Loading...
HomeMy WebLinkAboutEngineer's Cost EstimateItem Description Unit Estimated Quantity Unit Price Total Water System 1 Mobilization and Staking LS 1 2000.00 2,000 2 Erosion and Sediment Control LS 1 1750.00 1,750 3 10" C909 Water Pipe, non- structural backfill LF 85 32.00 2,716 4 8" C909 Water Pipe, structural backfill LF 107 28.00 2,996 5 8" C909 Water Pipe, non - structural backfill LF 185 24.00 4,440 6 Fire Hydrant Assembly (w /valve, vert. extension) EA 2 3500.00 7,000 7 10" x 10" M.J. Tee EA 1 750.00 750 8 10" x 8" M.J. Tee EA 1 650.00 650 9 10" M.J. Gate Valve EA 2 1,850.00 3,700 10 8" M.J. Gate Valve EA 1 1100.00 1,100 11 10" 45° M.J. Bend EA 2 500.00 1,000 12 8" 45° M.J. Bend EA 1 450.00 450 13 Water line Testing LS 1 500.00 500 ESTIMATED WATERLINE CONSTRUCTION $29,0521 SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Wellborn Business Park Engineer's Estimate of Waterline Construction 4 *.i l ��i \ * *? lit. JOSEPH P. SCHULTZ 65889 • F -12327 SCHULTZ ENGINEERING. LLC. — Z`?'I