
adherence to the sidewalk requirements of the UDO is not physically feasible or is not in keeping with the
purposes and goals of the UDO or the City's comprehensive Plan;
3. E A capital improvement project is imminent that will include construction of the required sidewalk. Imminent shall
mean the project is funded or projected to commence within twelve (12) months;
4. I Existing streets constructed to rural section that are not identified on the Thoroughfare Plan with an estate /
rural context;
5. 1 When a sidewalk is required along a street where a multi -use path is shown on the Bicycle, Pedestrian, and
Greenways Master Plan;
Page 3 of 9
1. 1
! The proposed development within an War rtniidential subdivision meeting the criteria in Plating and
kr Older ResIdenlial Subdivisions Section of the :MO; or
f Tho prupotofd dovol4vment contain& frontage on a Frevy 1 Expressway as designated by Map 6.6,
Thoroughfare Plan - Functional Classification. in the City Curopiehensivo Plan.
Cit.:LOW explanation of enitlition identified above:
Not applicable
NOTE: A viraivar tit the tlifewalk requirement arid fee in lieu of sidewalk construction shall nal bo considat ad at the
arne Mine by the Planning & Zoning Coatrinission.
Requested Oversize Participation
Total Linear Footage of
Proposed Public:
Sidewalks
ltanittiy Sower
Water Lines
Channels
Storm Sewers
Bike Lanes / Paths
Slone ire and Ale
Parkland Dedication due prior to filing the Final Plat:
ACREAGE:
No. of acres to b dedicated +
N. of acc 5 in fieedplain
No. of in detention
No of asres in greenways
OR
i EFF IN IFU OE LAND:
No. of SF Dwelling Units X 3 =
(dotal Approved by Paikti Reiiroati on Advisor Board
NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING.
he opptiiiont ho$i prepared this a ppii.ication and certifies that the facts stoted rrnd berrile are
true. correct, and compiete, 1r THIS APPLICA !ION HI F!) RY ANYONE OTHER THAN THE OWNER OF PIT
PROPERTY. this application must be accompunim by o prAvt...0 u! offorney stri(ft/"( ;min the owner. (f them is mcre
than on cyder, all troy4 sign the appimetinin or the power of attorney if the owner is a company, Ow unpiiacilli
nws.t bo 1CC11.7iparlied by proof of authonty tor The coropariyz; ri....pre.s.t.iniativo (o stfr the epOr...ei,kori on its behalf LIEN
flOLDERS iitte titie toped oil.: en owners and the appropriate signatures must bit provided at:
(Inorinbetio' a hove.
ditwaloprnant fait
P 4 u( 9
Owner Certification:
1. N work of any kind may Start unlit a °VITO it; imturird,
2. Tho permit Ittay by revoked if any fake statements are roadie herein.
3, If revoked, all work must cease until: permit is re-mud.
4. Dovelopmeint shall not be used or orioirpied unfit a: Certificate of Occupancy is issued_
5. Thu permit viiitit expire if no significant work s progressing within 24 months of issliturthie,
hi. Other permits may be required to fulfil: loceli stale, arid fwI mquiremants. Ownher will obtain or ShOW
CaltpiiartC0 with all necessary State a:rd Federal Permits pr or to :polisher:lion incluaing NOI and SWPPE.
7. If required, Elevation Certificates yin be provided with elevations certified &rang bonstruction (forms ut stab pm-
pour) and ;Kist construction,
8. Owner hereby gives consent to City roppiermitatives ki !mine reasonable inspections required to verify
obineriunce,
9, If„ s tirlravi,vater mitigation is required, including dotionkin ponds prOpotbird rts part of this project, IT shall be
designed and constructed tirst in thy construction sequence of the project.
10. In accordance -with -Chaptur13-01tho Cody of Ordinances of the City of College .Station, measures Obit be Aukuil
to iriStjte that II debris from consitruction, erosion, and sedimentation shall not by dopositort city streets, rY
existing drainage facilities_ All development shall be i aciiriordonce with the Orme, arid specifications submitted to
omit approved by the City Engineer for the above narned projerit. All of the applicably r:-u irtd Ottlinfint:es of the
City of College Station shall apply_
11. The information and comity:nuns contained in Inc attached plans and supporting documents wilt comply with tho
current requirements of Inc City of College Station, Texas City Code, Chapter 13 and asseroartod OGS Unified
Design Guidelines Teermic Sp FoIoiw inii Standard: Details. Al devetiopment has been designed in
accordance with MI applicable cedes and ordinances cif the City of .Co Hoge Slistion and Stift and rioietat
Reguiations„
12, RtVicaise of plans to (name or firm) is juthorLwd for bidding purposes
only, understand that final approval and release of plans and development for construction is contingent en
narttra dot F;iwtatu re on approved Development Permit.
13. I, THE OWNER AGREE TO AND CERTIFY THAT ALL tri1TATEMTiNTS HERRN, AND IN ATTACHMENTS FOR
THE OtliVETOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOW! roGr, Truir, Na A
ACCURATE.
,.---
/ CA
,, ii - - • t
Propert,l'itihyden;s l i / I
- ;
ETfrQ i I P i
Engineer Certification:
The project has boon dosighod to ensure that stormwater mitigation, includIng detention ponds, proposed as pin/
of t110 p44)0(1 will h constructed first in the construction sequence.
1 wilt obtain or can show compliance wit" all necessary Lotiel, Sloth mut lIciderol Permits prio7 to construction
instait ag NOI and SWPPP. Design will not procludc ciump5uniiaii wilii TPDILS: 1 iii , ryri river l'a acres may
row iru a *t.u.limu.niuip hymn
The information and conclusions °ordained in he attached plans and support :rig documents comely with the
current requirements of the City of Cdtriciii Stotido. Texas City Code, Chapter 13 and associated BC$ Unified
Mtftifili Guidelines. Ail development has been designed 1thale1,1 Witil Lir opplicahle codes and ordinances
of the City of College Station and Star and Foderul Rogulatot is
4. I, THE EN13INP:11R, AGRFF TO AN ;FP,TiFY THAT ALL STATEMENTS HEREIN, AND IN AT
FOR THE DEVELOPMENT PER , PPUGATC1N, A1-41',10 THF SFST OF MY KNOWLEDGE, TRUE. AND
Engine
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Date
Pq 5 ;it 9